Commitment 2045 Metropolitan Transportation Plan (MTP) Climate Change Task Force – February 27, 2020

Embed Size (px)

Transcript of Commitment 2045 Metropolitan Transportation Plan (MTP)...Transportation Planning - Overview The...

  • Commitment 2045 Metropolitan Transportation Plan (MTP)Climate Change Task Force – February 27, 2020

  • Role of the MPO

    • Assign federal and state transportation funding

    • Regional coordinating entity for transportation

    • Work with partners to set regional vision for transportation

    • Work with partners to implement projects

  • BrowardMPO.org

    • South Florida Climate Change Vulnerability and Adaptation Pilot Project (2015)

    • Extreme Weather and Climate Change Risk to the Transportation System in Broward County, Florida (2016)

    • All Hazards Recovery Training• Ongoing Coordination with

    Department of Homeland Security

    MPO Foundational Resiliency Work

  • Transportation Planning - OverviewThe Broward MPO’s Metropolitan Transportation Plan is a federally required 25-year long-range planning document and is updated every 5

    years to help guide federal/state transportation investments.

  • BrowardMPO.org

    2045 MTP Goals and Objectives

  • BrowardMPO.org

    Transportation needs are identified using partner input and latest available data

    Transportation Needs Assessment

    Data• Demographics• Future Transportation Demand• Land Use• Resiliency• Future Technology

    Partners• Florida Department of

    Transportation (FDOT)• Broward County• Municipalities• SFRTA (Tri-Rail)• Port/Airport• Public

  • BrowardMPO.org

    Broward MPO MTP New Funding Availability (2045)

    State/Federal Roadway Funding (78%)

    Transit Operating/Capital (15%)

    MPO Attributable Funds (7%)

    $564million

    Total Revenues = $8.3 billion

    $1.3billion

    $6.5billion

  • BrowardMPO.org

    44 Roadway Projects

    5 Transit Projects

    Establishes TSM&O Safety Program ($400M)

    Continues Bicycle/Pedestrian Investment ($500M)

    Cost Feasible Plan Overview

  • BrowardMPO.org

    •Goals and Objectives•Project Prioritization•Cost Feasible Plan•Resiliency Technical Report

    Resiliency in the MTP

    EnvironmentSea Level Rise Mitigation |

    GHG and Precursor Emissions |Wetland/Natural Habitats

  • BrowardMPO.org

    • Identified eight (8) resiliency studies on highly vulnerable corridors from the South Florida South Florida Climate Change and Vulnerability Adaptation Project

    • Programmed in the 2026-2030 funding timeframe

    Identified Resiliency Corridors

  • BrowardMPO.org

    • Work with FDOT to program identified resiliency studies

    • Involve stakeholders in the assessment and development of alternatives

    • Continue evaluating resiliency considerations as part of all MTP projects

    • Resiliency in Vision 2100

    Next Steps

  • Questions?Greg Stuart

    Executive Director (954) 876-0033

    [email protected]

    Peter GiesSystems Planning Manager

    (954) [email protected]

    mailto:[email protected]:[email protected]

    Commitment 2045 Metropolitan Transportation Plan (MTP)� �Climate Change Task Force – February 27, 2020Slide Number 2Role of the MPOSlide Number 4Transportation Planning - OverviewSlide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Questions?