Building for the future
Community update 4
Environmental Impact Statement Public Exhibition
The NSW and Federal Governments, Transurban and the Westlink M7 shareholders are planning to construct and
operate a tolled motorway linking the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant
Hills (NorthConnex).
NorthConnex is being assessed under and has been
declared State Significant Infrastructure and Critical State Significant Infrastructure.
The NSW Department of Planning and Environment (DP&E) has placed the NorthConnex Environmental Impact
Statement (EIS) on public exhibition, from 15 July 2014. Written submissions should be sent to the DP&E and will be
received during the public exhibition period.
Part 5.1 of the Environmental Planning and Assessment Act 1979
Latest news
The NorthConnex CommunityInformation Centre located at354-356 Pennant Hills Road,Pennant Hills, will be open duringthe exhibition period, Mondayand Thursday, 9am to 4pm andSaturday, 10am to 2pm.Drop in to talk to our staffor to view the EIS.
July 2014
www.northconnex.com.au
NorthConnex will deliver significant benefits to local communities by easing congestion on
Pennant Hills Road, putting more than 5,000 trucks a day underground and returning local streets
to local communities.
219tunnel
around
Key features
NorthConnex includes twin motorway tunnels around nine
kilometres in length with two lanes and an additional
breakdown lane in each direction. The tunnels would have
an increased height clearance of 5.3 metres and a speed
limit of 80 km/h.
Motorway would be built with capacity for a third lane
in each direction if required in the future
Northern interchange with Pennant Hills Road and
the M1 Pacific Motorway
Southern interchange with Pennant Hills Road and
the Hills M2 Motorway
Integration work with the Hills M2 Motorway including
the provision of a new westbound lane on the Hills
M2 Motorway from Pennant Hills Road to the
Windsor Road interchange
Project features:
�
�
�
�
�
�
�
�
�
�
Tie-in works connecting tunnel on and off-ramps to
the existing M1 Pacific Motorway, extending to the
north of Edgeworth David Avenue
A motorway control centre, ventilation outlet and
associated facilities located near the southern
interchange
A northern ventilation outlet
and associated facilities
Switching station on Coral Tree Drive
Two mid-tunnel support facilities including an air
intake system, emergency smoke extraction and
substation
Modifications to local roads including widening of
Eaton Road near the southern interchange and
repositioning of the Hewitt Avenue
cul-de-sac near the northern interchange.
located within the M1
Pacific Motorway corridor
Boundary Road
Boundary Road
New
Lin
eR
oad
New
Lin
eR
oad
Epping Road
Epping Road
Junction RoadJunction Road
Edgeworth David Avenue
Edgeworth David Avenue
HORNSBYHORNSBY
BAULKHAM
HILLS
BAULKHAM
HILLS
NORTH
WAHROONGA
NORTH
WAHROONGA
WAHROONGAWAHROONGA
THORNLEIGHTHORNLEIGH
NORMANHURSTNORMANHURST
PENNANT HILLSPENNANT HILLS
WEST PENNANT
HILLS
WEST PENNANT
HILLS
BEECROFTBEECROFT
NORTH ROCKSNORTH ROCKS
CARLINGFORD
NORTH
CARLINGFORD
NORTH
EPPINGEPPING
CASTLE HILLCASTLE HILL
WAITARAWAITARA
TO NEWCASTLETO NEWCASTLE
TO BLACKTOWNTO BLACKTOWN
Northern
interchange
Southern
interchange
North Shore Line
North Shore Line
Nor
ther
n Li
ne
Nor
ther
n Li
ne
Hills M2 Integration
2
7
8
00 2km2km11
N
3
1
Dar
ling
Mill
sCre
ek
Dar
ling
Mill
sCre
ek
Mar
s Creek
Mar
s Creek
3
4
6
5speedlimit
80
1 2
34
Coral Tree Drive, switching station
Southern interchange site and motorway control centre
Wilson Road site
Trelawney Street site
Pioneer Avenue site
Northern interchange site
Bareena Avenue site
Junction Road site
Tunnel support facilities and worksites
1
2
3
4
5
6
7
8
Windsor Road
Darling Mills Creek
Barclay Road
Yale Close
Hills M2 Motorway worksites
1
2
3
4
Tunnel
Tunnel on-ramps and off-ramps
Hills M2 Motorway integration
Road
Future North West Rail Link (tunnel)
Railway
LEGEND
