COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo...

74
We Plan the World of Tomorrow COMPANY PROFILE 2020

Transcript of COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo...

Page 1: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

COMPANY PROFILE 2020

Page 2: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

ORIGINS AND HISTORYOur heritage

Technital is a private joint stock company which was established in 1964.During the succeeding years the original company absorbed other companies and underwent a series of merges, evolving into the strong and independent TECHNITAL S.p.A. of today.

Page 3: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

FACT SHEETCompany description.

Technital possesses a highly skilled staff of over 180, some 20-25% of whom permanently abroad, who are accustomed to working in the main international languages (English, French, Spanish, Arabic) and using international engineering codes and contract conditions.

Technital works to provide intelligent, innovative and environmentally friendly solutions to modern engineering requirements, and today it has offices throughout Italy and branches worldwide.

Page 4: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

THE TECHNITAL BRANDThe future in a better perspective.

Our vision is to shape the world of tomorrow for the highest living standards. Therefore we want to be one of the best companies in the world in providing consultancy services to improve people’s lives by planning, designing and implementing infrastructures.

By embracing such a vision, the company carries out activities by implementing comprehensive and sustainable investment programs.

The company bases its services on a sound technical background and on a mutual commitment with Clients, with employers and with shareholders.

Our key values are quality, efficiency, technology and process control and our greatest resource is our people.

Page 5: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

OUR NUMBERS

History : more than 50 years

Number of permanent employees Worldwide : about 180

The average revenue of the last 10 years : about 45 million

Clients: IFI, Government Authorities and Private Industry

Number of ongoing projects worldwide : around 150

Number of branches/permanent organizations worldwide : 14

Page 6: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

AREASOF

SPECIALISATION

PORTS

ENERGY

HYDRAULICS WATER TREATMENT

WASTE TREATMENT

ENVIRONMENT

ROADS AND MOTORWAYS

RAILWAYS AND URBAN

TRANSPORT

AIRPORTS URBAN PLANNING, BUILDINGS AND ARCHITECTURE

MARINE AND COASTAL

Page 7: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

ENVIRONMENTAL SUSTAINABILITY

Technital has a long-term and broad vision that aims to improve the quality of life and enhance local resources.In a modern world, the design of any project must incorporate the awareness of the impact that every single work may have on a global scale on the environment and therefore on the communities.

Page 8: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

OUR STAFFOur greatest resource.

Technital believes human resources to be the true driving force in a company.The high quality products offered by the company are the result both of the professional expertise of individuals and of the common spirit of collaboration in the relationships between the individuals and the groups that make up the staff.

Page 9: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

WORLDWIDE COMPANY – PERMANENT ORGANISATIONS

DjiboutiDjibouti

ZambiaLusaka

QatarDoha

UruguayMontevideo

IraqBaghdad

TunisiaTunis

ItalyHQ - Verona

GeorgiaTbilisi

PolandWarsaw

CroatiaZagreb

AlgeriaAlgiers

Trinidad & TobagoPort of Spain

KenyaNairobi

ArmeniaYerevan

IndiaNew Delhi

Page 10: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

COUNTRIES WORKED INAfghanistan, Albania, Algeria, Angola, Argentina, Armenia, Australia, Austria, Bahamas, Benin, Bolivia, Bosnia & Herzegovina, Brazil, Bulgaria, Burkina Faso, Burundi, Cayman Islands, Colombia, Croatia, Cuba, Cyprus, Czech Republic, Denmark, Djibouti, Dominican Republic, Egypt, Ethiopia, Georgia, Germany, Ghana, Greece, Guatemala, Hungary, India, Iraq, Italy, Jordan, Kenya, Libya, Madagascar, Malaysia, Mali, Mauritania, Monaco, Montenegro, Mozambique, Nicaragua, Niger, Norway, Panama, Peru, Poland, Qatar, Republic of Haiti, Romania, Russia, Rwanda, Saudi Arabia, Senegal, Slovenia, Somalia, Spain, Sudan, Syria, Tanzania, Togo, Trinidad & Tobago, Tunisia, Turkey, Uganda, Ukraine, United Arab Emirates, United Kingdom, U.S.A., Uruguay, Venezuela, Yemen, Zambia.

Page 11: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

A SELECTION OF SOMEOF THE COMPANY’S 3000 PROJECTS:

Page 12: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

Chioggia Inlet

Malamocco Inlet

Lido Inlet

1/61/6

MO.S.E. AT THE THREE INLETS OF VENICE LAGOONItaly

Client: Venezia Nuova Consortium for Ministry of Public Works | Cost of works: 8,000,000,000 Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks, refuge harbors, foundations and ancillary structures

Page 13: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/62/6MO.S.E. AT THE THREE INLETS OF VENICE LAGOON | Italy

Page 14: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/63/6MO.S.E. AT THE THREE INLETS OF VENICE LAGOON | Italy

