COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for...
Transcript of COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for...
![Page 1: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/1.jpg)
C COMMENTS
RECEIVED
![Page 2: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/2.jpg)
1
Garland, Jade
Subject: FW: Notice GWP 4048-11-00
From: Sent: August-10-17 1:42 PM To: [email protected]; Lindensmith, Dave (MTO) Cc: Ian Grabina; ; ; David Chernushenko; Nadeau, Alain (MTO); Yasir Naqvi MPP (Constituency Office) Subject: Notice GWP 4048-11-00
Good afternoon Ms. Lapointe
We read with great interest your notice of a study for the 417/Nicholas underpass, as
found in today's Ottawa Citizen. You may know that Mr. Lindensmith recently put up
such a similar notice for bridge replacement projects for the 417 where it crosses the
Rideau Canal and for adjacent road-crossing overpasses on either side of this Nicholas
underpass and we wondered if this series of projects could be bundled together for both
review and for planning and scheduling purposes. This area of the City of Ottawa has
been under construction for it seems forever including the LRT work that is still
underway, and our local access to the 417 eastbound is still blocked; so, it would be
very much appreciated if all of these newly-proposed projects were managed in an
orderly and expeditious manner.
You may also know that the reconstruction of Main Street has been completed south of
the Queensway but work to the north and then along Greenfield Avenue are still
pending. Construction vehicles for the LRT and Main Street projects, as well as from
major new housing developments on the former Oblate properties, have really pounded
Greenfield - so planning for the bridge and underpass work, we would hope, would take
into consideration construction access routes that may need to use our neighbourhood
streets. The use of local streets for laydown areas and for parking construction
equipment and workers' vehicles has also caused significant concern in our area and so
planning for these areas during an extended period of construction we would trust will
also be factored into your planning processes.
Thank you for the opportunity to provide input.
Cheers
Virus-free. www.avast.com
Comment 1
![Page 3: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/3.jpg)
1
Garland, Jade
From: MacMillan, Meghan
Sent: Friday, August 18, 2017 1:31 PM
To: Garland, Jade
Subject: FW: Notice GWP 4048-11-00
Meghan MacMillan, MCIP, RPP T+ 1 613-690-1117 M+ 1 613-862-0773
From:
Sent: Friday, August 18, 2017 1:26 PM
To: Lapointe, Carmen <[email protected]>
Cc: Ian Grabina <[email protected]>; ;
; David Chernushenko <[email protected]>; Nadeau Alain (MTO)
<[email protected]>; Yasir Naqvi MPP (Constituency Office) <[email protected]>; Lindensmith Dave
(MTO) <[email protected]>; Kevin Ogilvie <[email protected]>; MacMillan, Meghan
Subject: Re: Notice GWP 4048-11-00
Good afternoon Ms. Lapointe
Thank you for the explanatory letter. It appears that your project has a shorter timeline
than those for Mr. Lindensmith's canal bridge and associated overpasses, if 2018 is your
target date for construction. Would you have any idea when the eastbound ramp from
Lees Avenue onto the Queensway might be reopened?
Cheers
From: "Lapointe, Carmen" <[email protected]> To: Cc: Ian Grabina <[email protected]>; ;
; David Chernushenko <[email protected]>; Nadeau Alain (MTO) <[email protected]>; Yasir Naqvi MPP (Constituency Office) <[email protected]>; Lindensmith Dave (MTO) <[email protected]>; Kevin Ogilvie <[email protected]>; "MacMillan, Meghan" <[email protected]> Sent: Thursday, August 17, 2017 1:26 PM Subject: RE: Notice GWP 4048-11-00
Comment 1a
![Page 4: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/4.jpg)
2
Please see the attached letter in response to your e-mail dated August 10, 2017. Kindest regards, Carmen Lapointe, P.Eng. Project Manager Transportation - Highways Department
WSP Canada 1145 Hunt Club Road, Suite 200 Ottawa, Ontario K1V 0Y3 Canada T +1 613-690-1092 (Direct Line) F +1 613-736-8710 [email protected] www.wsp-pb.com This communication is intended for the sole use of the person(s) to whom it is addressed, and may contain information that is privileged, confidential or subject to copyright. Any unauthorized use, disclosure or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender immediately. Any communication received in error should be deleted and all copies destroyed. � Please consider the environment before printing this e-mail and/or its attachments.
From: Sent: August 10, 2017 1:42 PM To: Lapointe, Carmen; Lindensmith Dave (MTO) Cc: Ian Grabina; ; ; David Chernushenko; Nadeau Alain (MTO); Yasir Naqvi MPP (Constituency Office) Subject: Notice GWP 4048-11-00 Good afternoon Ms. Lapointe We read with great interest your notice of a study for the 417/Nicholas underpass, as found in today's Ottawa Citizen. You may know that Mr. Lindensmith recently put up such a similar notice for bridge replacement projects for the 417 where it crosses the Rideau Canal and for adjacent road-crossing overpasses on either side of this Nicholas underpass and we wondered if this series of projects could be bundled together for both review and for planning and scheduling purposes. This area of the City of Ottawa has been under construction for it seems forever including the LRT work that is still underway, and our local access to the 417 eastbound is still blocked; so, it would be very much appreciated if all of these newly-proposed projects were managed in an orderly and expeditious manner. You may also know that the reconstruction of Main Street has been completed south of the Queensway but work to the north and then along Greenfield Avenue are still pending. Construction vehicles for the LRT and Main Street projects, as well as from major new housing developments on the former Oblate properties, have really pounded Greenfield - so planning for the bridge and underpass work, we would hope, would take into consideration construction access routes that may need to use our neighbourhood streets. The use of local streets for laydown areas and for parking
![Page 5: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/5.jpg)
3
construction equipment and workers' vehicles has also caused significant concern in our area and so planning for these areas during an extended period of construction we would trust will also be factored into your planning processes. Thank you for the opportunity to provide input. Cheers
Virus-free. www.avast.com
You are receiving this communication because you are listed as a current WSP contact. Should you have any questions regarding WSP’s electronic communications policy, please consult our Anti-Spam Commitment www.wsp.com/casl. For any concern or if you believe you should not be receiving this message, please forward this message to [email protected] so that we can promptly address your request. This message is intended only for the addressee and may contain information which is privileged, confidential, proprietary, or exempt from disclosure under applicable law. If you are not the intended recipient, you are strictly prohibited from disclosing, distributing, copying, or in any way using this message. If you have received this communication in error, please notify the sender and delete any copies you may have received. ---------------------------------------------------------------------------------------------------------------------------------------- Vous recevez cette communication car vous faites partie des contacts de WSP. Si vous avez des questions concernant la politique de communications électroniques de WSP, veuillez consulter notre Engagement anti-pourriel www.wsp.com/lcap. Pour toute question ou si vous croyez que vous ne devriez pas recevoir ce message, prière de le transférer au [email protected] afin que nous puissions rapidement traiter votre demande. Ce message est destiné uniquement au destinataire et il peut contenir des informations privilégiées, confidentielles ou non divulgables en vertu de la loi. Si vous n’êtes pas le destinataire du présent message, il vous est strictement interdit de le divulguer, de le distribuer, de le copier ou de l’utiliser de quelque façon que ce soit. Si vous avez reçu la présente communication par erreur, veuillez en aviser l’expéditeur et supprimer le message.
