Commissioning of Subsea Hydraulic Systems...• Pre-Commissioning - Checks on all components off...
Transcript of Commissioning of Subsea Hydraulic Systems...• Pre-Commissioning - Checks on all components off...
![Page 1: Commissioning of Subsea Hydraulic Systems...• Pre-Commissioning - Checks on all components off line • Commissioning Procedures - Detailed procedures and check lists should be developed](https://reader030.fdocuments.us/reader030/viewer/2022040915/5e8e2a5424c13b1eb7108406/html5/thumbnails/1.jpg)
SUBSEA CONTROL SYSTEMS
• Flushing - Hygeinic assembly practices -Flushingatasufficeintpressureandflowratetoensure turbulentflowisachieved• Testing -Confirmfluidcleanlinessviapatchtestkit -Removesensitiveequipmentpriortoflushing -Loophosestoreduceflushingtime -Usenon-bypassfilters
• FluidCompatability -Componentmaterial - Seal material -Operatingconditions• FluidContamination -Bacteriagrowth -Gasmigration/contamination(emulsification) -Moisturecontamination(humidity/emulsification)• FluidCleanlinessStandards - NAS1638 -SAEAS4059RevE -ISO(ISO4406-1999)
COMPONENT CONSIDERATIONS
• Pipework -Cleanlinessduringmanufactureiscritical• Hoses -Pighosesbeforeendfittingsareapplied -Installationiscritical(abrasion/kinking/environmental issues)• Accumulators -Storewithpartialfill -Chargegasslowly• Pumps&Motors -Pre-charge/bleedtoprovideadequatelubrication -Ensuremotorcaseisfull -Performrotationcheckswithnoload
• Cylinders -Ensuresystemisfullybled• Regulators -Screwdowntonearmaximumpressure -Primeatalowpressure -Cycletocheckrepeatability• PressureReliefValves -Removefromsystemsduringflushingandtesting -Setandcertifyoff-line
www.pressuredynamics.com
START-UP RISK REDUCTION
• Initialbuildcleanliness• FactoryAcceptanceTesting(FAT) -Individualcomponentistested• SystemIntegrityTesting(SIT) -Fullstackuptesting• Pre-Commissioning -Checksonallcomponentsoffline
• CommissioningProcedures -Detailedproceduresandchecklistsshouldbe developedinconsultationwtihtheOEM’sfor eachsystemandsubsystem. -Stagedcommissioning - Baseline HPU systems• PostStart-up -OngoingMonitoring
Fluid Cleanliness is the key to success
Commissioning of Subsea Hydraulic Systems
Poorpreparationandprocessesatstart-up/commissioningcanresultindamagetohydrauliccomponents.Thisdamagecanbecatastrophicatstart-up,ormaynotbecomeapparentuntilmanyyearslater.Damagecanbepreventedby: