DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
02/09________________________________________________________________
© Copyright 2009 by National Institute of Steel Detailing and Steel Erectors Association of America
All rights reserved.
No part of this publication may be reproduced without written permission. Published by the
National Institute of Steel Detailing and Steel Erectors Association of America 7700 Edgewater Drive, Suite 670 2216 W. Meadowview Rd, Suite 115
Oakland CA 94621-3022 Greensboro NC 27407
www.nisd.org www.seaa.net
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
90/20
Disclaimer
While much effort has been expended by many persons to assure the accuracy of the information contained herein, neither the National Institute of Steel Detailing nor the Steel Erectors Association of America or no one involved, in the preparation or presentation of this publication can assume any responsibility for errors resulting from the use of the contents of this manual. The accuracy, adequacy and the applicability of all data should be verified by the user's competent person, engineering staff or consultant.
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
I 90/20
TABLE of CONTENTS
-TABLE OF CONTENTS I -PREAMBLE II -THE TEAM III -PRE-DRAFTING IV -CHECKLIST V OSHA MANDATORY SKETCHES (29CFR Subpart R 1926.750 thru 761) (mandatory 7/18/2001) -Critical lifts 1926.751 M1 -Tripping hazards 1926.754(c)(1)(i) M2 -Framed deck openings 1926.754(e)(2)(i)(ii) 1926.754(c)(1)(i) M3 -4-Bolts column anchorage 1926.755(a)(1)(2) (OSHA Mandate) M4a -4-Bolts column anchorage 1926.755(a)(1)(2) (OSHA Mandate) M4b -Minimum 2 bolts connection 1926.756(a)(1)(2) M5 -Perimeter protection 1926.756(e)(1)(2) (Safety lines) M6a -Safety cable connection details 1926.756 (Optional alternative) M6b -Typical safety cable connection details (Optional alternative) M6c -Welded column splice 1926.756(d) (Suggested detail to meet) M7a -Welded column splice 1926.756(d) (Suggested detail to meet) M7b -Heavy column field splice 1926.756(d) (Suggested detail to meet) M7c -Column web safety connection (OSHA Mandate) (Alternate) M8a -Column web safety connection (OSHA Mandate) (Alternate) M8b -Double angle column connections 1926.756(c)(1)(2) (OSHA Mandate) M8c -Beam to column web connection M8d -Column web safety connection (OSHA Mandate) (Alternate) M8e -Typical beam connections (OSHA Mandate) (Alternates) M8f -Typical beam connections (OSHA Mandate) (Alternates) M8g -Beam over column (OSHA Mandate) (Alternates) M8h -Double connection with staggered bolts (OSHA Mandate) (Alternate) M8i -Double connection with end plates (OSHA Mandate) (Alternates) M8j -Bracing minimum connection 1926.756(2)(b) M9 -OSHA.../Joist Girder at column 1926.757 M10 -OSHA.../Steel joists girders 1926.757 M11 -Safety cable connection detail... 1926.760 M12
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
I 90/20
GOOD PRACTICES SKETCHES -The Erector friendly column S1a -Column/Beam to column checklist S1b -Typical column lift details S1c -Bolt access problems at small columns S2a -Bolting access problems S2b -Beam to column web moment connection S2c -Access problem/Hand trap S3 -Puncture/Snagging hazards S4a -Puncture/Snagging hazards S4b -Self support connections S5a -Self support connections S5b -Roll-over protection S6 -Deck supports S7a -Decking supports near cutouts (beam to beam) S7b - Decking supports near cutouts (beam to column) S7c -Out of position bolting/welding S8 -Double angle beam to beam connection S9 -Tube bracing to beam erection detail S10a -Welded bracing erection detail S10b -Solid bar type bracing erection detail S10c -Spandrel detail S11 -Wind-column & lateral stability of spandrel framing S12a -Joist at wind column S12b -Seated connections at column web S13 -Erection problems with HSS braces S14a -Tube bracing to gusset plate erection detail S14b -Joist slip at hip & valley S15 -Deck issues S16 -HSS lintel beam w/shop-attached angle S17 -Seismic load resisting systems S18a -Seismic load resisting systems S18b -Seismic load resisting systems (access holes requirements) S18c -Seismic load resisting systems (weld requirements) S18d -Seismic load resisting systems (welded flange plate)(WFP) S18e
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
I 90/20
APPENDIXES -The tools of the trade A1 -Suggested notes A2 -Direction north/safety connection/beam marking A3a -Typical safety line holes on beam/column A3b -Swinging beams to beams horizontally A4
-Swinging beams & girders to webs of columns-vertically A5a -Table giving increase “I” in inches A5b
-Swinging beams & girders to plate girder-horizontally A6a -Table of increase “I” of max. length “M” over clear dist. “S” A6b
-REFERENCES VI -CONCLUSIONS VII -ACKNOWLEDGEMENTS VIII
-SKETCHES on CD (Inside of front cover) IX
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
II 90/20
