Commissioning:
A University Perspective
May 3, 2006
Rebuild Michigan WorkshopAdvanced Energy Technologies for
Commercial Buildings
![Page 2: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/2.jpg)
Terry Pahl, P.E., LEED, Facilities Engineer
Grand Valley State UniversityEnergy Department
Energy
EstimatesUtilities
CxP Project Management
Technical Assistance
EMS
Budgets
EquipmentLEED/Energy Star
![Page 3: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/3.jpg)
Commissioning
Commissioning - Defined What Commissioning Does Not Solve Reasons for Commissioning The Commissioning Process Commissioning Findings Recommendations
![Page 4: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/4.jpg)
Commissioning - Defined
Verify and ensure that fundamental building elements and systems are designed, installed and calibrated to operate as intended.
![Page 5: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/5.jpg)
AHU System
![Page 6: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/6.jpg)
Testing Controls
![Page 7: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/7.jpg)
What Commissioning Does Not Solve
Does not correct an improper design of the building or systems within the building.
![Page 8: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/8.jpg)
Steel Beam Penetrations
![Page 9: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/9.jpg)
What Commissioning Does Not Solve
Does not correct an improper design of the building or systems within the building.
Does not correct a poorly constructed building or poor installation of the building systems.
![Page 10: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/10.jpg)
Poor Conduit Connection
![Page 11: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/11.jpg)
Reasons for Commissioning
Design and construction errors are identified early.
Building system errors are identified early. Energy savings. Operational savings. Satisfied clients
![Page 12: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/12.jpg)
The Commissioning Process - Past
Historically In-house staffCursory inspectionsPunch list
![Page 13: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/13.jpg)
Gold Certified – LEED Building
Michigan Alternative Renewable Energy Center
![Page 14: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/14.jpg)
Silver Certified – LEED Building
Lake Ontario Hall
![Page 15: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/15.jpg)
The Commissioning Process - Present
Current Engage a commissioning authority. Develop design intent and basis of design documentation. Include commissioning requirements in the construction
documents. Develop and utilize a commissioning plan. Verify installation, functional, performance, training and
documentation. Complete a commissioning report.
Current - additional Review the design prior to the CDs. Review the CDs prior to completion. Review selected commissioned equipment submittals. Develop a system and energy management manual. Contract for near-warranty or post-occupancy review.
![Page 16: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/16.jpg)
Commissioning Findings . . .
![Page 17: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/17.jpg)
Duct Connection
![Page 18: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/18.jpg)
Duct Connection
![Page 19: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/19.jpg)
Duct Connection
![Page 20: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/20.jpg)
Flexible Connection
![Page 21: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/21.jpg)
Proper Duct Seal During Construction
![Page 22: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/22.jpg)
Missing Insulation
![Page 23: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/23.jpg)
Leaks
![Page 24: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/24.jpg)
Improper Return Duct Seal During Construction
![Page 25: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/25.jpg)
Proper Return Duct Seal During Construction
![Page 26: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/26.jpg)
Proper Duct Seal During Construction
![Page 27: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/27.jpg)
Design Issue
![Page 28: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/28.jpg)
Construction Issue
![Page 29: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/29.jpg)
Design Issue
![Page 30: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/30.jpg)
Construction Issue
![Page 31: Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e435503460f94b375bf/html5/thumbnails/31.jpg)
Recommendations
Choose your design firms and contractors based on their commitment to detail and solving problems.
Always commission. In-house Outsource
Strengthen specifications to include commissioning tasks.
Add the commission costs as part of the budget process.