______________________________________________________________________ NOTICE: This communication and any attachments ("this message") may contain confidential information for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on this message is strictly prohibited. If you have received this message in error, or you are not an authorized recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies.
![Page 6: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/6.jpg)
1
Garland, Jade
From: MacMillan, Meghan
Sent: Monday, August 14, 2017 1:48 PM
To: Garland, Jade
Subject: FW: NOC Hwy 417 Nicholas St Underpass Replacement (GWP 4048-11-00)
Attachments: 2017-08-11 Hwy 417 Nicholas St Underpass Comment Form.pdf
Meghan MacMillan, MCIP, RPP T+ 1 613-690-1117 M+ 1 613-862-0773
From: Dillon, Mary (MNRF) [mailto:[email protected]]
Sent: Monday, August 14, 2017 1:45 PM
To: Lapointe, Carmen <[email protected]>
Cc: MacMillan, Meghan <[email protected]>
Subject: NOC Hwy 417 Nicholas St Underpass Replacement (GWP 4048-11-00)
Hello Carmen Lapointe, We have received the Notice of Commencement for the Detail Design and EA Study for the replacement of the Highway 417 Nicholas Street Underpass (GWP 4048-11-00) in the City of Ottawa. The comment form is attached. Based on my review of our files, an info request response regarding known and potential natural heritage features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this is not the same project, or if you require anything further, please let me know. Thank you,
Mary Dillon
A/District Planner
Kemptville District
613-258-8470
Comment 2
![Page 7: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/7.jpg)
![Page 8: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/8.jpg)
1
Garland, Jade
From: Lapointe, Carmen
Sent: Tuesday, August 15, 2017 3:38 PM
To: MacMillan, Meghan; Garland, Jade
Subject: FW: Notice GWP 4048-11-00
For your files…
Carmen Lapointe, P.Eng. Project Manager Transportation - Highways Department
WSP Canada 1145 Hunt Club Road, Suite 200 Ottawa, Ontario K1V 0Y3 Canada T +1 613-690-1092 (Direct Line) F +1 613-736-8710 [email protected] www.wsp-pb.com This communication is intended for the sole use of the person(s) to whom it is addressed, and may contain information that is privileged, confidential or subject to copyright. Any unauthorized use, disclosure or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender immediately. Any communication received in error should be deleted and all copies destroyed.
� Please consider the environment before printing this e-mail and/or its attachments.
From: Lindensmith, Dave (MTO) [mailto:[email protected]]
Sent: August 15, 2017 3:05 PM
To:
Cc: Lapointe, Carmen; Ogilvie, Kevin (MTO)
Subject: RE: Notice GWP 4048-11-00
Hi
You will recall that the City’s EA for the AVTC showed a connection to the Nicholas St Bridge at its currently existing
location.
MTO is working toward replacement of the bridge just west of its current location. This allows the existing bridge to be
used to carry traffic during construction of the bridge replacement.
The future location of the Nicholas St bridge replacement neither requires nor precludes future construction of the
AVTC.
Regards,
Comment 3
![Page 9: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/9.jpg)
2
David Lindensmith, P. Eng.
Sr. Project Engineer
MTO Planning & Design Section
Eastern Region
From: Sent: August-10-17 3:21 PM To: Cc: Lindensmith, Dave (MTO); Ian Grabina; ; David Chernushenko; Nadeau, Alain (MTO) Subject: Re: Notice GWP 4048-11-00
David: do these projects have anything to do with re-alignment of Nicolas so the AVTC can be built? I sure
hope not.
cheers
On Thu, Aug 10, 2017 at 1:41 PM, wrote:
Good afternoon Ms. Lapointe
We read with great interest your notice of a study for the 417/Nicholas underpass, as
found in today's Ottawa Citizen. You may know that Mr. Lindensmith recently put up
such a similar notice for bridge replacement projects for the 417 where it crosses the
Rideau Canal and for adjacent road-crossing overpasses on either side of this Nicholas
underpass and we wondered if this series of projects could be bundled together for both
review and for planning and scheduling purposes. This area of the City of Ottawa has
been under construction for it seems forever including the LRT work that is still
underway, and our local access to the 417 eastbound is still blocked; so, it would be
very much appreciated if all of these newly-proposed projects were managed in an
orderly and expeditious manner.
You may also know that the reconstruction of Main Street has been completed south of
the Queensway but work to the north and then along Greenfield Avenue are still
pending. Construction vehicles for the LRT and Main Street projects, as well as from
major new housing developments on the former Oblate properties, have really pounded
Greenfield - so planning for the bridge and underpass work, we would hope, would take
into consideration construction access routes that may need to use our neighbourhood
streets. The use of local streets for laydown areas and for parking construction
equipment and workers' vehicles has also caused significant concern in our area and so
planning for these areas during an extended period of construction we would trust will
also be factored into your planning processes.
Thank you for the opportunity to provide input.
Cheers
![Page 10: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/10.jpg)
1
Garland, Jade
From: MacMillan, Meghan
Sent: Tuesday, August 15, 2017 3:39 PM
To: Garland, Jade
Subject: Fwd: uOttawa Re: Highway 417 Nicholas Street Underpass (Site #3-224)
Attachments: uO 417 Study reply form.pdf
---------- Forwarded message ----------
From: Claudio Brun Del Re <[email protected]>
Date: 15 Aug 2017 3:34 p.m.
Subject: uOttawa Re: Highway 417 Nicholas Street Underpass (Site #3-224)
To: "MacMillan, Meghan" <[email protected]>
Cc: [email protected],"Lapointe, Carmen" <[email protected]>,André Lambert
Hi all,
Please find attached our completed reply form asking to be informed and to participate on stakeholder consultations.