PREAMBLE The growing trends towards “Design-Build” and “Fast-Track” methods of construction have made it more important than ever that the cooperation between members of the steel industry become even more concentrated. The ever-increasing demands from insurance and bonding interests as well as codifying bodies and government regulators only serve to emphasize the need for unification. To that end the NISD and SEAA have partnered in the production of this manual. The intent is to permit detailers and erectors together to better provide structures that are safer, timely, and more erectable, and to promote the use of structural steel as the material of choice. At the same time the impact of those demands on all of us associated in the steel community must be minimized if we are to be successful in reaching our goals. By working together we can satisfy our purpose of achieving successful project completion that provides a quality product that is accident free, efficient, productive and profitable for all involved. Following are a number of suggested concepts, hints and illustrations for erection procedures, which have been based on the OSHA 2001(29 CFR 1926.750 thru 761) new steel erection standard and the combined experience of SEAA and NISD members. None of the information presented in this guide is meant to supersede project-specific contracts, codes, specifications, or government regulations. Readers are encouraged to refer to the AISC Code of Standard Practice, the AISC Erector Certification Program, the NISD Industry Standard publication and the AISC “New OSHA Rules Advisory” for additional resources. Also, the NISD Guidelines For The Successful Presentation of Steel Design Documents and the AISC publication Working With Structural Steel In Schedule Driven Projects will provide valuable insight. In all cases the role and responsibility of the design engineer of record is paramount to the proper utilization and approval of the actual use of any information contained herein. The information presented in this publication has been prepared for general information only. While it is believed to be accurate, this information should not be used or relied upon for any specific application without competent professional examination and verification of its accuracy, suitability and applicability by a licensed professional engineer, designer, or architect. The publication material contained herein, is not intended as a representation or warranty on the part of the National Institute of Steel Detailing Inc. or the Steel Erectors Association of America Inc. or of any other person named herein, that this information is suitable for any general or particular use or of freedom from infringement of any patent or patents. Anyone making use of this information assumes all liability arising from such use.
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
III 90/20
THE TEAM Successful steel project completion depends on the cooperative activities of many players. The owner, the architect, the engineer, the controlling contractor, the fabricator, the detailer, the independent suppliers, and the erector all play significant roles. This guideline will focus mainly on the contributions of the detailer and the erector; often two of the last participants to be brought onboard, yet two of the key players in the success of the project. The detailer is often described as an interpreter. He is the “lead off man” on many projects and is often the first to interface with the architect/engineer drawings. His responsibility is to correctly interpret the design information and to relay that data, in the form of shop and field drawings, to the approving agent, the fabricator, and the erector. The exacting nature of the detailer’s work, which requires “zero-defect” production, must account for every piece of steel on the job. He must utilize the design information to produce mill orders and to produce error-free shop drawings. The detailer must provide the erector with not only member placement drawings but also with the assurance that every piece of steel has been detailed, in proper sequence, and that the steel is safely erectable with connections that match, clearances considered, bolt placement possible and all special requirements recognized. If the detailer is one of the first to begin the arduous task of providing successful steel projects, the erector is the last. It is the erector who must make it all come together in the field and the one who is the recipient of any errors or omissions which any of the preceding players may have made. His job, no matter the weather or how challenging the conditions; is to not only bring all the pieces of steel together but to do so with all due consideration to the education and safety of the workers on the job. To permit these players to better accomplish their tasks, communication becomes of utmost importance. Not only must the erector and detailer communicate with each other but the other players must also be involved. Owners should bring all of the players on board as soon as possible and encourage “kick-off” meetings to permit the players to begin to form a team so that communication flows freely and all hands are working towards the common goal. Concepts, methods, and plans must be agreed on; not to mention scheduling. With all players contributing to the best of their ability, from original contract documents to final bolt placement, our project can be brought to the successful completion we all desire.
