Haley & Aldrich, Inc.1 Preliminary Draft
Community Advisory BoardWest Van Buren WQARF SiteWVB Working Group - Draft Final Feasibility Study Work Plan
April 15, 2013
Haley & Aldrich, Inc.
Haley & Aldrich, Inc.2
TOPICS
1.West Van Buren Working Group
2.Feasibility Study Objectives
3.Feasibility Study Process
4.WQARF Procedure
5.Draft Final Feasibility Study Work Plan Status
6.Public Notice
Haley & Aldrich, Inc.3
Air Liquide Specialty Gases, LP;
Arizona Public Service Company;
City of Phoenix;
Dolphin, Inc.;
Freescale Semiconductor, Inc.;
Penn Racquet Sports;
Holsum Bakery, Inc.;
Honeywell International, Inc.;
WEST VAN BUREN WORKING GROUP
ITT Corporation;
Laundry and Cleaners Supply, Inc.;
Maricopa Land and Cattle Company;
Milum Textile Services Co.;
Prudential Overall Supply, Inc.;
Salt River Project Agricultural Improvement and Power District;
Shuff Steel Company;
Univar USA Inc.
Unincorporated association of parties that are key regional stakeholders;
Haley & Aldrich, Inc.4
FS OBJECTIVESIdentify a Reference Remedy, and a Less Aggressive and More Aggressive Remedy that:
• Appear to be capable of achieving the Remedial Objectives;
• Comply with Arizona Revised Statutes § 49-282.06, Remedial Action Criteria; and
• Comply with Arizona Administrative Code, Title 18 - Environmental Quality, Chapter 16 – Department of Environmental Quality Water Quality Assurance Revolving Fund Program, Article 4 – Remedy Selection.
Haley & Aldrich, Inc.5
Proposed Remedy
No ActionMonitoring
Source ControlControlled Migration
ContainmentPlume Remediation
Remedial MeasuresWell Replacement Replace Water Supply
Well Modification Engineering Controls
Water Treatment Other[R18-16-407(F)]
[R18-16-407(G)]
Remedial Strategies
Potential Alternatives
[R18-16-407(E)(3)]
[R18-16-407(H)(1-2)]
Less Aggressive Reference More
Aggressive
ComparisonCriteria [R18-16-407 (H)(3)]
Criteria[R18-16-407(H)(1-3)]
1 Achieve ROs2 Consistency with
Water Management Plans of Providers
3 Practicability4 Risk5 Cost6 Benefit / Value
FS PROCESS
Haley & Aldrich, Inc.6
WQARF PROCEDUREFS Working Agreement with
ADEQ – 01/15/13
Draft Final FS Work Plan – 03/01/13
Public Comment Period(30 Days – Started 04/05/13)
Proposed Remedial Action Plan (typically developed by ADEQ)
Public Comment Period
Responsiveness Summary and Record of Decision
(ADEQ)Final FS Work Plan Approval
Feasibility Study
Haley & Aldrich, Inc.7
• Draft FS Work Plan – submitted to ADEQ in September 2011;
• FS Working Agreement with ADEQ – January 15, 2013;
• ADEQ Comments Received – February 1, 2013;
• Draft Final FS Work Plan – submitted to ADEQ on March 1, 2013;
• FS Work Plan 30-Day Public Comment Period – April 5 to May 6, 2013.
DRAFT FINAL FS WORK PLAN STATUS
Haley & Aldrich, Inc.8
Provides information on how to:
• Obtain a copy of the Draft Final FS Work Plan;
• Provide comments to ADEQ.
PUBLIC NOTICE – DATED APRIL 5, 2013
Haley & Aldrich, Inc.9
DRAFT FS REPORT STATUS
Questions?