ARQ 91 102 UC CHILE © Alberto Castex © Alberto Castex Under the program Quiero Mi Barrio [I love my neighborhood] –developed by the Chilean government for the physical and social recovery of 200 districts throughout the country– this project creates a place to gather a divided community. Taking advantage of a slope in the site’s topography, the building multiplies the public land and thus increases the possibilities for community use. Keywords · conflict, neighborhood, social architecture, public space, Chile This publicly funded project was developed as part of the recovery of one of the 200 most deteriorated and vulnerable neighborhoods in Chile. In a complex context, once must ask what should be done when the commission is unwanted or rather when its construction becomes the subject of conflicts and disputes between different sectors of the neighborhood. The possibility of recovering the street, one of the few public spaces in the neighborhood, gave us an opportunity to rethink the community meeting space. Instead of locating in a leftover site (as is usually done), this time it was proposed as an articulating space. Situated between the last terrace of the city and a park in one of the ravines towards the Elqui valley, the new building is located on a hillside. We were able to take advantage of the slope to organize the program under a lookout terrace and create a space of at least three neighborhood community center 3arquitectos La Serena, Chile 2010 - 2011

Transcript of community enterc - SciELO · Ronald Neuburg, Luis Rojas Ubicación / Location Población 17 de...

ARQ 91 102 UC CHILE

© Alberto Castex © Alberto Castex

Under the program Quiero Mi Barrio [I love my neighborhood] –developed by the Chilean government for the physical and social recovery of 200 districts throughout the country– this project creates a place to gather a divided community. Taking advantage of a slope in the site’s topography, the building multiplies the public land and thus increases the possibilities for community use.

Keywords · conflict, neighborhood, social architecture, public space, Chile

This publicly funded project was developed as part of the recovery of one of the 200 most deteriorated and vulnerable neighborhoods in Chile.

In a complex context, once must ask what should be done when the commission is unwanted or rather when its construction becomes the subject of conflicts and disputes between different sectors of the neighborhood.

The possibility of recovering the street, one of the few public spaces in the neighborhood, gave us an opportunity to rethink the community meeting space. Instead of locating in a leftover site (as is usually done), this time it was proposed as an articulating space.

Situated between the last terrace of the city and a park in one of the ravines towards the Elqui valley, the new building is located on a hillside. We were able to take advantage of the slope to organize the program under a lookout terrace and create a space of at least three neighborhood

community center3arquitectos

La Serena, Chile

2010 - 2011

Tegu

alda

Arauco

Lingu

e

Los L

aure

les

Las

Mar

avill

as

Los G

ladi

olos

Jose

Mar

ia C

aro

Los A

zaha

res

Sgto. Candelaria

3 Pon

ient

e3 P

onie

nte

El Trebol

Rio Bueno

Mar

ta B

rune

tt

Tucapel

Gua

yaca

n

El Kisco

Gua

yaca

n

Real

Aud

enci

a

Rapa

nui

Vict

oria

Rio Limari

Rio Rinihue

Pje. R. Callecalle

Pje. C. Saavedra

Rio Mapocho

Rio

Cla

ro

Rio

Cho

apa

Independencia Norte

R. A

uden

cia

Rio

Turb

io

Los Andes

C. C

onch

a

J. Fe

rnan

dez

2 Po

nien

te

Lincoyan

Ines de Suarez

Bio-bio

Los P

lace

res

Lincoyan

Independencia Sur

Ines de Suarez

Parque Coll

D-9Escuela

DigederMulticancha

Iglesia

17 de SeptiembrePoblación

J. Gaspar Marin

InfantilJardin

Rio

Lauc

a

Avenida Arauco

Los P

lace

res

Calle Tucapel

Mar

ta B

rune

tt

Mar

ta B

rune

tt

C6'

44,50

45 4847464443 47.546.545.544.543.5 48.5

49.5

49

50

S

S

N

42.5

1

2

3

O B R A S Y PROY EC TOS 103 WO RK S AND PROJEC T S

© Alberto Castex

Arquitectos / Architects

3Arquitectos. Nelson Sepúlveda, Freddy Sepúlveda

Arquitecto asociado / Associated architect

Mabel Peña

Colaboradores / Collaborators

Ronald Neuburg, Luis Rojas

Ubicación / Location

Población 17 de Septiembre, la Antena, La Serena, Chile

Cliente / Client

Municipalidad de La Serena, Ministerio de Vivienda y Urbanismo, Cuarta

Región, Chile

Ingeniería estructural / Structural engineering

Ronald Segovia

Construcción / Building contractor

Constructora Erices & Toro Ltda.

