OVERVIEW
1. Inside Lighting: Luminaries Lay-out
2. Inside Lighting Calculation-Visual
3. Inside lighting Circuiting and control
4. Lighting panel and control panel schedule
5. Luminaries Schedule
6. Inside Lighting Cut sheets
![Page 3: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/3.jpg)
Building lighting lay-outBuilding lighting lay-out
![Page 4: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/4.jpg)
Lighting StatisticsLighting Statisticsand Specificationsand Specifications
Room # Ave Max Min Max/Min Spec. Type
100 Vest. 20.7 24 17.1 1.4:1 20 Recessed cf down lights
101 Rec. 21.4 28.8 12.5 2.3:1 20 Recessed cf down lights
103/104 rec/file 52.8 69.7 29.8 2.3:1 50 Recessed lensed fluorescent
106 Copy 53.2 71.7 33.6 2.1:1 50 Recessed lensed fluorescent
110 Library 61.8 90.7 35.8 2.5:1 60 Recessed parabolic fluorescent
126 open office 43.3 61 19.8 3.1:1 40 Direct indirect fluorescent
126 open office 43.4 69.7 16.7 4.2:1 40 Recessed 2 x4 parabolic
123 Conference 47.8 74.5 26.4 2.8:1 50Dir / Indir, + w/w,+ inc dn
![Page 5: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/5.jpg)
Top View of the Center IslandTop View of the Center IslandOpen Office Area W/ Linear Open Office Area W/ Linear
DesignDesign
![Page 6: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/6.jpg)
Top View of the Center IslandTop View of the Center IslandOpen Office Area W/ Linear Open Office Area W/ Linear
DesignDesign
![Page 7: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/7.jpg)
Top View of the Center Top View of the Center IslandIsland
Open Office Area, Non-Open Office Area, Non-Linear DesignLinear Design
![Page 8: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/8.jpg)
Top View of the Center Top View of the Center IslandIsland
Open Office Area, Alternate Open Office Area, Alternate DesignDesign
![Page 9: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/9.jpg)
Elevation viewElevation viewZonal CalculationsZonal Calculations
Calculation Points (2.5’ AFF)
Luminaire Mounting Height (8.5’ AFF)
Floor CavityRoom Cavity
Ceiling Cavity
= Room Cavity Ratio
RCR= 5 × height of the cavity × (L + W) ÷ Area
Coefficient of Utilization(from the manufacturers photometric data charts)
![Page 10: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/10.jpg)
How Many LuminariesHow Many LuminariesDo We Need in This AreaDo We Need in This Area
Quantity of Fixtures =
Foot Candle (required) × Square Feet of Area
÷
Lumens per Lamp × Lamps per Fixture ×CU × LLF
![Page 11: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/11.jpg)
Enter solids, Calculations Enter solids, Calculations ZonesZones
And Luminaries (with IES files)And Luminaries (with IES files)
![Page 12: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/12.jpg)
Circuiting and ControlCircuiting and Control
Low Voltage Control Switches
Emergency and Exit sign lighting
Night Lights
![Page 13: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/13.jpg)
Lighting Control PanelLighting Control Panel
![Page 14: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/14.jpg)
Lighting Control Panel Lighting Control Panel ScheduleSchedule
![Page 15: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/15.jpg)
Lighting Panel ScheduleLighting Panel Schedule
![Page 16: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/16.jpg)
Luminaries ScheduleLuminaries Schedule
![Page 17: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/17.jpg)
Cut SheetsCut Sheets
![Page 18: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/18.jpg)
Photometric Data Cut Photometric Data Cut SheetsSheets
![Page 19: Commercial Project](https://reader036.fdocuments.us/reader036/viewer/2022081414/54bbe3a84a79597d4d8b4588/html5/thumbnails/19.jpg)
Thank You