For information about the Parramatta Light Rail project, visit parramattalightrail.nsw.gov.au Email: [email protected] | Call: 1800 139 389 (24 hours) Upcoming work and traffic changes Parramatta CBD – June to November 2020 The $2.4 billion Parramatta Light Rail will connect Westmead to Carlingford via the Parramatta CBD and Camellia, transporting around 28,000 people every day to key destinations, new communities and essential services. It is expected to open in 2023. Stage 2 Works in the Parramatta CBD will start late May and continue through to November 2020, involving work along Church Street between Macquarie to Market Streets, and micro-tunnelling along Church Street between Centenary Square to Lennox Bridge. Work to install new and relocate existing utilities will continue along the rail alignment. Parramatta Connect has been engaged by Transport for NSW to complete this work. Changed traffic conditions: Church Street between Lennox Bridge and Victoria Road From 8pm Friday 29 May: Church Street, between Market Street and Victoria Road, will be changed to one way northbound only. Vehicles travelling southbound along Church Street will need to detour left or right at Victoria Road. Motorists can access Novotel Hotel and surrounding businesses via Marist Place and Market Street. Signage and traffic detours will be provided. Please see overleaf for a map showing the location of work and changed traffic arrangements. Upcoming work: Church, Market, Macquarie, Phillip, George, Smith and Charles Streets From 6am Monday 1 June, civil (surface) works will start along Church Street, with work zones established from Macquarie to Palmer Streets. Work activities will include: Site establishment and traffic control including installation of hoarding, signs, fencing, barriers and gates Excavation, piling, trenching, earthworks and backfilling for installation of drainage, poles, pipes, conduits and pits Concrete works including installation of plinths, paving slabs, kerbs and platforms Removal and rezoning of parking and traffic arrangements Site investigations, deliveries and surveys Outdoor dining, fencing, hedge and tree removal Footpaths on each side of Church Street with a corridor of 2.5 metres will be maintained to allow access to businesses during operating hours. Hoarding and signage will be installed for the safety of pedestrians. Existing zebra pedestrian crossings will be removed and pedestrian crossings will be at signalised intersections only to maintain pedestrian safety. Utility relocation works will continue at various locations in the Parramatta CBD and will include installing telecommunications, water, gas, electrical, and street lights along Church and Macquarie Streets. Temporary road closure: Macquarie Street between Marsden and Smith Streets Macquarie Street will be closed between Smith and Marsden Streets from 6pm Friday 5 June to 6am Tuesday 9 June for the installation of utilities. Detour is via George and Phillip Streets to travel westbound. Access to Macquarie Street from Horwood Place will be temporarily closed. Local access will be provided to United Lane and Church Street through prior consultation. COMMUNITY NOTIFICATION 22 May 2020 – PLR IW 67 Parramatta Light Rai l Im Ar..:l bic Translating and Interpreting Services f /CU requite tr e se ~ ... 1 ces -:if an il' ::erp~eter olesse c;:intact th~ TraM lc t ho and ln ~rpr -:-ti nc S~r ... 1 ~c- (Tl5 Mat10n;:ilJ " n 131450 ~rd ::;c~ thF!'""'I te; t~IP:p"u''lnP. P;rr;:;m ;:r~ ;i I 1q1t P.;11 on 1AOO 1.39 :389 ½J,all ½fal1J ½fol l..1>.t ~ !L....i~l ,r.-~. ~fa.;!~ ..:.:Sil! ~ !\.wa;.~I .,Jlo,IJ 131 450 :J)I J&, (TIS National) 1800139 389 _.i.;J , > (Parramatta Light Rail) llLAI. J-1/ ~' Trt;tdit ionc:11 Chin e se Wl*lZ:1;:.t~- i·'P:;fA. ~ l! W1 31450 c•l·'t;'flJi;P;;;;tl/ :5, Transl ating and Interpreti ng Ser-vice ( TI S Nati onal) , •~)k1c tit : -J t-= T P,:u rnm.:itt.l ~~ if.I~ :. P.::irr'Llm .:itt.-:. Light RaiD 'r)jfj;~ ,r, 18 0 0 139 389 Simplif i ed Chinese ~!l!'P.\',t~ - i-'• .ncr,,,i. : ;; li/JJ 131 450 .;l l".;i.1' ~; , lo Tdl , ~ j~Translating and l nterprc-ti ng Service (TIS National). ~A <-·f t!.ff.l1.> . 1 f PMr aml'!ltta ~Pl'!lrramatta llght Ra lD 1J 4' . it 1800 139 389 Hind i <tf;\ 'r"TI:l t,) t ~"1:-IT ¼T'1'\ a_~ l1<IT ( TIS Nati onal) q;t 131450 1:'Z'f.R'if.'I ~;,.m~]lt~~ c11~~ {'!'I ( Parramatt fl Light Rflil) ~r;. ~ '-h f--t .. -14 1800 139 389 n<f.Rmm Ko r ean "* ,:,'Afif '@.ll.i;,f i;I "' Xl !;ft!IJ:! 1 31450<;1 t!iC1 ';.! * C ' Aj ~I~ 1r - ,s -;_H ,,, 1 \.'!) OIi ;:c t 11\" 1 ' ~ If+ ,a~oo m 38~"' Ju ·LI ..'. 7 0l-'=- ~I [P,;i nwmilttil U ~ht Rilll l~I t! ,;:+ttl 9' 2J il Qt, Al q ."

