Copyright 2002 by Ernest R. Cadotte Quarter 4 The Skillful Adjustment.
Commercial Forecast Adjustment Draft June 19, 2002.
-
Upload
debra-arnold -
Category
Documents
-
view
214 -
download
0
Transcript of Commercial Forecast Adjustment Draft June 19, 2002.
Commercial Forecast Adjustment
Draft June 19, 2002
Recent GrowthCommercial Sector Historical Growth
Weather Adjusted
-150
-50
50
150
250
350
1982 1984 1986 1988 1990 1992 1994 1996 1998
Year
MW
a p
er y
ear
Morelan’s Draft ForecastCommercial Sector Forecast Growth
0
50
100
150
200
250
2005 2007 2009 2011 2013 2015 2017 2019 2021 2023 2025
Year
MW
a p
er Y
ear
Historic MetricCommercial Employment and Electricty Use
0
1000
2000
3000
4000
5000
6000
1991 1992 1993 1994 1995 1996 1997 1998 1999
Year
MW
a &
1000
Em
p
1.14
1.16
1.18
1.2
1.22
1.24
1.26
1.28
1.3
MW
a/10
00 E
mp
ThousandEmp
MWaWeatherAdjusted
MWa per1000 Emp
Planned Modifications
• Washington code upgrade
• Seattle code upgrade
• Idaho code upgrade
• Federal ballast standard
• Federal updates if adopted
• New Federal, if adopted
Item Description Impact
Washington Code
Two upgrades have occurred one effective July 2001 and an out-of-sequence change effective July of 2002. Changes in place as of July of 2001 include some commissioning requirements, equipment efficiencies, lighting controls for smaller buildings and exhaust hood efficiencies. Effective July 2002 Washington adopted ASHRAE 90.1, 1999 that includes upgraded equipment efficiencies, economizers on data centers and adiabatic humidification.
Largest changes are likely from equipment efficiencies, commissioning and economizers. On the order of 3% reduction overall in new buildings.
Item Description Impact
City of Seattle Seattle code to go beyond statewide code beginning July 2002. Changes include LPD to 1.0 wsf for offices, daylight controls, electronically commutated motors, and better windows.
About 20 percent better than ASHRAE 1999. About 10 percent beyond current practice.
Item Description Impact
State of Idaho Jurisdictions that have and enforce a building code. (All but two small counties.)
New code effective January 2003. Adopted IECC but has not adopted the 2001 ASHRAE supplement for chapter 7. So Idaho is using the ASHREA 90.1-1993 for chapter 7. Prototype analysis from Ken Baker and Mike Kennedy.
LPDs in retail drop lighting EUI. Equipment efficiencies improve, glazing and insulation improve UA. Significant EUI electric & base EUI changes in kWh/sf-yr LR lighting (-0.4), 5.8SR lighting (-.32), 5.0 LO heating (-.47), 4.9All types auxiliary (-.17), LO,SR cooling (-.16), 0.8
Item Description Impact
State of Oregon
Last code change in 1998 including update to ASHRAE standards for equipment plus tweeks to the major 1995 changes. Pending proposals are being reviewed for effect October 2003. There are 47 commercial code change proposals including building commissioning, demand control ventilation and others. Too early to estimate likelihood of change.
Negligible.
Item Description Impact
Federal Ballast Standard
Tier 1 applies to ballasts in new fixtures. Effective in ballasts sold after June 1, 2005 or incorporated into fixtures after January 1, 2006. Eliminates magnetic ballasts. Impacts natural replacement cycle in retrofit by about 10%. Does not impact new and remodel and renovation. Tier 2 requires electronic ballasts in ballast replacement markets. Effective for ballasts manufactured after June 30, 2010.
USDOE estimates average 36 kWh/year per ballast adjusted for current market share already occupied by electronic ballasts. 30 million ballasts annually in new fixtures in US. About 6 million ballasts in the ballast-only replacement market.
Potential Federal Updates
• Packaged AC & HP
• R/BR Reflector lamps
ACEEE Proposed New
• Transformers
• Vending machines
• Refrigerators, Freezers, Ice makers
• Traffic Signals
• Exit signs
• Washers
• Large packaged AC equipment