You’ll note that I am copying André Lambert, P. Eng, who is the Executive Director of Facilities since I have taken the new
role of Chief Architect - Campus Development.
For the purposes of your study, I shall be the lead contact for uO and ensure internal communications as required.
Best regards,
Claudio
Cel 613-799-2686
Claudio Brun del Re, OAA, OAQ, FRAIC, CEFP
Architecte en chef, développement du campus
Chief Architect, Campus development
Immeubles | Facilities
Université d'Ottawa | University of Ottawa
141 Louis Pasteur, Ottawa ON K1N 6N5
Tél. | Tel. : 613-562-5800, (3924)
Énergiseurs d’idées | We power ideas
Comment 4
![Page 11: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/11.jpg)
We have no specific questions at this time. uOttawa has land holdings on both sides of the 417 immediately East of the Nicholas Overpass. They are generally as follows: -ownership of 200 Lees -perpetual use and other interests on both sides of the Lees Station proper -ownership of the land formerly known as the Robinson snow dump -ownership and other interests to the South of Mann Ave -ownership of the Campus lands from Mann Ave northwards In addition, many students live in the vicinity of Lees Ave on both sides of the 417 where there are various challenges for pedestrians and cyclists. We are very interested in all changes affecting the configurations and mobility framework in your study area.
University of Ottawa—Facilities Service
Claudio Brun del Re, Chief Architect—Campus Development
613-562-5800 ext 3924 or Cell 613-799-2686
141 Louis-Pasteur Private, Ottawa, ON, K1N 6N5
X
X
![Page 12: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/12.jpg)
1
Garland, Jade
From: MacMillan, Meghan
Sent: Wednesday, August 16, 2017 8:25 AM
To: Garland, Jade
Subject: FW: GWP 4048-11-00
Attachments: 417 Nicholas Street Comment Form.pdf
Meghan MacMillan, MCIP, RPP
T+ 1 613-690-1117
M+ 1 613-862-0773
From: Acheson, Sophie [mailto:[email protected]]
Sent: Wednesday, August 16, 2017 8:20 AM
To: MacMillan, Meghan <[email protected]>
Subject: GWP 4048-11-00
Hi Meghan,
Please find enclosed our confirmation that we would like to participate in the MTAC for the Nicholas Street Underpass
Replacement.
Thank you!
Sophie Acheson
Principal Municipal Planner
Planificatrice municipale principale
613-239-5678, ext. / poste 5691
National Capital Commission
Commission de la capitale nationale
Comment 5
![Page 13: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/13.jpg)
![Page 14: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/14.jpg)
1
Garland, Jade
From: MacMillan, Meghan
Sent: Thursday, August 17, 2017 4:00 PM
To: Garland, Jade
Subject: FW: Message from KM_C368,Ottawa
Attachments: SKM_C36817081715530.pdf
Meghan MacMillan, MCIP, RPP T+ 1 613-690-1117 M+ 1 613-862-0773
From: [email protected] [mailto:[email protected]]
Sent: Thursday, August 17, 2017 3:56 PM
To: MacMillan, Meghan <[email protected]>
Cc: [email protected]; [email protected]
Subject: Message from KM_C368,Ottawa
Hi,
To the attention of Carmen Lapointe,
Here is the copy of the comment form in response for non-participation of videotron in this project at ottawa.
Best Regards.
Robert Levac Concepteur Coordonateur, Conception & Ingénierie Vidéotron L'entreprise de télécommunications la plus appréciée de ses clients. videotron.com/distinctions
2155, boul. Pie IX, Montréal (Québec) H1V 2E4 Tél. : 514 380-1423 | Téléc. : 514 380-9173 | [email protected]
Devez-vous imprimer ce courriel ?
Avis de confidentialité : Ce message, transmis par courriel, est confidentiel, peut être protégé par le secret professionnel et est à l'usage exclusif du destinataire dont l’adresse figure ci-dessus. Toute autre personne est par la présente avisée qu'il lui est strictement interdit de le diffuser, le distribuer ou le reproduire. Si vous avez reçu ce courriel par erreur, veuillez m'en informer par courrier électronique et détruire immédiatement ce message et toute copie de celui-ci. Merci. Confidentiality notice: The content of this e-mail is confidential, may be privileged and is intended for the exclusive use of the addressee. Any other person is strictly prohibited from disclosing, distributing or reproducing it. If you have received this e-mail by error, please notify me by e-mail and delete all copies. Thank you.
Comment 6
![Page 15: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/15.jpg)
![Page 16: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/16.jpg)
1
Garland, Jade
To: MacMillan, Meghan
Subject: RE: Class EA for Highway 417 Nicholas Street (Site #3-224) Underpass Replacement
GWP 4048-11-00
From: Alting-Mees, Birgitte [mailto:[email protected]]
Sent: Monday, August 21, 2017 10:56 AM
To: MacMillan, Meghan <[email protected]>
Cc: Rampersad, Curtis <[email protected]>
Subject: Class EA for Highway 417 Nicholas Street (Site #3-224) Underpass Replacement GWP 4048-11-00
Attention: Ms. Carmen Lapointe, P.Eng. Further to your Notice of Study Commencement (August 9, 2017), please be advised that I would like to be included in the TAC. Contact details are noted below.
There is an existing 1220mm Transmission Watermain (built in 1961, Concrete C-300 pressure pipe) “under” the south west quadrant interchange ramp. The Risk Assessment for the “Highway 417 water Transmission Main – Nicholas to Highway 417/174 Split” completed in December 2011, did not specifically address the bridge replacement, only the highway widening that was proposed at the time. The MTO will need to undertake a risk assessment to review the proposed underpass with respect to the watermain infrastructure and identify the necessary risk mitigation measures for its protection both during construction and the final product.
We would be happy to discuss this with you.
Birgitte C. Alting-Mees, P.Eng. Senior Engineer, Infrastucture Renewal Infrastructure Assessment - Water Resources Asset Unit Asset Management Branch, Infrastucture Services Planning, Infrastructure & Economic Development Department City of Ottawa | Ville d'Ottawa
100 Constellation Dr | promenade Constellation, Ottawa ON K2G 6J8
Tel.|Tél 613 580-2424 ext.|poste 16001 [email protected]
This e-mail originates from the City of Ottawa e-mail system. Any distribution, use or copying of this e-mail or
the information it contains by other than the intended recipient(s) is unauthorized. Thank you.
