Company Profile
PT. SAHABAT NUSANTARA TEKNOLOGI INOVASITokopedia Tower (Ciputra World 2) 20th Floor Unit 20C
Jl. Prof. Dr. Satrio Kav.11 Karet Semanggi, Setiabudi
Jakarta Selatan 12930
P: +62 21 259 816 81 F: +62 21 259 820 69
www.santi-group.com
CONFIDENTIAL
About SANTI Group
PT. Sahabat Nusantara Teknologi Inovasi (SANTI) was established in 2003
as a consultant as an Engineering & Services Company in Oil & Gas and
Petrochemical.
In 2011, SANTI expands their business in servicing the materials and
services by partnering with qualified and reputable world class overseas &
local manufacturers.
We have been serving numerous reputable Clients in Indonesia from small
and standard items to the big size equipment/packages, , complicated
engineering equipments such as Reactor Internals, Filtration and Coalescer
Packages, Dehydration Vessel, Static Equipment and Water Treatment
Package.
Having strength in network for sourcing the materials, procurement
services and listed in almost all of Oil, Gas and Petrochemical companies,
we have been branding and growing as trusted partner for our clients for
their requirement of equipment and goods.
SANTI Group put the first priority to the HSE (Health Safety and
Environment) requirement and received the 1st vendor Award for the Turn
Around activities 2013 by PERTAMINA.
Board of Directors
YUSUF REZA SHAHAB/
PRESIDENT DIRECTOR
Has more than 30 years experience in Oil and Gas
(Upstream and Downstream), Petrochemical, and
Geothermal from business development, sales and
marketing and project execution.
Yusuf is founder of SANTI Group on 2003 previously
he worked in PT. Purna Bina Indonesia (A Bechtel
company), Brown & Root (now KBR),KTI (Now under
Technip), Black & Veatch and PT. Pacific Oil & Gas
(National company)
Yusuf has experience as Advisor and also supply chain
to various multinational companies in Oil & Gas sector
to develop projects, obtaining the permits from GOI.
Yusuf has extensive network with various Government
Authorities, Major National Oil Companies and
Regulators.
Having more than 20 years experience in
Supply Chain Management of major EPC
contractors for Oil, Gas and Petrochemicals
business.
Dola has managed the supply chain and the
procurement services for multi million
dollar LNG, Petrochemicals and Gas plant
projects for major international players. He
worked previously with Chandra Asri
Petrochemical Centre, IKPT leading EPC
contractor and PT. Suluh Ardhi Engineering
in various position including Head of
Procurement Division.
ABDULLAH RIZA SHAHAB (Dola)/
MANAGING DIRECTOR
Shantanu has over 30 years of experience in
Oil & Gas (Upstream & Downstream),
Petrochemicals, Manufacturing & Services
industries.
Shantanu has held senior positions with
major multinationals such as Hess, Chevron,
ExxonMobil, Indorama and APP. Prior to
joining with SANTI Group Shantanu was the
Country General Manager and SEA Business
Development Director for WorleyParsons.
Shantanu's strengths and expertise are, to
provide the leadership to the business,
customer relationships, commercial
negotiations, business strategy and peoples
management.
SHANTANU G GANGRAS /
SALES & MARKETING DIRECTOR
SANTI Group Organization Structure
PRESIDENT DIRECTORYUSUF REZA SHAHAB
STRATEGIC PLANNINGAFFAN AKMAL
MANAGING DIRECTORABDULLAH RIZA SHAHAB
BUSINESS OPERATIONEKA RACHMI BUDI UTAMI
SALES & MARKETINGSHANTANU GANGRAS
SALES TEAM ADMIN & FINANCE TEAM
CONFIDENTIAL
BUSINESS ANALYST TEAM
Nitrogen Generator
Water Treatment Systems
Design and Engineering
Project Management
Maintenance
Fabrication
Internal Engineering Design
Principal Engineering Design
Financing
Procurement team
Project Control
Reporting & Documentation
Spare Parts
Turn Around Materials
Package
Static
Water Treatment
SANTI Group’s Services
Sample of One Package Solution
UOP Adsorbent
Ceramic Ball
Internal Tray
Johnson Screens
Pall Filtration Systems
UOP Membrane and Process
System
Project Management
Engineering Design
Piping Supply
Instrument and Electrical Supply
Our Commitment
This certification further strengthens our commitment to our customers and our Company Quality
Policy Visioミ : さOne of the leading engineered products and services solution provider in
Indonesia for Oil, Gas, Petrochemical and Power Plantsざ
CONFIDENTIAL
Our Achievement
CONFIDENTIAL
SKK Migas and Pertamina Registration
CONFIDENTIAL
SANTI BUSINESS LICENSES
PERTAMINA CSMS / HIGH RISK CATEGORY
The Principals
Our Customers
Our Success Story
Project Title:
Total Work Replacement of Centerpipe
and Scallops 300-V-1/2/3
Project Time: 2013
Client :
PT. Pertamina (Persero) RU II Dumai
End User:
PT. Pertamina (Persero) RU II Dumai
Project Description:
Full provision of Field Service Team
including supporting equipment
CONFIDENTIAL
Our Success Story
Project Title:
Total Work Replacement of
Centerpipe and Partial Replacement
for Scallops 84-R-201-A/B/C/D
Project Time: 2014
Client :
PT. Pertamina (Persero) RU IV Cilacap
End User:
PT. Pertamina (Persero) RU IV Cilacap
Project Description:
Full profision of Field Service Team
including supporting equipment
CONFIDENTIAL
Our Success Story
Project Title:
Repair Work of Centerpipe and
Partial Replacement for Scallops 32-
R-101/102/103
Project Time: 2015
Client :
PT. Pertamina (Persero) RU VI
Balongan
End User:
PT. Pertamina (Persero) RU VI
Balongan
Project Description:
Full profision of Field Service Team
including supporting equipment
CONFIDENTIAL
Our Success Story
Project Title:
Replacement for Regenerator Inner
Screen 310-V-5
Project Time: 2017
Client :
PT. Pertamina (Persero) RU II Dumai
End User:
PT. Pertamina (Persero) RU II Dumai
Project Description:
Full profision of Field Service Team
including supporting equipment
CONFIDENTIAL
Our Success Story
Project Title:
FILTER 2 - Gas Liquid Coalescer
Project Time: 2014-2015
Client : WIKA - TECHNIP Consortium for
Matindok Gas Development Project in Central
Sulawesi
Project Description:
We are supported by PALL. The projects took -
/+ 6 マoミths siミce it’s awarded. Aミd ミow the package has run.