Saturday 26 July 2014
1pm to 4pmPennant Hills Golf Club
Corner Copeland Road and Burns Road South, Beecroft
Thursday 31 July 2014
6pm to 9pmMuirfield Golf Club
Barclay Road, North Rocks
Wednesday 6 August 2014
6pm to 9pmHornsby RSL
4 High Street, Hornsby
Saturday 9 August 2014
2pm to 5pmPennant Hills Community Centre
Corner Yarrara Road and Ramsay Road, Pennant Hills
The Hills Shire Council3 Columbia Court, Baulkham Hills
Hornsby Shire Council296 Pacific Highway, Hornsby
Ku-ring-gai Council818 Pacific Highway, Gordon
Turramurra Library5 Ray Street, Turramurra
Department of Planning and Environment23-33 Bridge Street, Sydney
Nature Conservation Council of NSWLevel 2, 5 Wilson Street, Newtown
Roads and Maritime Head Office North SydneyLevel 9, 101 Miller Street, North Sydney
EIS display locations
Air quality public forum
The project team will be hosting a topic specific public forum on air quality
Hornsby RSL,
4 High Street, Hornsby
At this forum, project and independent air quality specialists will deliver a presentation on air quality and explain the air
quality assessment methodology and key findings, as described in the EIS. A group forum question and answer session will
follow the presentation. The forum will be professionally filmed and made available to view on the NorthConnex website
for members of the community who are unable to attend. By attending the forum you are consenting to being filmed.
Tuesday 29 July 2014
7pm to 9pm
Additional locations where the EIS document can beviewed are provided on the project website
www.northconnex.com.au
Focus on Hills M2Motorway integration
Wednesday 23 July 2014
6pm to 9pmPennant Hills Golf Club
Corner Copeland Road and Burns Road South, Beecroft
Project information
The NorthConnex EIS is available on the project
website at www.northconnex.com.au.
View the project information and speak with the
project team at one of the following community
drop-in sessions:
Community drop-in sessions
Hornsby Central Library28 - 44 George Street, Hornsby
Pennant Hills LibraryCorner Ramsey Road and Yarra Road, Pennant Hills
Epping LibraryChambers Court, Epping
Baulkham Hills LibraryRailway Street, Baulkham Hills
DP&E prefers to receive written submissions online
via their website:
If you would like further information, to register to receive project updates, would like to provide feedback or discuss
the project, you can contact the project team by email [email protected], or call the project information line
(free call) 1800 997 057.
NorthConnexIndicative project dates
Sept 2013State Significant Infrastructure
Application
Oct 2013Director General provides environmental
assessment requirements
Nov 2013 Submission of three competitive tenders
Mar 2014 Government announcement ofpreferred scheme and public display
July 2014 Environment Impact Statementpublic exhibition period
Sep 2014 Submission analysis and reporting
Late 2014 Project approval target
Late 2014 Construction contract finalised
Early 2015 Construction starts
Late 2015 Hills M2 Motorway integrationwork starts
2019 Tunnel open to traffic
Mid 2015 Tunnelling work starts
WE
ARE
HERE
RMS 14.282
Have your say
NorthConnex welcomes your feedback on the EIS.
DP&E requests that your submission includes:
Your name and address.
Whether you support or object to the project
or if you are just providing comment
�
�
All submissions will
be posted on DP&E’s website. If requested,
your name can be removed to protect your
privacy but you must state this in your
submission
� Disclosure if you or an associate have made a
political donation of $1000 or more during the
past two years.
www.planning.nsw.gov.au
If you cannot lodge your submission online it can be
sent via email to:
or via mail to Director – Infrastructure Projects
Department of Planning and Environment
Application number - SSI 13_6136
Major Projects Assessment
GPO Box 39 Sydney NSW 2001
Written submissions must be received
during the public exhibition period.