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
VI 90/20
PRE – DRAFTING Prior to the start of the detailing process, we suggest that (at a kick-off meeting, if possible) the following checklist items be considered:
1) Sequence & schedule of erection: Grid lines, floors, derricking, size, tonnage.
2) Shipping requirements: Site layout, access and lay-down area, splice requirements, and shipping methods. 3) Crane capacity weight and reach constraints and hazards.
4a) Types of Connection: (e.g. seated, shear-tab, moment, girts hung or seated, etc.)
4b) Bolting requirements: (e.g. types, installation “snug-tight”, “slip critical”, Direct Tension Indicators (DTI), etc., clearance for torque guns or tools.
5) Safety requirements: prevailing codes, OSHA’s requirements, fall protection, perimeter protection, safety aids, egress requirements, etc, etc.
5a) Joist Connections 5b) Fall Protection 5c) Column Splicing 5d) Beam to Column Connections 5e) Bracing
6) Field welding requirements: procedures preferences, joint preparation, and access.
7) Communication channels: between erector, fabricator, detailer, professionals, and inspector.
8) Pre-bid value engineering: best connections, shop assemblies, mechanical penetrations reinforcing, tie joists.
9) Responsibilities; contractual, design, connection design, approvals, revisions, payments.
10) Joist/ Deck/ Floor & Roof openings
11) Erectability: bolt access, shop assemblies, clearances for torque guns, hands and tools, leveling devices.
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
V 90/20
CHECKLIST
1) Sequence: Erector/Contractor must establish, prior to commencement of work, the sequencing so that material may be ordered and members detailed in proper order. Detailer must indicate on mill lists, shop drawings, and member placement drawings (plans and elevations) the required sequence. Revisions to the chain of sequence are expensive in terms of time and money.
2) Shipping: The erector may visit the site prior to bidding to establish what, if any,
special conditions exist which are not indicated on the contract documents, however it is the controlling contractors responsibility to provide site access or advise if it is not available. In the event conditions warrant special considerations such as splicing, shipping methods, etc., the erector must advise the detailer and fabricator in a timely manner. Suggested resolution, design and/or approval of the special situation must be reviewed by the appropriate parties.
3) Cranes: The erector must notify the detailer and others if there are any special
requirements due to crane reach, availability, or capacity that will affect someone else’s particular operation. Critical lifts of large members, or irregular shapes, lifting lugs, and/or lifting locations should be defined and the detailer advised so that this information may be given on the drawings if necessary. Provided the erector's directives are received in a timely fashion, the detailer and fabricator should consult with the erector and define a plan of how best to proceed. If the center of gravity must be defined the design engineer should provide this information. The erector may request that the detailer show lifting weights or crane locations on the member placement drawings.
4) Types of Connections: If and when connection types are not dictated on the
design documents the fabricator, detailer, and erector must consult as to what type of connection(s) will be utilized and whose responsibility is the adequacy of the connection; are moment connections field bolted or welded? Are beam to column webs seated and how much tolerance should be allowed to prohibit column leaning in multiple bays: Will girt connections at columns be seated or hung? How are spandrels and kickers treated?
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
V 90/20
5) Bolting: The required type and number of bolts is the responsibility of the design
engineer. However, the detailer must insure that these bolts can not only be entered, but that they can also be tightened. Care must be taken to avoid bolt to bolt interference. Latest bolt specifications must be incorporated. The erector must be made aware of the type of bolt being furnished, the number of washers required and the method of tightening. The introduction of Tension Control Bolts (TCB) and Load Indicator Washers (LIW) has helped the erector to know he has achieved specification requirements. Bolting instructions and requirements must be noted. Bolt placement lists must be accurate and precise.
A minimum of 2 bolts is required at each end of a main member, and recommended at secondary members, for erection. Utilize permanent bolts at beam webs for moment connections whenever possible. When connections to shear tabs require that the bolt hole is located inside the flange, bolt entry and driving clearance become a factor. Try to place bolt holes in a shear tab on the outside of flanges whenever possible (engineer approval may be required if a lever arm is created). If web stiffeners or seats become necessary the ability to erect beams above or below may become a problem.
