Commercial Range User Requirements Process
description
Transcript of Commercial Range User Requirements Process
Commercial Range User Requirements
Process
Mr. Kelvin ColemanLt. Col. Tim Brown
October 26, 2005
2
Overview
• Background/History• Past Results• Responsive Space Era• Industry Involvement
3
History
• IWG Report (Feb. 2000) on the Future Use and Management of the U.S. Space Launch Bases and Ranges • Finding: Commercial sector range users have a limited voice in
determining requirements, plans, investments, etc. associated with maintaining, improving, and modernizing the ranges
• Finding: Federal government has no formal process for gathering, validating , or advocating commercial sector requirements
• IWG recommended alternative management structures be stood up to allow and provide greater user voice for range improvements and modernization.• Desired outcome: On-going process for communicating and considering
commercial range user requirements
• AF/DOT/DOC MOA (February 2002)• We’ve had two calls for requirements/recommendations
• 2001 call yielded 7 requirements• 2003 call yielded 0 requirements
4
Need for Process
• MOA states “The process is defined as a formal, repeatable process for collecting commercial sector range support and modernization requirements, communicating these requirements to the AF, and considering these requirements in the existing AF requirements process.”• Prior to the MOA there was no formal way to communicate mid
and long term requirements for range support and modernization
• The Universal Documentation System is an effective way to communicate near-term requirements/needs
5
Question:
Is there a need to continue the process in 2006 and beyond?
6
Commercial Requirements Timeline
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
DoTProcess Requirements
DoT Solicit Industry
CYXX
Provide input to DoD
DoD DetermineOverlap &
Provide Feedback
Determine Implementation& Cost Projects
DoD
Unfunded/new capabilities meeting AF needs; initiate requirements
process, if required
Projects within requirements baseline/Commercially funded projects
FY - I&M Initiation
POM Inputs to HAF
Appeals andARTWG
DoD Provide Project Status
RVB Process
7
Commercial Requirements Process:1st Cycle Results
• Demonstrate and certify GPS Metric Tracking capabilities • Status: In-work
• Demonstrate and certify space-based telecommunications capabilities, demonstrate and certify autonomous flight safety systems
• Status: Responsive Launch & Test Range (RLTR) era• Additional downrange radar capability (for demonstration flights)
• Status: AFSPC prepared to mitigate when need arises• Command destruct receiver freq change/technology upgrade – USAF should fund the
development, integration, and qualification of a destruct system • Status: EELV conversion planned
• Provide an integrated Air Force range vision and strategy • Status: Evolution toward RLTR Concept - Continue DoD corporate process
• Ensure consideration of RLV capabilities and concepts in range safety rules • Status: Interagency Common Standards Rule-making. Risk criteria remains
unchanged, but increased reliability expected to enhance flexibility• Provide long term access to space launch property
• Status: AF’s ‘02 legislative proposal was killed in H&S conference w/o explanation
Lessons Learned: Greater opportunities to incorporate commercial needs as part of next-generation range acquisition
8
Preparing for Responsive Space Era - Responsive Launch & Test Range
(RLTR)
ResponsiveSpace
Payl
oad V
ehicle
Range
3 DoD components:
Responsive Launch & Test Range (RLTR) is the planned next-generation range to support responsive space requirements
• Force application from space• Counterspace missions• Tactical force enhancement
9
Range Mission
• Responsibilities• C2 of in-flight launch vehicles (positive control)• Protect the public per public law • Collect vehicle performance data
• Functions performed• Flight safety analysis and operations• Telemetry collection and dissemination• Vehicle tracking, commanding, and imagery• Weather observation, modeling, and forecasting• Communications backbone• Hazard corridor surveillance/clearing• Planning and scheduling
Applicable now and in the future
10
Notional DoD RLTR Capabilities
Current RangeInitial Responsive
Range (2010)Final Responsive
Range (2018)
Communications Connectivity
Commanding, telemetry, and tracking
Regional End of public
safety risk
ExtendedExisting SATCOM
Globally Transformational
Comm - enables positive weapons control
Flight Plan ApprovalDebris / toxic hazards
risk assessmentsAir space clearanceOn-orbit collision
avoidanceClearance into theater
for weapons release
1-2 Months
Prepare contingency plans to meet timelines
Select set of scenarios
Within hours
Capacity/Sortie rate2 per range
per weekLimited surge
Pre-planned missions
5-16 sorties per day
Wartime scenario
11
Invitation to Industry
• In concert with the Memorandum of Agreement (MOA) on Spacelift Range Commercial Requirements Process, AFSPC/DRFG invites industry to participate in establishing next-generation Launch and Test Range (LTR) performance requirements
• Iterative process with increased definition developed at appropriate acquisition milestones
• Characteristics and attributes needed prior to Analysis of Alternatives (AoA)
• Functional area (comm, weather, tracking, etc.) parameters needed for Concept Development Document (CDD)
• Identifying architecture solutions and innovative approaches to satisfying deficiencies comes later
MOA provides framework for involvingall stakeholders in vetting “national” set of requirements
12
Notional DoD Acquisition Timeline
20162005 20092008 2010 2014
IOC
Technology Development
System Development& Demonstration
Production& Deployment
Operations & Support
FOC
LRIP
A B C
Concept Refinement
MS MS MS
FRP
CDD CPD
RSR
AoA Modifications
ICD Stage II
JROC
AFROCCRSR JROC
AFROCCRSR JROC
AoA Plan
AFROCC
Now
2018 2022
13
BACKUPS
14
Stakeholders
• USSTRATCOM – warfighter advocate
• AFSPC
• National security (DoD, NRO, other)
• T&E community
• Ballistic missiles (ICBMs, SLBMs, MDA)
• Guided weapons
• Aeronautical programs
• NASA, FAA, and commercial industry (launch providers, spaceports)
The ranges are a national asset, of which the Air Force is the steward
RLTR Force Application ScenarioForce Application from Space Scenario for 2018
Current launch ranges will be absorbed into RLTR in support of responsive launch, routine launch, and T&E missions
FAAWestern Region
Global Positioning System (GPS)
Transformational Comm (TC)
Ÿ Ÿ Ÿ ŸŸ Ÿ HDBT
CAOCMCC
CMOC
Eastern Region