    AL WAAB HSE Policy & Plan comments & answer

    1. Firs submission (DWM-MSC-ACG-002-01 dated 02 Nov 2009) Hill Intl. comments item no. 4, 5, 6, 9 & 12

    are not incorporated in revised submission.

    NOTED

    2. Chapter 1. HSE Policy Statement is not signed by Managing Director / General Manager of the company with

    date. To be signed by Managing Director / General Manager

    3. Chapter 2. HSE organization structure is not mentioning top management hierarchy and organization chart is

    separate document subject to revision.

    Available in QA/QC and other manual

    4. Chapter 7. Responsibilities of staffs appear to be generic and are neither specific nor measurable in some

    cases. Responsibilities of staff indicted on safety org-chart are not provided.

    Available in QA/QC and other manual

    5. Chapter 10. Procedure (Operational safety) following operations safety element instructions are missing but

    not limited to;

    a. Backfilling,

    b. Cable and hose managementc. Compaction

    d. Cradles safety procedure,

    e. Dewatering,

    f. Edge protection,g. Floor openings / man holes,

    h. Form work erection,

    i. Garbage chute,j. Lifting / Heavy Lifting plan procedure,

    k. Masonry,

    l. MEP work procedure, duct/riser installation etc.,m. Shuttering/de-shuttering,

    n. Steel reinforcement

    o. Work at height

    p. Work at night

    Safety elements to be available in every Work Method Statement.

    6. Chapter 12. List of risk assessments and their details re to be provided.

    Blank copy of JHA was provided in the attachment. Details of risk assessments will be available

    as per Work Method Statement submitted.

    7. HSE Incentive Scheme/Program and Environment / Waste Management Program needs to be specified.

    HSE Incentive Scheme/ Program is attached. Waste Management Program is available in

    manual.

    8. HSE plan shall be reviewed periodically and Safety Manager must be available on site full time basis.

    NOTED

    9. Contractor shall submit weekly and monthly HSE performance report in Hill - International provided format.

  • 8/22/2019 Comments of Al Waab HSE

    2/2

    NOTED

    10. Contractor shall report all Near miss incident/ dangerous occurrence, Fire incident, Accident/ Incident

    immediately via telephone to Hill International. Near miss incident/ dangerous occurrence, Fire incident,

    Preliminary Accident and Detail Accident Report must be provided within 24 hrs and 72 hrs respectivelyincorporating Hill International provided format.

    NOTED

    11. HSE monitoring and enforcement for the project is a contractor sole responsibility. NOTED