6) Safety requirements: The OSHA 2001 update requires the engineering community to give certain information to the construction team and identify what creates the lateral stability of a structure when complete; e.g. deck diaphragm shear, concrete cores, masonry shear walls or steel bracing. The detailer and erector should communicate to best solve the issues of temporary bracing and aids. The goal obviously is to stabilize the structure during and after erection. As temporary framing is often not within the detailer’s or fabricator’s scope of work, the erector is responsible for temporary erection bracing, only during the erection process, unless specified otherwise in the contract documents. 6a) Joist OSHA mandates that when columns are not framed in at least two (2) directions with solid members (beams or joist girders) a vertical stabilizer plate shall be provided on each column for an OSHA required bolted steel joist. This plate must be a minimum of 6 inches by 6 inches and located 3 inches below the bottom of the joist with one 13/16 inch diameter hole for guying or plumbing cables.
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
V 90/20
6b) Fall Protection: The most common, if not most important, issue is that of fall protection. Multistory structures require guardrail cable at the floor perimeter and at large interior floor and roof openings. While the erector has been providing these devices for years it is required by OSHA 2001 that this be incorporated into the shop details. The method to accomplish this protection should be agreed upon prior to commencement of detailing. The erector may desire that shear studs or other items be shop attached rather than field applied. In these cases adequate fall protection must be provided and detailer/fabricator notified prior to detailing. 6c) Column Splices: The column length should be designed on the contract documents. In cases where they are not, for structures of one or two stories (with or without a basement), a column length in excess of 40 feet is quite long. While the erector might prefer long columns, and would find a way stabilize them with bracing or framing, it may be necessary for safety or shipping purposes to splice the columns. The detailer should consult with the erector to determine if, and where, a splice may be required. The designer and fabricator should also be contacted to give approval and design of the requested splice. When splicing columns on multistory projects, OSHA has mandated that columns be spliced 4 feet above the finished floor elevation. This permits the required perimeter cable to be installed at the necessary heights. Bolted splices are preferred, but when welded splices are used the 4 feet allows the erector/welder to work in a safe, comfortable position. When welded splices are utilized always prepare the upper column for welding. Tiered columns should always have a lifting device or a hole at the top of the shaft for attaching the hoisting mechanism or cable. 6d) Column Bases: OSHA 2001 requires that all columns now have a minimum of 4 anchor bolts. The detailer should reference to the contract documents to determine how much, if any, over-sizing of anchor rod holes should be provided. The use of leveling devices and what type should also be discussed with the erector.
6e) Beam to Column Connections: per OSHA 2001 directives, all double connections at column webs or beam webs over columns must have staggered clip angles or a beam seat or a top flange clip angle. Where not possible to provide these safety connections, the detailer is required by OSHA to add a note of
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
V 90/20
warning to the erector on the member placement drawings. Deck supports may be required at deck cutouts near beam to beam or beam to column connections. Consult with the erector, fabricator, detailer, and clients to preferred method.
6f) Bracing: A minimum of one bolt at each end of a solid web bracing member shall be used, as directed by OSHA 2001. Holes for erection bolts are required at welded tube bracing. Provide a 1/8 inch oversized slot for erection clearance over gusset and resize the welds accordingly. Check for bolt insertion clearance at gusset plates, end plates, etc. Keep gusset plates to a minimum size by utilizing the uniform force method unless otherwise directed by the contract documents.
7) Field Welding: The erector must advise the detailer prior to shop drawing preparation what type of field welds are desired so that end preparations, root openings etc. may be properly detailed. It is the responsibility of the contract documents, not the erector, to advise the detailer of what and where any NDT is required so that the detailer can identify those areas on the member placement diagrams if requested. Special requirements for seismic considerations should be reviewed.
8) Communication: Contacts and communication are paramount to a successful
project. It is only through the spirit of cooperative communication that success can be achieved and we encourage all parties to appoint a liaison with decision making authority to maintain contact with the other members of the construction/owner team. It should also be remembered by detailer and erector alike that their client should always be contacted whenever work is requested that may affect their client’s scope.
9) Value Engineering: Erectors, detailers, fabricators and others may desire certain
changes be made to the contract documents in order to expedite their portion of the work or to make the design more suitable to their particular operation. There may also be instances where an experienced firm may discover certain changes where, if incorporated, can be beneficial to the firm, the project’s owner, or both. Certain changes may also make the bids more competitive or improve the safety conditions for a supplier. In any event, these changes should naturally be requested as early as possible, prior to bid time if permitted.