Comment 7
![Page 17: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/17.jpg)
Ministry of Tourism, Culture and Sport
Culture Services Unit Programs and Services Branch 401 Bay Street, Suite 1700 Toronto ON M7A 0A7 Tel: 416 314 7182 Fax: 416 212 1802
Ministère du Tourisme, de la Culture et du Sport
Unité des services culturels Direction des programmes et des services 401, rue Bay, Bureau 1700 Toronto ON M7A 0A7 Tél: 416 314 7182 Téléc: 416 212 1802
August 22, 2017 (EMAIL ONLY) Carmen Lapointe, Consultant Project Manager WSP Canada 1145 Hunt Club Road, Suite 200 Ottawa, ON K1V 0Y3 E: [email protected]
RE: MTCS file #: 0007316 Proponent: Ministry of Transportation Subject: Notice of Study Commencement
Highway 417 Nicholas Street Underpass Replacement (Site #3-224) (GWP 4048-11-00), Detail Design
Location: City of Ottawa, Ontario Dear Carmen Lapointe:
Thank you for providing the Ministry of Tourism, Culture and Sport (MTCS) with the Notice of Commencement for your project. MTCS’s interest in this EA project relates to its mandate of conserving Ontario’s cultural heritage, which includes:
Archaeological resources, including land-based and marine;
Built heritage resources, including bridges and monuments; and,
Cultural heritage landscapes. Under the EA process, the proponent is required to determine a project’s potential impact on cultural heritage resources. Please note that the Standards and Guidelines for Conservation of Provincial Heritage Properties (S&G), prepared pursuant to Section 25.2 of the Ontario Heritage Act (OHA), came into effect on July 1, 2010. All Ontario government ministries and public bodies that are prescribed under Ontario Regulation 157/10 must comply with the S&Gs with respect to property that is owned or controlled by the Crown in right of Ontario or by a prescribed public body. While some cultural heritage resources may have already been formally identified, others may be identified through screening and evaluation. Aboriginal communities may have knowledge that can contribute to the identification of cultural heritage resources, and we suggest that any engagement with Aboriginal communities includes a discussion about known or potential cultural heritage resources that are of value to these communities. Municipal Heritage Committees, historical societies and other local heritage organizations may also have knowledge that contributes to the identification of cultural heritage resources. Archaeological Resources Your EA project may impact archaeological resources and you should screen the project with the MTCS Criteria for Evaluating Archaeological Potential to determine if an archaeological assessment is needed. MTCS archaeological sites data are available at [email protected]. If your EA project area exhibits archaeological potential, then an archaeological assessment (AA) should be undertaken by an
![Page 18: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/18.jpg)
It is the sole responsibility of proponents to ensure that any information and documentation submitted as part of their EA report or file is accurate. MTCS makes no representation or warranty as to the completeness, accuracy or quality of the any checklists, reports or supporting documentation submitted as part of the EA process, and in no way shall MTCS be liable for any harm, damages, costs, expenses, losses, claims or actions that may result if any checklists, reports or supporting documents are discovered to be inaccurate, incomplete, misleading or fraudulent. Please notify MTCS if archaeological resources are impacted by EA project work. All activities impacting archaeological resources must cease immediately, and a licensed archaeologist is required to carry out an archaeological assessment in accordance with the Ontario Heritage Act and the Standards and Guidelines for Consultant Archaeologists. If human remains are encountered, all activities must cease immediately and the local police as well as the Cemeteries Regulation Unit of the Ministry of Government and Consumer Services must be contacted. In situations where human remains are associated with archaeological resources, MTCS should also be notified to ensure that the site is not subject to unlicensed alterations which would be a contravention of the Ontario Heritage Act.
archaeologist licenced under the OHA, who is responsible for submitting the report directly to MTCS for review. Built Heritage and Cultural Heritage Landscapes The MTCS Criteria for Evaluating Potential for Built Heritage Resources and Cultural Heritage Landscapes should be completed to help determine whether your EA project may impact cultural heritage resources. The Clerk for the municipality encompassing the EA project can provide information on property registered or designated under the Ontario Heritage Act. Municipal Heritage Planners can also provide information that will assist you in completing the checklist. The draft MTO Ontario Heritage Bridge Guidelines for Provincially Owned Bridges screening criteria have also been established for cultural heritage evaluation of bridges under the Class EA for Provincial Transportation Facilities. A Cultural Heritage Evaluation Report (CHER) is used to determine the cultural heritage value or interest of a potential Provincial Heritage Property. If potential or known heritage resources exist, MTCS recommends that a Heritage Impact Assessment (HIA), prepared by a qualified consultant, should be completed to assess potential project impacts. Our Ministry’s Info Sheet #5: Heritage Impact Assessments and Conservation Plans outlines the scope of HIAs. Please send the HIA to MTCS and the local municipality for review, and make it available to local organizations or individuals who have expressed interest in heritage. Environmental Assessment Reporting All technical heritage studies and their recommendations are to be addressed and incorporated into EA projects. Please advise MTCS whether any technical heritage studies will be completed for your EA project, and provide them to MTCS before issuing a Notice of Completion. If your screening has identified no known or potential cultural heritage resources, or no impacts to these resources, please include the completed checklists and supporting documentation in the EA report or file. Thank-you for consulting MTCS on this project: please continue to do so through the EA process, and contact me for any questions or clarification. Sincerely, Jeff Elkow Heritage Planner [email protected] Copied to: David Lindensmith, MTO Senior Project Engineer E: [email protected]
![Page 19: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/19.jpg)
1
Garland, Jade
From: Lapointe, Carmen
Sent: Wednesday, August 23, 2017 1:55 PM
To: Carneiro, Michael
Cc: Mohamed, Jama A; Edison, Stuart; Brinkmann, Chris; Ha, Leng; MacMillan, Meghan;
Garland, Jade; 'Dave Lindensmith ([email protected])'
Subject: RE: Scanned document: /email/MFP4003720170817143242.pdf
Michael,
Thank you for getting back to us. I will make sure you are added to our contact list for the City of Ottawa, representing
the Traffic Operations Department.
Regards,
Carmen
Carmen Lapointe, P.Eng.
Project Manager
Transportation - Highways Department
WSP Canada
1145 Hunt Club Road, Suite 200
Ottawa, Ontario K1V 0Y3 Canada
T +1 613-690-1092 (Direct Line)
F +1 613-736-8710
www.wsp-pb.com
This communication is intended for the sole use of the person(s) to whom it is addressed, and may contain information
that is privileged, confidential or subject to copyright. Any unauthorized use, disclosure or copying of this
communication is strictly prohibited. If you have received this communication in error, please contact the sender
immediately. Any communication received in error should be deleted and all copies destroyed.
