Common Application Form Ia

download Common Application Form Ia

of 3

Transcript of Common Application Form Ia

  • 8/18/2019 Common Application Form Ia

    1/3

    COMMON APPLICATION FORM IPART A

    FOR ESTABLISHMENT

      This format is to be filed with the Nodal Agency for the purpose of arranging site clearance, statutory approvals fromGram Panchayat, Municipality, TC & P, Urban Development Authority, Factories, Alienation of land / Acquisition of land,Power feasibility and Power connection from DISCOM, sanction of water supply from local bodies / HMWS & SB / Groundwater for setting up of industrial units in A.P.

      (Please submit required number of copies as per check slip including one for your record)

    NAME & ADDRESS OF THE PROMOTER/INDUSTRIAL UNDERTAKING IN FULL1.1

    Name of the Industrial Undertaking bondus engineering enterprise

    Name of the Promoter/M.D./Mg. Partner withsurname first

    bondu sudha rani

    S/o./D/o./W/o. naveen kumar

    Age 43

    Occupation buissiness

    UID (Aadhar ID) 592508808097

    ADDRESS FOR COMMUNICATION1.2

    Door No. pno-308

    Street Name devudu cheruvu

    Village/Town ongole

    Mandal ongole

    District prakasam

    Pin Code 523001

    E-mail [email protected]

    Fax

    Telephone (incl. STD code) 9611442479

    2 Nature of Organisation : Proprietary

    3 For Proprietary Units Only. Do you belong to : SC

    Line of manufacture4.1

    S.No Item Description Annual Installed Capacity

    Units Quantity

    1 motor vehicle spares nos 2000

    2 engg goods nos 2000

    Applicatin ID: CAE1501897

    GOVERNMENT OF NDHR PR DESH

    DEP RTMENT OF INDUSTRIES

  • 8/18/2019 Common Application Form Ia

    2/3

  • 8/18/2019 Common Application Form Ia

    3/3

    Date:07/04/2016

    Signature of Promoter or authorised person only in Ink

    NAME (IN BLOCK LETTERS)

    (DESIGNATION)

    Power required for the unit9.0

    Contracted Load is 11KV or 33KV (53)

    Contracted Load Maximum Demand in HP 74

    Aggregate installed capacity of the transformer to be installed bythe entrepreneur in case of H.T. (H.T. means above 150 H.P.)

    74

    Proposed maximum working hours 20 Per day

    600 Per month

    Expected month and year of trial production 12 - 2015

    Probable date of requirement of power supply. 05/11/2015

    Total HP of the machinery proposed to be installed 74

    Is Power Installation above 650V No

    Water Supply and Sewer connection10

    Water Supply from APIIC

    Water requirement

      i) Drinking Water 500 KL/Day

      ii) Water for Processing (Industrial Use) 200 KL/Day

    Size of Water Supply connection applied for 25mm(1”)

    Size of sewer connection applied for 25mm(1”)

    Area for Survey 0.50 Acres

    Permission to draw water11

    Agency Ground Water

    Requirement of Water Quantity 3000KL/Day

      I declare that the particulars given above are true to the best of my knowledge and belief. I shallobey the rules and regulations in force. If any deviation is found, suitable action may be initiated.