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
V 90/20
Requests for certain type splices, connections, shop assemblies, erection procedures, etc., which were not considered in the contract documents should be presented prior to bid time if possible. Concerns about the availability of information to permit detailing-fabrication-erection to proceed in a timely manner should be communicated at this time; in particular concerns about mechanical openings, spandrels, field measurements, drainage, pour stop attachment, brick relief systems or other supplier required data should be addressed promptly.
10) Responsibility: To ensure that all members of the team are treated fairly it must
be remembered that any required or requested changes which differ from information given in the design documents may have an impact financially on other members of the team. It should also be remembered that these changes may result in additional engineering calculations or approvals and possible schedule adjustments. We highly recommend that the proponent of the change communicate with the other players to insure that no one is unfairly jeopardized.
11) Erectability: Last, but not least on our checklist of items to be considered, is the erectability of the member. Can the bolts be entered and driven? Should certain pieces be shop assembled? Can the member be swung into place or do stiffeners, cap plates, connection angles, doubler plates or other items interfere? Are special notes required? Will the mechanical openings be available prior to installation of deck and siding? The ever growing use by the detailer of reproductions of the design documents as member placement plans require certain cautions by the detailer: is the required erection information fully shown? Is the drawing legible in the field or is it cluttered with superfluous information? (shop information, concrete data, sections and views taken without cross reference to where/from each section or view is cut, or references to drawings not included in the member placement drawing being used by the erector).
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
V 90/20
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
SEAA
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
02/09 VI
REFERENCES This document takes references to the following steel industry documents:
NATIONAL INSTITUTE OF STEEL DETAILING www.nisd.org
“Industry Standard” “Guideline For the Successful Presentation of Steel Design Documents”
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
www.aisc.org “Detailing For Steel Construction”
“Code of Standard Practice” “Erector Certification Program”
“Working with Structural Steel in Schedule Driven Projects” “Steel Design Guide Series: Column Base Plates”
“Steel Design Guide Series: Facade Attachments to Steel Frame Buildings” “Seismic Design Manual”
“Steel Construction Manual”
OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION www.osha.gov
New Steel Erection Standard - Subpart R-Steel Erection 1926.750 thru 1926.761 with appendixes A thru H
DEPARTMENT of LABOR
FEDERAL REGISTER PART VI 29CFR PART 1926
SAFETY STANDARDS FOR STEEL ERECTION FINAL RULE 01/18/2001
STEEL ERECTORS ASSOCIATION OF AMERICA
www.seaa.net “DETAILING FOR VALUE AND SAFETY”
FEDERAL EMERGENCY MANAGEMENT AGENCY
“FEMA 350-353” RECOMMENDED SEISMIC DESIGN CRITERIA FOR NEW STEEL MOMENT-FRAME BUILDINGS
AMERICAN WELDING SOCIETY
AWS CODE D1.5 & D1.8
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
02/09 VII
CONCLUSIONS e hope that this document has furnished a greater understanding of those items which erectors and detailers find necessary for the safe and efficient
completion of steel projects. We sincerely hope as well, that you also have gained a greater understanding of the positive contribution that the NISD and the SEAA wish to make by more clearly defining information needed to complete our part of such project. To that end, we believe that we have provided a road map leading to the safe and successful completion of a structural steel frame. The Editors
W
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
02/09 VIII
ACKNOWLEDGEMENTS
This document would have not been possible without the dedicated work of those who devoted countless unpaid hours of research, meetings, sketching, arguing over, polishing and finally editing for the benefit of the end users…you.
1. The editors wish to thank the members of the National Institute of Steel Detailing and the Steel Erectors Association of America for their contribution and support throughout this project. special recognition is given to Robert Beauchamp(NISD), John Metcalfe(NISD), Michel Cloutier(Datadraft), Jim Larson(SEAA) Eddie Williams(SEAA), Duff Zimmerman (SEAA) and Richard Tucker(SEAA) for their efforts.
The Editors
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
02/09 VIII
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
_______________________________________________________________________ XI 90/20
SKETCHES PRINTED or on CD In an effort to disseminate information contained in this guide and to lead towards a standardization of practices in the industry, we have provided you, the end user, with a CD-ROM containing ©AutoCAD .dwg format files of the sketches shown within this document . You are authorized to copy this CD or printed sketches (with acknowledgements) and use to suit specific contracts, fit them into erection or shop fabrication standards or certification program requirements. The more you use them, the better the industry will perform and benefit by making steel the material of choice for structures.
