Company profileHead Office
Production Site 1Production Site 2 (New)
Employees
General director
Activity
Turnover in 2013
150049, Russia, Yaroslavl, Magistralnaya st. 20aPhone: +7 (4852) 48-64-19Fax: +7 (4852) 48-64-20
Russia, Yaroslavl, Magistralnaya st. 20a (1 500 sq. meters)Russia, Yaroslavl Municipal District, Ivnyaki Village, Nechernozemye 6(2 500 sq. meters)
70
REBROV Evgeniy, MBA
R&D, Production of fuel supply equipment (pumps, nozzles, valves) for various types of vehicle heaters, brake booster vacuum pumps, pumps and nozzels for DPF regeneration and SCR system
5 000 000 USDEstablished in 1991
ZMZ-514 Diesel Engine
Major Manufacturing Equipment:
Poly GIM Swiss-type CNC Lathe / 4 machines /Max turning diameter Ø 26 (32) mm
Leadwell 4-Axis CNC Vertical Machining Center / 8 machines /Table size 890x500 mm, Max workpiece mass 300 kg, Tool storage capacity 24 pcs
Grinding Machines:Flat Surface Grinder / 3 machines /
Rotary Surface Grinder / 1 machine /
Cylindrical Grinder / 2 machines /
Internal Cylindrical Grinder / 1 machine /
Centerless External Grinder / 1 machine /
MIKRON Haesler SA Rotary transfer Machine / 4 machines /
Various types of Customized Machine Tools (Vetterly Engineering AG) for nozzles manufacturing
Flat Surface Lapping Machine / 1 machine /
Input electrical power - 800 kVA
Gas boiler house - 780 kW
Utility lines – ready to use
Total Area – 2567 m2
Height – 8 m
Distance to M8 Federal road – 2 km
INTA-Center Research and Development is: - Process Approach to Management - Factual Approach to Decision Making - Over 40 years experience of design and development automotive parts and production processes - Over 10 years experience of APQP project management - Over 5 years of ISO/TS Core Tools usage - 10 issued patents - Robust product and process designs
- Our QM System has certified according to ISO 9001 since 2003 - 8 years ago we have started ISO/TS 16949 implementation - 2008 FIAT has evaluated INTA-Center QMS by auditing and recognized as FPT potential supplier - 2012 INTA-Center QMS has been prepared to ISO/TS Certification - 2013 Ford-Sollers has recognized INTA-Center as potential supplier
Our team attains high-quality level (0..50 ppm) by involving each employee into Continual Improvement Process
Evgeniy REBROVGeneral Director, MBA
Education:Yaroslavl Polytechnic Institute / 1982 / Diploma in EngineeringDeutsches Institut für Betriebswirtschaft GmbH /1992/The Open University (United Kingdom) / 1996 / Professional Diploma in ManagementLucas Automotive GmbH / 1998 / Management trainee jobThe Grenoble Graduate School of Business / 2004 / MBA in Technology Management
Professional Experience:JSC "INTA-Center" / 2010-present / General Director
JV "Sollers" and "Fiat Powertrain Technologies" / 2007-2010 / Director of the Project on F1A Diesel engine manufacturing plant establishing
JSC "Zavolzhye Motor Plant" the member of "Sollers" Group / 2004-2007 / Executive Director
JSC "Yaroslavl Fuel Equipment Plant" / 1997-2004 / Technical Director. Board of Directors Member
JSC "RusPromAuto" / 2003 / The Head of "Heavy Duty Trucks" Business Restructuring (JSC “AZ Ural”)
JSC “Yaroslavl Fuel Equipment Plant” / 1982-1997 / Designer, test-engineer, chief of the projects, chief of
bureau…
Maya KOMISSAROVADeputy General DirectorFinance Manager
Alexey KLIMENKOHead of Production Department
Andrey SHADRUNOVHead of R&D Department
Tatyana SMIRNOVASenior Accountant
Olga KARASEVASenior Economist
Dmitry SMIRNOVHead of Sales and Purchasing Department
Timofey PELEVINHead of Quality Assurance Department
INTA-Center meets all customer requirements, keeping to terms of a Contract
INTA-Center offers an acceptable price, because of good cost management (Lean process improvement and KAIZEN)
JUST-IN-TIME is our Purchasing, Production and Supplying processes Philosophy. We are doing Risks assessment to guarantee meeting delivery schedule:
- We have a Contingency plan; - We can provide reserve stocks; - We can deliver goods by various ways: corporate vehicle, cargo company, railway service - We have well-developed traffic networks, the distance to Moscow is 280 km
We are ready to invest in new automotive parts production plant, which would be able to satisfy any Automotive Manufacturer