Please consider the environment before printing this e -mail and/or its attachments.
-----Original Message-----
From: Carneiro, Michael [mailto:[email protected]]
Sent: August 23, 2017 11:19 AM
To: 'Dave Lindensmith ([email protected])'; Lapointe, Carmen
Cc: Mohamed, Jama A; Edison, Stuart; Brinkmann, Chris; Ha, Leng
Subject: FW: Scanned document: /email/MFP4003720170817143242.pdf
Comment 9
![Page 20: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/20.jpg)
2
Hi Dave/Carmen,
I will be representing the Traffic Operations department on behalf of the City of Ottawa.
Thanks,
Michael Carneiro,
Coordinator, Transportation System Management, Traffic Operations Unit, City of Ottawa
tel: 613 580 2424 x23220
---------------------------------------
-----Original Message-----
From: Mohamed, Jama A
Sent: Friday, August 18, 2017 8:10 AM
To: Carneiro, Michael <[email protected]>; Edison, Stuart <[email protected]>
Cc: Brinkmann, Chris <[email protected]>
Subject: FW: Scanned document: /email/MFP4003720170817143242.pdf
Mike
This is in your area. Please advise the MTO consultant that you will represent the Traffic Engineering unit.
Cheer
Jama
-----Original Message-----
From: Brinkmann, Chris
Sent: Thursday, August 17, 2017 2:37 PM
To: Edison, Stuart <[email protected]>; Mohamed, Jama A <[email protected]>
Cc: Kent, Greg <[email protected]>
Subject: Fw: Scanned document: /email/MFP4003720170817143242.pdf
Stuart/Jama. Please respond directly if you wish to assign someone from your shop. Thanks Chris
Sent from my BlackBerry 10 smartphone on the TELUS network.
Original Message
From: donotreply <[email protected]>
Sent: Thursday, August 17, 2017 2:33 PM
To: Brinkmann, Chris
Subject: Scanned document: /email/MFP4003720170817143242.pdf
The scanned document is attached to this message.
This e-mail originates from the City of Ottawa e-mail system. Any distribution, use or copying of this e-mail or the
information it contains by other than the intended recipient(s) is unauthorized. Thank you.
Le présent courriel a été expédié par le système de courriels de la Ville d'Ottawa. Toute distribution, utilisation ou
reproduction du courriel ou des renseignements qui s'y trouvent par une personne autre que son destinataire prévu est
interdite. Je vous remercie de votre collaboration.
![Page 21: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/21.jpg)
Comment 10
![Page 22: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/22.jpg)
1
Garland, Jade
From: MacMillan, Meghan
Sent: Thursday, August 31, 2017 9:28 AM
To: Garland, Jade
Subject: Fwd: Highway 417 Nicholas Street Underpass Comment Form
Attachments: comment form 17-303.pdf
---------- Forwarded message ----------
From: "Mikula, Kristi (OPP)" <[email protected]>
Date: 31 Aug 2017 9:15 a.m.
Subject: Highway 417 Nicholas Street Underpass Comment Form
To: "MacMillan, Meghan" <[email protected]>
Cc:
Good Morning Meghan,
Please find attached the OPP’s comment form for the Highway 417 and Nicholas Street underpass project.
Please do not hesitate to contact me if you have any further questions.
All the Best,
Kristi Mikula B.A.Sc. Hons., RAPP
A/Research Analyst Research & Program Evaluation Unit Business Management Bureau/Ontario Provincial Police 777 Memorial Ave – 1st Floor/Orillia, Ontario L3V 7V3 Ph 705-329-6748 / Fx 705-329-7596 / Kristi. [email protected]
Comment 11
![Page 23: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/23.jpg)
![Page 24: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/24.jpg)
1
Garland, Jade
To: Lapointe, Carmen
Subject: RE: Highway 417 Nicholas Street Underpass Replacement
From: Jonathan Blackham [mailto:[email protected]]
Sent: September 11, 2017 11:48 AM
To: Lapointe, Carmen
Subject: Highway 417 Nicholas Street Underpass Replacement
Please find attached a briefing note for considering during the detail design and construction phases for Highway 417 Nicholas Street Underpass Replacement. Sincerely, Jonathan Blackham Director, Policy and Public Affairs Ontario Trucking Association t: 416-249-7401 ext. 247 | e: [email protected] | w: www.ontruck.org
Comment 12
![Page 25: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/25.jpg)
Modernizing Ontario’s Infrastructure
Ontario Trucking Association 555 Dixon Road, Toronto, ON M9W 1H8
Tel: (416)249-7401 – Fax: 1(866)713-4188 -- Email: [email protected] – www.ontruck.org
OTA| |2017
Ontario’s Trucking Industry
Ontario’s economic prosperity is in large part dependent upon the ability of its industry to compete for market share in the North American supply chain. As the preferred mode for getting finished goods and business inputs to market efficiently and reliably, trucking plays a vital economic role. For example, 90% of all consumer products and foodstuffs are delivered by truck as is most of Ontario’s trade with the U.S. Simply put, without trucks the economy stops. Trucking dominates the freight distribution marketplace because of its suited ability to meet the demands of time-sensitive, door-to-door service. This means, when physical infrastructure is built, maintained, or upgraded, consideration for the accommodation of commercial vehicles is crucial.
Consideration for Trucking Activities
As a major user of Ontario’s infrastructure, well maintained highways and modern interchanges are of the utmost importance to the Ontario trucking industry. It is crucial that MTO, consultants and contractors consider trucking activities in both the design of new infrastructure and during the construction periods. While not exhaustive, below are some key considerations.
New Infrastructure / Revitalization Design Considerations
Whenever projects are being considered, adequate thought should be given to the current commercial vehicle and potential future commercial vehicle activity that infrastructure might need to accommodate.
When planning projects, consideration should also be given to transportation companies and their suppliers located in the area (fuel, restaurants, truck service facilities etc…). OTA has member companies with terminals and businesses located throughout the province, all of which rely on their connection to these essential services and the provincial highway network.
Construction activity should take into consideration all of the operating conditions of the Ontario Long Combination Vehicles Program (LCV) if applicable. The Ontario LCV program has been growing steadily since 2009 and designing infrastructure that can
support their use will be of the utmost importance to Ontario businesses and the competitiveness of Ontario in the North American supply chain.