CD is enclosed in your Guide.
Thanks for your support
The Editors
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
_______________________________________________________________________ XI 90/20
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
90/20
COMMENTS & / or SUGGESTIONS
Comments or suggestions worthy of interest for improvement of this document are welcomed, please e-mail or fax to:
The National Institute of Steel Detailing
[email protected] 510-568-3781
The Steel Erectors Association of America [email protected]
413-208-6936
Your Comments:
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
DETAILING FOR ERECTOR'S SAFETY and EFFICIENCY
90/20
NOTES
SEAA
Serving Detailerssince 1969
Serving Erectors Since 1972
BE
CO
ME
A M
EM
BE
R
of
the
Ste
el E
rec
tor
s A
sso
cia
tio
n o
f A
mer
ica
st
ee
l e
re
ct
or
s
as
so
cia
tio
no
f a
me
ric
a
2216
Wes
t Mea
dow
view
Roa
dSu
ite 1
15G
reen
sbor
o, N
C 2
7407
336.
294.
8880
pho
ne41
3.20
8.69
36 fa
xex
ecut
ived
irect
or@
seaa
.net
ww
w.s
eaa.
net
SEA
A
SEA
A
The
Stee
l Ere
ctor
s As
soci
atio
n of
Am
eric
a is
ded
icat
ed to
ad
vanc
ing
the
com
mon
inte
rest
and
nee
ds o
f all
enga
ged
in b
uild
ing
with
ste
el.
Esta
blis
hed
in 1
972,
the
non-
prof
it as
soci
atio
n w
orks
to p
rom
ote
safe
ty, e
duca
tion
and
train
ing
thro
ugh
com
preh
ensi
ve p
rogr
ams
deve
lope
d by
"e
rect
ors
for e
rect
ors"
.
SE
AA
ME
MB
ER
BE
NE
FIT
S
industr
y rep
res
enta
tion
Wor
king
toge
ther
SEA
A m
embe
rs m
eet w
ith n
umer
ous
gove
rnm
ent a
genc
ies
and
stan
dard
s co
mm
ittee
s in
clud
ing:
appl
icat
ion f
or
mem
ber
ship
Firm
Nam
e
Your
Nam
e
Title
Phys
ical
Add
ress
City
Stat
e Zi
p
Phon
e
Fax
Con
tact
nam
e
Con
tact
Titl
e
Con
tact
Em
ail
Doe
s th
e fir
m p
erfo
rm th
e er
ectio
n of
ste
el
and/
or a
llied
mat
eria
l exc
lusi
vely
?
Yes
N
o
Geo
grap
hic
area
cov
ered
by
your
firm
:
How
did
you
hea
r ab
out S
EAA?
Annu
al M
embe
rshi
p D
ues:
Ja
nuar
y-D
ecem
ber
Erec
tors
bas
ed o
n an
nual
rev
enue
vol
ume:
0-3
mill
ion
$450
3-
5 m
illio
n $7
50
5-10
mill
ion
$100
0
10-u
p m
illio
n $1
250
Fabr
icat
ors:
$75
0
Gen
eral
Con
tract
ors
$750
Sup
p. &
Man
ufac
ture
rs $7
50
Che
cks
shou
ld b
e m
ade
paya
ble
to S
EAA.
CC #
Sign
atur
e
Plea
se c
heck
all
cate
gorie
s th
at a
pply.