Transcript of COMMUNITY NOTIFICATION 22 May 2020 – PLR IW 67

For information about the Parramatta Light Rail project, visit parramattalightrail.nsw.gov.au Email: [email protected] | Call: 1800 139 389 (24 hours)

Upcoming work and traffic changes Parramatta CBD – June to November 2020

The $2.4 billion Parramatta Light Rail will connect Westmead to Carlingford via the Parramatta CBD and Camellia, transporting around 28,000 people every day to key destinations, new communities and essential services. It is expected to open in 2023.

Stage 2 Works in the Parramatta CBD will start late May and continue through to November 2020, involving work along Church Street between Macquarie to Market Streets, and micro-tunnelling along Church Street between Centenary Square to Lennox Bridge. Work to install new and relocate existing utilities will continue along the rail alignment.

Parramatta Connect has been engaged by Transport for NSW to complete this work.

Changed traffic conditions: Church Street between Lennox Bridge and Victoria Road

From 8pm Friday 29 May: • Church Street, between Market Street and Victoria Road, will be changed to one way northbound only. • Vehicles travelling southbound along Church Street will need to detour left or right at Victoria Road. • Motorists can access Novotel Hotel and surrounding businesses via Marist Place and Market Street. • Signage and traffic detours will be provided. Please see overleaf for a map showing the location of work and changed traffic arrangements.

Upcoming work: Church, Market, Macquarie, Phillip, George, Smith and Charles Streets

From 6am Monday 1 June, civil (surface) works will start along Church Street, with work zones established from Macquarie to Palmer Streets. Work activities will include: • Site establishment and traffic control including installation of hoarding, signs, fencing, barriers and gates • Excavation, piling, trenching, earthworks and backfilling for installation of drainage, poles, pipes, conduits and pits • Concrete works including installation of plinths, paving slabs, kerbs and platforms • Removal and rezoning of parking and traffic arrangements • Site investigations, deliveries and surveys • Outdoor dining, fencing, hedge and tree removal

Footpaths on each side of Church Street with a corridor of 2.5 metres will be maintained to allow access to businesses during operating hours. Hoarding and signage will be installed for the safety of pedestrians. Existing zebra pedestrian crossings will be removed and pedestrian crossings will be at signalised intersections only to maintain pedestrian safety.

Utility relocation works will continue at various locations in the Parramatta CBD and will include installing telecommunications, water, gas, electrical, and street lights along Church and Macquarie Streets.

Temporary road closure: Macquarie Street between Marsden and Smith Streets

Macquarie Street will be closed between Smith and Marsden Streets from 6pm Friday 5 June to 6am Tuesday 9 June for the installation of utilities. Detour is via George and Phillip Streets to travel westbound. Access to Macquarie Street from Horwood Place will be temporarily closed. Local access will be provided to United Lane and Church Street through prior consultation.

COMMUNITY NOTIFICATION 22 May 2020 – PLR IW 67

Parramatta Light Rail

Im Ar..:lbic

Translating and Interpreting Services f /CU requite tr e se ~ ... 1ces -:if an il'::erp~eter olesse c;:intact th~ TraM lctho and ln ~rpr -:-tinc S~r ... 1~c­(Tl5 Mat10n;:ilJ " n 1314 5 0 ~rd ::;c~ t hF!'""'I te; t ~IP:p"u''lnP. P;rr;:;m ;:r~;i I 1q1t P.;11 o n 1AOO 1.39 :389

½J,all ½fal1J ½fol l..1>.t ~!L....i~l ,r.-~. ~fa.;!~ ..:.:Sil! ~~I~ ~!\.wa;.~I ~ .,Jlo,IJ 131 450 :J)I J&, (TIS National)

1800139 389 _.i.;J, > (Parramatta Light Rail) llLAI.J-1/ ~'

Trt;tdit ionc:11 Chin e se

Wl*lZ:1;:.t~- i·'P:;fA. ~ l!W 131450 c•l·'t;'flJi;P;;;;tl/ :5, Translating and Interpreting Ser-vice ( TIS National) , •~)k1c tit: -Jt-= T P,:u rnm.:itt.l ~~if.I~ :. P.::irr'Llm .:itt.-:. Light RaiD 'r) jfj;~,r, 180 0 139 389

Simplified Chinese ~!l!'P.\',t~ - i-'•.ncr,,,i. :;; li/JJ 131 450 .;l l".;i.1'~; , loTdl,, ~j~Translating and lnterprc-ting Servic e (TIS National). ~ A<-·ft!.ff.l1.>.1f PMr aml'!ltta ~~ ~Pl'!lrramatta llght Ra lD