Project should consider the special requirements of MTO’s Oversize / Overweight Permitting program. The Oversize / Overweight Permit program supports the many specialized businesses in Ontario that produce products that when transported by truck are outside of the typical dimensions permitted by the highway traffic act (lane widths and vertical clearance are key considerations for this sector).
Considerations during Construction Periods
Open lines of communication should be maintained at all times between the construction contractor, the trucking industry, the Ministry of Transportation, and the Ontario Provincial Police. Closures or restrictions need to be communicated well in advance to all.
Sufficient shoulder widths should be provided during construction to allow vehicles in emergency situations to remain clear of the travelled section.
Warning devices and sufficient signage should be placed well in advance of construction zones, alerting traffic to the ongoing work. In corridors with heavy truck traffic, there should be consideration for going above and beyond what is required in the Ontario Traffic Manual.
Sufficient lane widths (including shoulders) should be maintained in construction zones to safely facilitate all traffic, including over-size loads and emergency vehicles.
Conclusion
While this list is not exhaustive, it is meant to highlight the importance of considering the needs of commercial vehicles in the development and maintenance of the provinces physical infrastructure. Should MTO, their consultants or contractors every require more, please contact OTA at operations&[email protected]
![Page 26: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/26.jpg)
3
From: Eric Lalande [mailto:[email protected]]
Sent: September 29, 2017 9:41 AM
To: Lapointe, Carmen
Subject: Nicholas Street Structure Replacement
Hi Carmen,
Glen Mcdonald has forwarded me your contact information regarding a structure replacement on Nicholas Street. Could
you forward me more information about the location of the replacement to determine the RVCA’s involvement (along
with the meeting request for the TAC)?
Thanks,
Eric Lalande, MCIP, RPP
Planner,
Rideau Valley Conservation Authority
613-692-3571 x1137
3889 Rideau Valley Drive, PO Box 599
Manotick, ON K4M 1A5
www.rvca.ca
NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies. You are receiving this communication because you are listed as a current WSP contact. Should you have any questions regarding WSP's electronic communications policy, please consult our Anti-Spam Commitment at www.wsp.com/casl. For any concern or if you believe you should not be receiving this message, please forward this message to [email protected] so that we can promptly address your request. Note that not all messages sent by WSP qualify as commercial electronic messages. AVIS : Ce message, incluant tout fichier l'accompagnant (« le message »), peut contenir des renseignements ou de l'information privilégiés, confidentiels, propriétaires ou à divulgation restreinte en vertu de la loi. Ce message est destiné à l'usage exclusif du/des destinataire(s) voulu(s). Toute utilisation non permise, divulgation, lecture, reproduction, modification, diffusion ou distribution est interdite. Si vous avez reçu ce message par erreur, ou que vous n'êtes pas un destinataire autorisé ou voulu, veuillez en aviser l'expéditeur immédiatement et détruire le message et toute copie électronique ou imprimée. Vous recevez cette communication car vous faites partie des contacts de WSP. Si vous avez des questions concernant la politique de communications électroniques de WSP, veuillez consulter notre Engagement anti-pourriel au www.wsp.com/lcap. Pour toute question ou si vous croyez que vous ne devriez pas recevoir ce message, prière de le transférer au [email protected] afin que nous puissions rapidement traiter votre demande. Notez que ce ne sont pas tous les messages transmis par WSP qui constituent des messages electroniques commerciaux.
-LAEmHhHzdJzBlTWfa4Hgs7pbKl
Comment 13
![Page 27: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/27.jpg)
1
Garland, Jade
To: Lapointe, Carmen
Subject: RE: Nicholas Street Structure Replacement
From: Lapointe, Carmen
Sent: October 5, 2017 10:20 AM
To: 'Eric Lalande'
Cc: MacDonald, Lincoln
Subject: RE: Nicholas Street Structure Replacement
Hi Eric!
Thank you for getting back to us regarding the RVCA’s interest and confirmation that no permits will be required from
your organization to proceed with the proposed Nicholas Street bridge replacement.
As the design progresses, we will ensure that information regarding the drainage patterns and any changes to the
stormwater run-off, if any, will be relayed to the RVCA.
Regards,
Carmen
Carmen Lapointe, P.Eng. Project Manager Transportation - Highways Department
WSP Canada 1145 Hunt Club Road, Suite 200 Ottawa, Ontario K1V 0Y3 Canada T +1 613-690-1092 (Direct Line) F +1 613-736-8710 [email protected] www.wsp-pb.com This communication is intended for the sole use of the person(s) to whom it is addressed, and may contain information that is privileged, confidential or subject to copyright. Any unauthorized use, disclosure or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender immediately. Any communication received in error should be deleted and all copies destroyed.
� Please consider the environment before printing this e-mail and/or its attachments.
From: Eric Lalande [mailto:[email protected]]
Sent: October 5, 2017 10:04 AM
To: Lapointe, Carmen
Comment 13a
![Page 28: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/28.jpg)
2
Cc: MacDonald, Lincoln
Subject: Re: Nicholas Street Structure Replacement
Hi Carmen,
It appears the work proposed is to be located outside of the RVCA's regulated area and will not require any
permits from our end. However, please keep me informed as the project evolves. The RVCA would be
interested in information related to drainage patterns, and ensuring that stormwater run-off will not be
negatively impacted (both quality and quantity) from this replacement.
Thank you,
Eric.
From: Lapointe, Carmen <[email protected]>
Sent: October 3, 2017 10:45:58 PM
To: Eric Lalande
Cc: MacDonald, Lincoln
Subject: RE: Nicholas Street Structure Replacement
Eric,
As requested, please find attached a copy of the Notice of Study Commencement for this project as well as preliminary
plan drawing showing the location of the new Nicholas Street Bridge and proposed ramp re-alignments.
If you should have any questions, please don’t hesitate to contact me.
Regards,
Carmen
Carmen Lapointe, P.Eng. Project Manager Transportation - Highways Department
WSP Canada 1145 Hunt Club Road, Suite 200 Ottawa, Ontario K1V 0Y3 Canada T +1 613-690-1092 (Direct Line) F +1 613-736-8710 [email protected] www.wsp-pb.com This communication is intended for the sole use of the person(s) to whom it is addressed, and may contain information that is privileged, confidential or subject to copyright. Any unauthorized use, disclosure or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender immediately. Any communication received in error should be deleted and all copies destroyed.
� Please consider the environment before printing this e-mail and/or its attachments.