erec
tors
(see
sca
le)
Stru
ctur
al ste
el, s
teel
joist
sPr
efab
ricat
ed b
uild
ing
and/
or s
idin
gRe
info
rcin
g ste
el a
nd/o
r pos
t ten
sioni
ngM
iscel
laneo
us m
etals
, sta
irs, o
rnam
enta
l iro
nPr
ecas
t con
cret
e - s
truct
ural
Prec
ast c
oncr
ete
- arc
hite
ctur
alM
etal
deck
fabr
icat
ors
($75
0)St
ruct
ural
steel
Stee
l joi
sts -
supp
lier a
nd/o
r sale
sM
etal
deck
- m
anuf
actu
rer
Met
al de
ck- s
uppl
ier a
nd/o
r sale
sRe
info
rcin
g ste
el/w
ire m
esh
Pref
abric
atin
g bu
ildin
gs a
nd/o
r sid
ing
Prec
ast c
oncr
ete
- stru
ctur
alPr
ecas
t con
cret
e - a
rchi
tect
ural
Misc
ellan
eous
met
als, s
tairs
, orn
amen
tal i
ron
gene
ral
cont
ract
ors
($75
0)
supp
liers
and
man
ufac
ture
rs ($
750)
Cran
e sa
les
Wire
rope
, slin
gs, a
cces
sorie
sEq
uipm
ent a
nd/o
r too
lsSa
fety
equ
ipm
ent
Faste
ners
spec
ialt
y se
rvic
es ($
750)
Cran
e an
d eq
uipm
ent r
enta
lsCe
rtifie
d w
eldi
ngM
illwrig
hts,
indu
strial
mac
hine
ry in
stalla
tion
Heav
y eq
uipm
ent m
ovin
g an
d rig
ging
Shea
r stu
d in
stalla
tion
serv
ices
($75
0)Fin
ancia
lIn
sura
nce,
risk
man
agem
ent
Lega
lTe
sting
labs
and
/or i
ndep
ende
nt in
spec
tors
Cran
e ce
rtific
atio
n an
d in
spec
tion
Cons
ultin
g
empl
oye
e saf
ety|
ste
el e
rec
tion t
rai
nin
g
program
s
sea
a an
nual
conve
nti
on &
trad
e show
.
Exp.
2216
Wes
t Mea
dow
view
Roa
d •
Suite
115
• G
reen
sbor
o, N
C 2
7407
• 3
36.2
94.8
880
phon
e •
413.
208.
6936
fax
• ex
ecut
ived
irect
or@
seaa
.net
• w
ww
.sea
a.ne
t
Spec
ialty
Ser
vice
s $7
50
S
ervi
ces
$750
The
SEAA
Con
nect
or� w
as e
xclu
sivel
y de
velo
ped
for i
ts m
embe
rs a
nd p
oten
tial m
embe
rs.
It in
clud
es n
atio
nal e
dito
rials,
boa
rd o
f dire
ctor
pro
files
, Mem
ber D
irect
ory
and
colu
mns
from
w
ell-k
now
n in
dust
ry s
peci
alist
. Re
achi
ng a
ll se
gmen
ts o
f the
ste
el e
rect
or c
omm
unity
, SEA
A Co
nnec
tor m
agaz
ine
is a
grea
t way
to c
onne
ct y
our b
usin
ess
to a
n $8
Billi
on In
dust
ry.
SEAA
’s a
nnua
l con
vent
ion
is a
gre
at o
ppor
tuni
ty to
gat
her w
ith c
olle
ague
s, a
nd fi
nd
solu
tions
to y
our s
hare
d ch
alle
nges
. Th
e co
nven
tion
has
insi
ghtfu
l spe
aker
s, e
xper
t adv
ice,
ed
ucat
iona
l wor
ksho
ps a
nd s
essi
ons,
han
ds-o
n de
mon
stra
tions
with
. Yo
u’ll
take
hom
e va
luab
le in
form
atio
n, n
etw
orki
ng a
nd p
rove
n st
rate
gies
that
will
pro
mot
e yo
ur b
usin
ess.
The
Stee
l Ere
ctor
s As
soci
atio
n of
Am
eric
a (S
EAA)
is a
n ac
tive
parti
cipa
nt in
the
deve
lopm
ent a
nd p
rom
otio
n of
the
indu
stry
Saf
ety
Stan
dard
s th
at im
pact
the
com
mer
cial
con
stru
ctio
n in
dust
ry.
SEAA
has
dev
elop
ed p
artn
ersh
ips
and
allia
nces
with
OSH
A an
d ot
her
Stan
dard
Com
mitt
ees
acro
ss th
e U
SA.