1J 4'. it 1800 139 389

Hind i

<tf;\ ~ 'r"TI:l t,) ~ t ~"1:-IT ¼T'1'\ a_~ l1<IT (TIS National) q;t131450 1:'Z'f.R'if.'I ~;,.m~]lt~~

c11~~ {'!'I (Parramattfl Light Rflil) ~ ~r;.~'-hf--t .. -14 1800 139 389

n<f.Rmm ~ Ko r ean "* ,:,'Afi f '@ .ll.i;,f i;I "' Xl !;ft!IJ:! 131450<;1 t!iC1 ';.! * C' Aj ~ I~ 1r-,s-;_H,,,1 \.'!)OIi ;:ct 11\"1' ~If+ ,a~oo m 38~"' ~ Ju ·LI ..'.

7

0l-'=-~I ~ [P,;inwmilttil U ~ht Rill ll~I t! ,;:+ttl 9'2J il Qt, 0~~ Al q ."

For information about the Parramatta Light Rail project, visit parramattalightrail.nsw.gov.au Email: [email protected] | Call: 1800 139 389 (24 hours)

Work zones and traffic changes on Church and Market Streets

Parramatta Light Rail

1--1.J.J /JJ ~ (./J

--.I

iii i 0

<..: 0

Panamatta Local Court

one-way northbound

l ______ \ Prince Alfred

Square

·---..... ____ _

'

No access from Victoria Road

Rivers Novo tel Thea Hotel

[ti' 0:: 0:: 0 1./'/

NOTTO SCALE

---+ GENERAL TRAFFIC

---+ LOCAL ACCESS

---+ TRAFFIC DETOUR

PEDESTRIAN ACCESS

- WORK AREA

For information about the Parramatta Light Rail project, visit parramattalightrail.nsw.gov.au Email: [email protected] | Call: 1800 139 389 (24 hours)

Site compounds and micro-tunnelling: Centenary Square

A micro-tunnelling machine (small scale tunnel-boring machine) will be launched from Centenary Square to upgrade drainage under Church Street between Centenary Square and Lennox Bridge. Tunnelling minimises the impact of construction compared to street-level work. Excavation of the tunnel shaft and drilling from Centenary Square to Parramatta River will start early June, with completion November 2020.

Pedestrian access will be maintained through Centenary Square with minor changes to existing pedestrian routes. Vehicle access points to Centenary Square will change temporarily.

Traffic and pedestrian access

Traffic control will be in place to ensure traffic, pedestrians and the public can move around the work zones safely. Traffic management will include temporary road, footpath or lane closures (except for Church Street between Market and Macquarie Streets, which is a permanent closure) and temporary removal of kerbside parking within the work zone. Parking on Market Street will be adjusted to accommodate the site establishment.

Please follow the direction of traffic controllers and signs and proceed carefully.

What equipment will be used? Equipment will include but is not limited to, concrete saws, jackhammers, compactors, rock breakers, excavators, pick and carry (franna) cranes, Hiab loader cranes, drills, power tools, hand-held tools, trucks, light vehicles, lighting towers for night works and vacuum excavation trucks. When will the work take place?

Standard construction hours are 7am to 7pm Monday to Friday, and 7am to 6pm on Saturday and Sunday for the CBD.

Some works will be carried out at night from 7pm to 7am and on weekends due to lower volumes of road users and pedestrians, and to maintain public safety and maintain footpath access during business hours. When we need to work at night, a maximum of four nights of noisy work will be carried out in any seven-day period.

A detailed work schedule can be found at www.parramattalightrail.nsw.gov.au/weekly-works.

This work is being coordinated with other contractors engaged by Transport for NSW to minimise impacts to residents, businesses and traffic.

How will the work affect you? There will be intermittent noise, dust and vibration associated with this work with pedestrian and traffic diversions in place. There will be intermittent noise and vibration associated with these ongoing works. A maximum of four nights of noise generating works will be completed in any seven-day period. We understand our work may be disruptive and we apologise for any inconvenience.

We will make every effort to minimise the impacts by: • Completing work activities during standard construction hours, where possible • Providing respite periods for any high noise activities • Programming the noisiest activities first and measures such as noise blankets and non-tonal reversing beepers • Monitoring and reviewing noise levels • Using water carts to wet down areas as required • Consulting with directly affected residents and businesses • Turning off equipment and vehicles when not in use

For information about the Parramatta Light Rail project, visit parramattalightrail.nsw.gov.au Email: [email protected] | Call: 1800 139 389 (24 hours)

Parramatta CBD work locations Works will take place in the areas highlighted below:

Contact us If you have any urgent enquiries or complaints during this work, please call our 24-hour Community Information Line on 1800 139 389. To find out more about the project or to discuss your preference for work hours, visit the Parramatta Light Rail website www.parramattalightrail.nsw.gov.au or email [email protected]. Stay up-to-date with what’s happening by registering your contact details at www.parramattalightrail.nsw.gov.au/subscribe.