Page 15: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

4/64/6MO.S.E. AT THE THREE INLETS OF VENICE LAGOON | Italy

Page 16: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

5/65/6MO.S.E. AT THE THREE INLETS OF VENICE LAGOON | Italy

Page 17: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

6/66/6MO.S.E. AT THE THREE INLETS OF VENICE LAGOON | Italy

Page 18: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

Palermo

Messina

1/41/4

SICILIAN MOTORWAYS: A20 ME-PA AND A18 SR-GELAItaly

Client: Sicilian Motorways Consortium for ANAS | Cost of works: 2,500,000,000 approx.Preliminary and Detailed Design, EIA, Tender Documents & Construction Supervision

GelaSiracusa

Page 19: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/42/4SICILIAN MOTORWAYS: A20 ME-PA AND A18 SR-GELA | Italy

Page 20: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/43/4SICILIAN MOTORWAYS: A20 ME-PA AND A18 SR-GELA | Italy

Page 21: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

4/44/4SICILIAN MOTORWAYS: A20 ME-PA AND A18 SR-GELA | Italy

Page 22: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

Piacenza

Parma

Reggio Emilia

Modena

1/41/4

Milan

HIGH SPEED RAILWAY LINE MILAN-NAPLES SECTION: PIACENZA–MODENA (42km)

Italy

Client: Grandi Lavori Fincosit, contractor for Ferrovie dello Stato (Italian State Railway Company)Cost of works: 482,000,000Construction design, assistance during construction

Page 23: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/42/4HIGH SPEED RAILWAY LINE MILAN-NAPLES | Italy

Page 24: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/43/4HIGH SPEED RAILWAY LINE MILAN-NAPLES | Italy

Page 25: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

4/44/4HIGH SPEED RAILWAY LINE MILAN-NAPLES | Italy

Page 26: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

Rio Misicuni

DAM ON MISICUNI RIVERBolivia

Client: Consorcio Hidroeléctrico Misicuni | Cost of works: 58,000,000Technical Assistance for the new dam on Misicuni river in Bolivia (the dam crest is 512 m long, 7 m large and 120 m high, with a total volume of 3.80 million of m³) 1/51/5

Page 27: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/52/5DAM ON MISICUNI RIVER | Bolivia

Page 28: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/53/5DAM ON MISICUNI RIVER | Bolivia

Page 29: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

4/54/5DAM ON MISICUNI RIVER | Bolivia

Page 30: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

DAM ON MISICUNI RIVER | Bolivia 5/55/5

Page 31: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

Industrial Interchange

1/41/4

INDUSTRIAL INTERCHANGE IN DOHAQatar

Client: Public Works Authority | Cost of works: 150,000,000 Post Contract Consultancy Services and Quantity Survey

Page 32: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/42/4INDUSTRIAL INTERCHANGE | Qatar 2/42/4

Page 33: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/43/4INDUSTRIAL INTERCHANGE | Qatar

Page 34: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

4/44/4INDUSTRIAL INTERCHANGE | Qatar

Page 35: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

Palermo

1/31/3

METROPOLITAN LIGHT RAILWAY OF PALERMOItaly

Client: Municipality of Palermo | Cost of works: 570,000,000Preliminary design, environmental impact study, geological and geotechnical studies and investigations

Page 36: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/32/3METROPOLITAN LIGHT RAILWAY OF PALERMO | Italy

Page 37: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/33/3METROPOLITAN LIGHT RAILWAY OF PALERMO | Italy

Page 38: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

1/31/3

OROPOUCHE BANK RECLAMATION PROJECTTrinidad and Tobago

Client: National Energy Corporation of Trinidad and Tobago Limited (NEC)Cost of works: 3,200,000,000 (estimated)Master plan, EIA, Detailed Design and Tender Documents for a new industrial site by building an off-shore reclaimed area

Page 39: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/32/3OROPOUCHE BANK RECLAMATION PROJECT | Trinidad and Tobago

Page 40: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/33/3

Access from Trinidad

OROPOUCHE BANK RECLAMATION PROJECT | Trinidad and Tobago

Primary road network

Secondary road network

Connecting bridge

LNG (Liquified Natural Gas)

Syngas

Ethylene

Ammonia

Titanium dioxide

Food industry

Mechanical industry

Lumber industry

Textil industry

Steelworking

Aluminium

Main fire station

Car park

Water purification plant

Electric power station

Incinerator

Green spaces for environmental restorationGreen spaces for mitigation and recreationGreen spaces for camouflage and mitigation

Water collection basin

Phase perimeter

LEGEND

Page 41: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

Container terminal

1/41/4

DORALEH CONTAINER TERMINALDjibouti

Client: Djibouti Port Authority and Dubai Ports International | Cost of works: 150,000,000Design review and Supervision of construction works

Page 42: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/42/4DORALEH CONTAINER TERMINAL | Djibouti

Page 43: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/43/4DORALEH CONTAINER TERMINAL | Djibouti

Page 44: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

4/44/4DORALEH CONTAINER TERMINAL | Djibouti

Page 45: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

Otopeni International Airport

1/61/6

OTOPENI INTERNATIONAL AIRPORT IN BUCHARESTRomania

Client: Ali Trasporti Aerei S.p.A. (A.T.A.) | Cost of works: 60,000,000Preliminary and Final Design