The
mem
bers
of S
EAA
are
affil
iate
d st
eel e
rect
ors,
fabr
icat
ors,
arc
hite
cts,
eng
inee
rs, d
etai
lers
, co
de o
ffici
als,
sup
plie
rs, m
anuf
actu
rers
and
ser
vice
com
pani
es.
ww
w.A
ISC
.org
ww
w.S
DI.o
rg w
ww
.SJI.
org
ww
w.A
SA/S
TAC
.com
ww
w.N
CC
ER.o
rg
ww
w.O
SHA.
gov
ww
w.N
ISD
.org
ww
w.N
CC
CO
.org
w
ww
.ABC
.org
ww
w.tc
a.or
g
The
SEAA
has
dev
elop
ed s
afet
y tra
inin
g pr
oduc
ts to
ass
ist o
rgan
izatio
ns w
ith O
SHA
Com
pli-
ance
, wor
kpla
ce s
afet
y an
d pr
ofes
siona
l/cr
aft-w
orke
r dev
elop
men
t. Pr
ogra
ms
are
avai
labl
e in
En
glish
and
Spa
nish
lang
uage
s w
hich
are
des
igne
d to
ass
ist c
ontra
ctor
s, en
gine
ers,
stee
l de
taile
rs, a
rchi
tect
s, an
d ot
her s
afet
y pe
rson
nel i
n un
ders
tand
ing
and
com
plyi
ng w
ith th
e ne
w
Subp
art R
- Ste
el E
rect
ion
Stan
dard
and
its
train
ing
requ
irem
ents
.
seaa
e|n
ews
& s
afet
y al
erts
Perio
dic
publ
icat
ions
to k
eep
mem
bers
info
rmed
on
emer
ging
regu
lato
ry re
quire
men
ts, n
ew
tech
nolo
gies
, saf
ety
aler
ts a
nd N
ews
- tha
t nec
essit
ate
cont
ract
ors
stay
cur
rent
.
National Institute of Steel Detailing Membership Application The annual membership cycle runs from June 1st through May 31st
���� Regular Membership is open to any company that conducts its office in the Americas for, and is regularly engaged in, the business of steel detailing. Such office shall have been conducted for a minimum period of one year. A member in this category may be chapter affiliated or a member-at-large, and has all privileges and benefits of membership including voting and holding office. Fee Schedule: $290 for companies with a gross annual income of less than $250,000 [June-September] Prorated dues when joining October-January $200 February-May $100 $450 for companies with a gross annual income greater than $250,000 [June-September] Prorated dues when joining October-January $305 February-May $155 ���� Associate Membership is open to any company, national or regional trade or professional association interested in enhancing the detailing profession or the activities of the NISD, whose primary business is not in structural steel detailing. This category includes all privileges and benefits of membership except those of voting and holding office. Fee Schedule: Annual membership fee is $360 [June-September]
Prorated dues when joining October-January $245 February-May $125
���� Individual Associate Membership is open to a steel detailer who does not own a company. This category also includes other persons interested in the future of the steel detailing industry who do not fall in the category of Regular or Associate membership. This category has limited privileges and benefits of membership, which precludes them from voting and holding office.
Fee Schedule: Annual membership fee is $65 Annual dues of $65 are renewable on June 1st
���� Overseas Membership is open to any company that conducts a regular office for, and is regularly engaged in, the business of steel detailing outside the Americas. Such office shall have been conducted for a minimum period of one year. Members in this category may vote (no proxy votes), but they may not hold national office.
Fee Schedule: Annual membership fee is $360 [June-September]
Prorated dues when joining October-January $245 February-May $125
���� Member Emeritus Membership is open to any individual who was a former regular member of the NISD and has retired from the competitive field, but wishes to remain active in the NISD. Members in this category may not hold office. Fee Schedule: Annual membership fee is $100 Annual dues of $100 are renewable on June 1st
The undersigned hereby applies for membership in the National Institute of Steel Detailing, Inc.
Name ___________________________________________________Title _________________________________
Company Name__________________________________________________________________________________
Address ______________________________________________________________________________________
City ________________________________ State/Province ______________________Zip/Postal Code____________
Country _______________________________________
Telephone _______________________________________ Fax ___________________________________________
E-mail ________________________________________ Web site _______________________________________
Payment in US Dollars Method of Payment Membership Fee: US$__________ ���� Check, payable to: NISD, Inc.
7700 Edgewater Dr., Suite 670 Postage/handling, add: Oakland, CA 94621-3022
$24 for Canada $__________
$38 for International $__________ ¨̈̈̈ MasterCard ¨̈̈̈ Visa Number:_______________________________ Expiration Date:________ TOTAL ENCLOSED US$__________
Signature:___________________________________________________ ¨ Check this box to receive a free subscription to Modern Steel Construction magazine (U.S., Canada & Mexico only)