![Page 29: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/29.jpg)
1
Garland, Jade
Subject: FW: Highway 417 Nicholas Street Underpass Replacement
Attachments: KV Info Request English 2016.pdf
From: Dillon, Mary (MNRF) [mailto:[email protected]]
Sent: October 20, 2017 3:11 PM
To: Lapointe, Carmen
Subject: Highway 417 Nicholas Street Underpass Replacement
Dear Ms. Lapointe, We have received the Notice of Public Information Centre for the Highway 417 Nicholas Street Underpass Replacement (GWP 4048-11-00). We would like to provide information on any natural heritage features or Species At Risk present at/near the project site and would also like to review any reports prepared as part of the Class EA. If you have not done so already, would you please fill out the attached information request form which will help us to screen potential values for this project. Thank you, Mary
Mary Dillon
A/District Planner
613-258-8470
Comment 15Comment 14
![Page 30: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/30.jpg)
COMMENT SHEET! FEUILLE DE COMMENTAIRESHIGHWAY 417 NICHOLAS STREET UNDERPASS(SITE #3-224) REPLACEMENT, DETAIL DESIGNAND ENVIRONMENTAL ASSESSMENT STUDY
REMPLACEMENT DU PASSAGE INFERIEUR DE LARUE NICHOLAS, CONCEPTION DETAILLEE ETÉTUDE D’EVALUATION ENVIRONNEMENTALE
(GWP 4048-11-00)
PUBLIC INFORMATION CENTRE! SÉANCE D’INFORMATION PUBLIQUE
WEDNESDAY OCTOBER 25 2017 LE MERCREDI 25 OCTOBRE 2017Saint Paul University — Normandin Room Université Saint-Paul, salle Normandin
223 Main Street 223, rue MainOttawa, ON K1S 1C4 Ottawa (Ontario) KIS 1C44:O0pmto8:OOpm l6hà2Oh
PLEASE NOTE: Either drop your completed comment sheet in the box provided or send it by November 8. 2017 to:
NOTEZ S.V.P.: Déposez votre feuille de commentaires remplie dans Ia bofte prévue a cet effet ou envoyez-Ià, au plustard Ic 8 novembre 2017 a:
Ms. Carmen Lapointe, P.Eng.Consultant Project Manager (WSP)
1145 Hunt Club Road, Suite 200Ottawa,ON K1VOY3
Fax: (613) 736-8710E-mail: [email protected]
Please check here if a response is not required.Veuillez cocher Id si une réponse West pas nécessaire.
Mme Carmen Lapointe, P.Eng.Chargée de projet (WSP)
1145 chemin Hunt Club, bureau 200Ottawa (Ontario) K1V 0Y3Téléc: (613) 736-8710
Courriel : [email protected]
If a response is required, please indicate your preferred method of correspondence:Si une réponse est requise, s’il vous plait indiquer votre méthode désirée de correspondence:
COMMENTS! COMMENTAIRES:
PLEASE PRINT I IMPRIMER, S.V.P.:
LI E-mail / Courriel LI Regular Mail / Poste régulière
- an’
NAME/NOM:
ADDRESS IADRESSE:
EMAIL!COURRIEL:
VIiiC L~t~1r;er \&1
~
*0
~Cct C ~“S ‘wa’ fl’
&DL,ift ~
A Ia ê.’
I— ,-~
S fltc
;o’-~~~.
Thank you for your participation. Comments and information regarding this study are being collected in accordance with the Freedom oflnfomiation and Protection of Privacy Act, and solely for the purpose of conducting the environmental assessment and detail design. Withthe exception of personal information, all comments will become part of the public record.
Mercl pour volta participation. Nous recueillerons les commentaires et les renseignements sur cette étude conformement a Ia Loi surracces a ‘information at Ia protection de Ia vie privée, et uniquement pour mener l’Ovaluation environnementale et Ia conception détaillée. Al’exception des renseignements personnels, tous les commentaires feront partie du domaine public.
Comment 16Comment 15
![Page 31: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/31.jpg)
1
Garland, Jade
Subject: FW: 417 Nicholas Street
From: Fleury, Mathieu [mailto:[email protected]]
Sent: November 1, 2017 11:20 AM
To: Lapointe, Carmen; [email protected]
Cc: Jordan, Emily
Subject: 417 Nicholas Street
Hi Carmen and Dave,
I missed your consultation last Wednesday but Emily provided me with the boards.
I have two further concerns. Firstly, there is a sidewalk at the south west corner of Laurier and Nicholas.
Residents travel along Nicholas here because it’s not clear at that point that’s it’s an on-ramp. Could a jersey
barrier be put here as part of this project? https://www.google.ca/maps/@45.423104,-
75.6875419,3a,75y,158.38h,65.45t/data=!3m6!1e1!3m4!1scldHoBUuCFo_qB1tS48nvA!2e0!7i13312!8i6656
Secondly, there have been multiple instance of trucks flipping getting onto the highway eastbound. Was the
turning radius reconsidered here?
thanks,
Mathieu Fleury City Councillor|Conseiller municipal Ward |Quartier 12 (Rideau-Vanier) (613) 580-2482 [email protected]
'
This e-mail originates from the City of Ottawa e-mail system. Any distribution, use or copying of this e-mail or
the information it contains by other than the intended recipient(s) is unauthorized. Thank you.
Le présent courriel a été expédié par le système de courriels de la Ville d'Ottawa. Toute distribution, utilisation
ou reproduction du courriel ou des renseignements qui s'y trouvent par une personne autre que son destinataire
prévu est interdite. Je vous remercie de votre collaboration.
'
Comment 17Comment 16
![Page 32: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/32.jpg)
1
Garland, Jade
Subject: RE: Highway 417 Nicholas Street Underpass (Site #3-224) Replacement, Detail Design :
Queensway Expansion East
-----Original Message-----
From: Sott, Anita
Sent: Wednesday, December 06, 2017 10:39 AM
To: MacMillan, Meghan <[email protected]>
Subject: FW: Highway 417 Nicholas Street Underpass (Site #3-224) Replacement, Detail Design : Queensway Expansion
East
-----Original Message-----
From: [mailto:[email protected]]
Sent: December-06-17 10:37 AM
To: Sott, Anita <[email protected]>
Subject: Highway 417 Nicholas Street Underpass (Site #3-224) Replacement, Detail Design : Queensway Expansion East
From:
Subject: Highway 417 Nicholas Street Underpass (Site #3-224) Replacement, Detail Design
Message Body:
I'd like to see the Nicholas interchange re-designed to provide a roundabout at the south end of the overpass. E-N and
N-E movements would use this roundabout.