Page 46: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/62/6OTOPENI INTERNATIONAL AIRPORT IN BUCHAREST | Romania

Page 47: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/63/6OTOPENI INTERNATIONAL AIRPORT IN BUCHAREST | Romania

Page 48: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

4/64/6OTOPENI INTERNATIONAL AIRPORT IN BUCHAREST | Romania

Page 49: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

5/65/6OTOPENI INTERNATIONAL AIRPORT IN BUCHAREST | Romania

Page 50: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

6/66/6OTOPENI INTERNATIONAL AIRPORT IN BUCHAREST | Romania

Page 51: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

Community College Area

1/41/4

COMMUNITY COLLEGE IN DUKHANQatar

Client: Qatar Petroleum | Cost of works: 100,000,000Concept, Preliminary & Detailed Design and Tender Services.

Page 52: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/42/4COMMUNITY COLLEGE IN DUKHAN | Qatar

Page 53: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/43/4COMMUNITY COLLEGE IN DUKHAN | Qatar

Page 54: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

4/44/4COMMUNITY COLLEGE IN DUKHAN | Qatar

Page 55: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

New Port Area

1/61/6

DESIGN OF NEW PORT OF AL FAWIraq

Client: Ministry of Transport | Cost of works: 10,350,000,000Master Plan, Design, PMC, Works Supervision

Page 56: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/62/6DESIGN OF NEW PORT OF AL FAW | Iraq

Page 57: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/63/6DESIGN OF NEW PORT OF AL FAW | Iraq

Page 58: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

4/64/6DESIGN OF NEW PORT OF AL FAW | Iraq

Page 59: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

5/65/6DESIGN OF NEW PORT OF AL FAW | Iraq

Page 60: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

6/66/6DESIGN OF NEW PORT OF AL FAW | Iraq

Page 61: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

Konza Techno City

EPCF FOR INFRASTRUCTURE DEVELOPMENT OF KONZA TECHNO CITY Kenya

Client: Konza Technopolis Development Authority (KoTDA) | Cost of works: 367,000,000Concept, Preliminary, Detailed and Final Design, Contract Management and Construction Supervision 1/41/4

NAIROBI

Page 62: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

2/42/4EPCF FOR INFRASTRUCTURE DEVELOPMENT FOR PHASE 1 KONZA TECHNO CITY | Kenya

Page 63: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

EPCF FOR INFRASTRUCTURE DEVELOPMENT FOR PHASE 1 KONZA TECHNO CITY | Kenya 3/43/4

Page 64: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

EPCF FOR INFRASTRUCTURE DEVELOPMENT FOR PHASE 1 KONZA TECHNO CITY | Kenya 4/44/4

Page 65: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

OCEAN CAY MSC MARINE RESERVE

1/31/3

CRUISE DOCKING FACILITIES - OCEAN CAY MSC MARINE RESERVEBahamas

Client: GLF Construction Corporation | Cost of works: 25,000,000Detailed Design, Site Supervision, Technical Assistance during Construction

Page 66: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

1/21/2CRUISE DOCKING FACILITIES - OCEAN CAY MSC MARINE RESERVE | Bahamas 2/32/3

Page 67: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

CRUISE DOCKING FACILITIES - OCEAN CAY MSC MARINE RESERVE | Bahamas 3/33/3

Page 68: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

CABLE STAYED BRIDGE OVER RIO OZAMA

1/31/3

SANTO DOMINGO METRO – CABLE STAYED BRIDGE OVER RIO OZAMA Dominican Republic

Client: Yellow Ingenieros & Arquitectos | Cost of works: 50,000,000Specialistic analysis, Independent check of the detailed design of the bridge

Page 69: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

SANTO DOMINGO METRO – CABLE STAYED BRIDGE OVER RIO OZAMA | Dominican Republic 2/32/3

Page 70: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

3/33/3SANTO DOMINGO METRO – CABLE STAYED BRIDGE OVER RIO OZAMA | Dominican Republic

Page 71: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

1/31/3

AL FAW PENINSULA INDUSTRIAL AND URBAN PLANNINGIraq

Client: Ministry of Transport | Cost of works: 25,000,000,000 approx.Planning, Design, tender documents preparation

AL FAW PENINSULA INDUSTRIAL AND URBAN PLANNING

Page 72: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

AL FAW PENINSULA INDUSTRIAL AND URBAN PLANNING | Iraq 2/32/3

Page 73: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

AL FAW PENINSULA INDUSTRIAL AND URBAN PLANNING | Iraq 3/33/3

Page 74: COMPANY PROFILE 2020 - Technital · Detailed Design of mobile surge barriers (MO.S.E. - Modulo Sperimentale Elettromeccanico) to regulate the tidal flows, including navigation locks,

We Plan the World of Tomorrow

Follow us on:

www.technital.net

TECHNITAL S.p.A.Via Carlo Cattaneo 20, 37121 Verona – Italy Tel.: +390458053611; Fax.: [email protected]