Our Success Story
Project Title: Condensate
Coalescer Package
Project Time: 2014-2015
Client : WIKA - TECHNIP
Consortium for Matindok
Gas Development Project in
Central Sulawesi
Project Description:
SANTI as fabricator lead the
project including the
procurement, supervise,
logistic
CONFIDENTIAL
Our Success Story
CONFIDENTIAL
Project Title:
Produced Water Coalescer Package
Project Time: 2014-2015
Client : WIKA - TECHNIP Consortium for
Matindok Gas Development Project in
Central Sulawesi
Project Description:
SANTI as fabricator lead the project
including the procurement, supervise,
logistic
CONFIDENTIAL
Our Success Story
Project Title:
Diesel Filter (STG Boiler Project)
Project Time: 2015
Client : PT. Rekayasa Industri
End User: PUSRI
Project Description:
SANTI fabricated 2 vessels filter, the
purpose of this filter to waive particle on
the diesel before enter the compressor.
CONFIDENTIAL
Our Success Story
Project Title:
Diesel Filter (Paku Gajah Dev. Project)
Project Time: 2016
Client : PT. Suluh Ardhi Engineering
End User: PT. Pertamina EP
Project Description:
We fabricated 2 (two) unit vessels for this
project
CONFIDENTIAL
Our Success Story
Project Title:
Filter (Medco Block A Projet)
Project Time: 2017
Client : Encona - JGC Indonesia
End User: PT. Medco E&P Indonesia
Project Description:
SANTI was fabricated 13 filter vessels for this project,
now is waiting commissioning test result.
Chemical Injection
Produced Water Filter
Our Success Story
Project Title:
Produced Water Treatment Package
Project Time: Jan 2016 - April 2016
Client : WIKA - TECHNIP Consortium for Matindok
Gas Development Project in Central Sulawesi
Our Success Story
Project Title :
Pekerjaan Pengadaan dan Pemasangan Trafo 5
MVA/150 KV PLTA Singkarak
Client & End User : PT. PLN (Persero) Sektor
Pembangkitan Bukit Tinggi
Location : Bukit Tinggi, Sumatera
Project Description:
Supply, Installation and Commissioning for Trafo
5 MVA/150 KV PLTA Singkarak
Our Success Story
Project Title :
Rotary Valve
Client :PT. Pertamina (Persero)
RU IV Cilacap
End User : PT. Pertamina
(Persero) RU IV Cilacap
Location : Cilacap, Central Java
Project Description: Repair and
re-instal rotary valve
Ongoing Projects
I
Project Title :
Pressure Vessel, Pig Launcher and
Tanks
Client : PT. KELSRI
End User : PT. Pertamina EP - Adaro
Location : Kalimantan
Project Progress:
70% (waiting End User readiness)
Project Description:
Fabrication Separator & Scrubber
refer to ASME VIII Sec 1
Fabrication Pig Launcher and Pig
Receiver complete with Safety
Interlock System
Fabrication Crude Oil Tank as per
API 650
CONFIDENTIAL
Ongoing Projects
II
Project Title : Direct Heater
Client : PT. KELSRI
End User : PT. Pertamina EP - Adaro
Location : Kalimantan
Project Progress:
85% (waiting End User readiness)
Project Description:
Fabrication Direct Heater as per ASME Sec VIII
Sec 1 and API 560 completed with Burner
Management System
CONFIDENTIAL
Ongoing Projects
III
Project Title :
Pengadaan dan Pemasangan 2 (dua) unit Filter
Coalescer di Area Laval CD&GP Plaju
Client : PT. Pertamina (Persero) RU III Plaju
End User : PT. Pertamina (Persero) RU III Plaju
Location : South Sumatra
Project Progress:
95%
Project Description:
Engineering design, fabrication, civil construction
and installation for filter coalescer in Area Laval
CD&GP Plaju
CONFIDENTIAL
Ongoing Projects
V
Project Title :
Dew Point Control Unit and Pre Treatment Unit
Client :PT. Enviromate Technology International
End User :PT. Pertamina EP Cepu – JTB Project
Location : Cepu, Central Java
Project Progress: Technical Document Submission
(5%)
Project Description: Design and supply Dew Point
Control Unit and Pre-Treatment Unit
IV
Project Title:
Pembongkaran, Pengadaan dan Penggantian
Primary Equipment (PMT) Kawangkoan Line 1
dan Otam – Lopana Line 1150 KV; Sawangan
Ranomuut Line 2 70 KV PLN Sulutenggo
Client : PT. PLN (Persero) Wilayah Sulawesi Utara,
Sulawesi Tengah dan Gorontalo
End User: PT. PLN (Persero) Wilayah Sulawesi
Utara, Sulawesi Tengah dan Gorontalo
Location : Manado
Project Progress: On fabrication process, ready to
deliver in Mid Nov (60%)
Project Description: as tittle
Solution Partner