This would reduce the length of the required bridge span since there would not be a need to pass over the N-E ramp.
The roundabout would also eliminate the requirement for the large loop ramps which would reduce the overall
footprint of the interchange. The surplus land could be re-purposed as greenspace for the local high-density community.
A roundabout would also not preclude the extension of Nicholas to the south as part of the AVTC project.
--
This e-mail was sent from a contact form on Queensway Expansion East
Comment 18Comment 17
![Page 33: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/33.jpg)
1
Garland, Jade
From: Garland, Jade
Sent: Tuesday, February 20, 2018 12:19 PM
To: MacMillan, Meghan
Subject: FW: Timing of Ramp and Bridge opening Old Ottawa East / LRT
Attachments: Mainstreeter_LRT Delay.pdf
Jade Garland, BSc. Env T + 1 613-690-1169
From:
Sent: Tuesday, February 20, 2018 12:04 PM
To:
Cc: Garland, Jade <[email protected]>; ; Lindensmith Dave (MTO)
Subject: Re: Timing of Ramp and Bridge opening Old Ottawa East / LRT
Good morning
We should also keep an eye on this space and notably the eastbound on ramp from Lees
as the Nicholas overpass replacement goes into full swing. There is supposed to be at
least one more open house on this project before the proposed start of spring
construction, and especially about the process for contractors seeking relief from the
City noise bylaws. Perhaps Ms. Garland has some new information.
Cheers
From: To: City of Ottawa - Media Relations/Ville d'Ottawa - Relations avec les médias <[email protected]>; Grabina Ian chernushenko <[email protected]>; "Chernushenko, David." <[email protected]> Cc: 417 noise ; ; [email protected];Sent: Tuesday, February 20, 2018 9:36 AM Subject: Timing of Ramp and Bridge opening Old Ottawa East / LRT Please see p8 of http://www.mainstreeter.ca/?wpfb_dl=76 for the story on the continued closure of the 417 eastbound on-ramp and the closure of both pathway-sides of the LRT bridge over the Rideau River. I'm preparing a brief update to the story for the subsequent Mainstreeter (my deadline March 9) and would like to know if there is anything further from the City in view of the delayed LRT opening.
Comment 19Comment 18
![Page 34: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/34.jpg)
2
Ian Grabina of David Chernushenko's office provided an update at the recent OOECA Board meeting saying the 417 Lees eastbound on-ramp wouldn't be open until a month or two after LRT opens, meaning it won't be open until January or February of 2019 - I'd like to know if I heard correctly. Secondly, I understand that Councillor Cloutier was to speak with Councillor Chernushenko about getting the LRT bridge open for cyclists / pedestrians by the "heavy cycling season" - so any news on this front? Also, I would appreciate the City responding to the question: "Why do the pathways on both sides of the bridge remain closed for construction purposes when they are not wide enough to allow even a pick-up truck to get across." I should also note that despite the fences attempting to block people from using the bridge, there is lots of footprint evidence of people going across and no evidence of the pathways being used for construction purposes. cheers john dance 613 236 0650
![Page 35: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/35.jpg)
1
Garland, Jade
From: MacMillan, Meghan
Sent: Friday, March 09, 2018 8:37 AM
To: Garland, Jade
Subject: FW: Nicholas St underpass replacement
Attachments: GWP 4048-11-00 Nicholas St UP Replacement - EN - FINAL (v1).pdf
Meghan MacMillan, MCIP, RPP T+ 1 613-690-1117 M+ 1 613-862-0773
From: Lapointe, Carmen
Sent: Thursday, March 08, 2018 5:10 PM
To:
Cc: Dave Lindesmith <[email protected]>; MacDonald, Lincoln <[email protected]>; MacMillan,
Meghan <[email protected]>; Kevin Ogilvie <[email protected]>
Subject: RE: Nicholas St underpass replacement
Thank you for your e-mail and interest in the “Nicholas Street Underpass Replacement” project.
As requested in your e-mail below, I have attached a PDF of the presentation which was given at yesterday’s
City of Ottawa Transportation Committee Meeting.
Regarding the proposed revised detours, I would like to note a few things:
• The revised detours in comparison with those initially presented to the City and the general public
(ie. Detour route using Riverside Dr. and Bronson Ave. in the westbound direction and detour route
using Isabella St., Main St. and Riverside Dr. in the eastbound direction), significantly reduce the
impact on the City of Ottawa’s existing road network and will notably reduce the required travel
time, by traffic, to navigate the detour routes;
• The ‘ramp surfing’ detours will only be implemented twice during the construction of the new
Nicholas Street bridge: (1) during the erection of the new bridge girders and (2) during the
demolition of the existing Nicholas Street structure;
• Each Highway 417 full closure will occur over a single night during a weekend so to minimize the
effects on traffic operations; and
• Paid duty police will be present on-site at each of the intersections within the planned revised
detours in order to control and direct traffic during the Highway 417 closures. Priority on the detour
routes will be given to the Highway 417 traffic.
If you should have any questions and/or concerns, please don’t hesitate to contact me.
Regards,
Comment 20Comment 19
![Page 36: COMMENTS RECEIVED · features at and adjacent to the project site has already been generated for this project (2017_NEP-4160) though the request references GWP 4070-10-00. If this](https://reader033.fdocuments.us/reader033/viewer/2022041414/5e1a8c485c8ee94b01290f93/html5/thumbnails/36.jpg)
2
Carmen Lapointe, P.Eng. Senior Project Manager Transportation - Highways Department
WSP Canada 1145 Hunt Club Road, Suite 200 Ottawa, Ontario K1V 0Y3 Canada T +1 613-690-1092 (Direct Line) F +1 613-736-8710 [email protected] www.wsp-pb.com/en/WSP-Canada/ This communication is intended for the sole use of the person(s) to whom it is addressed, and may contain information that is privileged, confidential or subject to copyright. Any unauthorized use, disclosure or copying of this communication is strictly prohibited. If you have received this communication in error, please contact the sender immediately. Any communication received in error should be deleted and all copies destroyed.
� Please consider the environment before printing this e-mail and/or its attachments.
From:
Sent: March 7, 2018 11:15 AM
To: Lapointe, Carmen <[email protected]>
Subject: Nicholas St underpass replacement
Good morning
Can I have a copy of the presentation to Ottawa’s Transportation Committee this morning? The one with the
new detours?