Instalación eléctrica / Electrical system

Eduardo Ávalos

Instalación sanitaria / Plumbing

Eduardo Ávalos

Materiales / Materials

Estructura de hormigón armado a la vista; terminaciones en

policarbonato, ladricretos de hormigón prefabricado, perfiles metálicos /

Reinforced concrete structure; finishings in policarbonate, precast concrete

and steel profiles

Presupuesto / Cost

usd$700 / m2

Superficie construida / Built area

700 m2

Año de Proyecto / Project year

2008

Año de construcción / Construction year

2010 - 2011

nelson sepúlveda<[email protected]>

Architect, Universidad del Bio Bio, Chile (1996). Master in Projective Didactics, Universidad del Bio Bio, Chile (2013). He is the director of the School of Architecture at the Universidad de La Serena (Chile), teaches degree project studio and is partner at 3arquitectos.

freddy sepúlveda<[email protected]>

Architect, Universidad de La Serena, Chile (2004). His degree project was awarded with the first prize at the xiv Biennale of Architecture of Chile. He teaches degree project studio at the Universidad de La Serena (Chile) and is partner at 3arquitectos.

Planta emplazamiento / Site Plan E. / S. 1: 5.000

Planta nivel +44,5 m / Floor plan level +44,5 m E. / S. 1: 500

leyenda / Legend

1. Espacio multiuso / Mutipurpose space 2. Cocina / Kitchen 3. Bodega / Cellar

ARQ 91 104 UC CHILE

© Alberto Castex © Alberto Castex

© Alberto Castex

associations with multi-functional spaces that house municipal offices for family counseling, a dining room, kitchen, services, event rooms, and meeting rooms.

In turn, the exercise of bringing the neighborhood community together implies grouping residents together according to common interests and activities, which many times is resolved by confining them to an interior space converting the neighborhood centers in fairly hermetic spaces lacking natural light.

To reconcile both conditions –closing to protect and lighting to bring together– we opted to work with a continuous perimeter of perforated concrete blocks (ladricretos) because they provide protection, resistance, and create a solar control membrane around the entire north perimeter that filters the light and allows for adequate cross ventilation in each one of the rooms. ARQ

Psje

. Ju

an F

erna

ndez

Psje

. Ra

panu

i

N

S

S

1313 13

14

50,50

51,5051,50

47,50

51,50

12

46

45 4443

48

46454443

45.5

44.543.5

42.5

47.5

46.5

45.544.543.5

N

47

48.5

50.46

4

5

6

9

10

1146,45

47,50

47,50

A

A

B

B

C

C

D

D

E

E

37

3 38

33

7

43,044,045,0

42,0

51,550,5

46,447,5

43,0

47,5

51,5

52,0

43,044,045,046,0

51,5

47,5

44,5

47,5

51,5

46,4

51,5

47,5

44,5

O B R A S Y PROY EC TOS 105 WO RK S AND PROJEC T S

Planta nivel +46,25 y -47,50 m / Floor plan level +46,25 and -47,50 m E. / S. 1: 500

Planta nivel +51,50 y -50,50 m / Floor plan level +51,50 and -50,50 m E. / S. 1: 500

Corte AA / Section AA E. / S. 1: 500

Corte BB / Section BB E. / S. 1: 500

Corte CC / Section CC E. / S. 1: 500

Corte DD / Section DD E. / S. 1: 500

Corte EE / Section EE E. / S. 1: 500

leyenda / Legend1. Espacio multiuso / Mutipurpose space2. Cocina / Kitchen3. Bodega / Cellar4. Sendero / Trail5. Acceso / Access6. Sala sede cultural infantil + Sala de reunión /

Children's cultural center + Meeting room7. Oficina + sala de reunión / Office + meeting room8. Baño minusválidos / Disabled persons bathroom9. Sala de trabajo administración /

Administration work room10. Balcón / Balcony11. Sala multiuso / Multipurpose room12. Baños / Bathrooms13. Terraza / Roof terrace14. Plaza / Square