Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs...

41
Colville River Crossing l Presented to: Alaskan Arctic Pipelines Workshop, Nov.8-9, 1999 Anchorage, AK By: Keith J. Meyer, P.E., Ph.D. Michael Baker Jr., Inc. Anchorage, Alaska Horizontal Drilling International, Houston, Texas Michael Baker Jr., Inc. Anchorage and Fairbanks, Alaska Houston Contracting Company, Offices in Alaska and Houston, Texas ARCO Alaska, Inc. Anchorage Alaska and Plano, Texas

Transcript of Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs...

Page 1: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Colville River Crossing

l Presented to:Alaskan Arctic Pipelines Workshop,Nov.8-9, 1999 Anchorage, AK

By: Keith J. Meyer, P.E., Ph.D.Michael Baker Jr., Inc.

Anchorage, Alaska

Horizontal Drilling International,Houston, Texas

Michael Baker Jr., Inc.Anchorage and Fairbanks, Alaska

Houston Contracting Company,Offices in Alaska and Houston, Texas

ARCO Alaska, Inc.Anchorage Alaska and Plano, Texas

Page 2: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Project OverviewProject Overview

ALPINE PROJECT (ARCO Alaska, Anadarko, Union Texas Petroleum)ALPINE PROJECT (ARCO Alaska, Anadarko, Union Texas Petroleum)

Team MembersTeam Members

Horizontal Drilling InternationalHorizontal Drilling International

Michael Baker Jr., Inc.Michael Baker Jr., Inc.

Houston Contracting CompanyHouston Contracting Company

l Crossing Engineerl Program Managerl Crossing Engineerl Program Manager

l Pipeline Support Contractorl Pipeline Support Contractor

l Crossing Installation Contractorl Crossing Installation Contractor

Page 3: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Alpine Development - Location MapAlpine Development - Location Map

River CrossingLocation

Project OverviewProject Overview

PROJECTPROJECTLOCATIONLOCATION

Page 4: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Project Ground ConditionsProject Ground Conditions

The Wintertime View

Page 5: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

l 440 Million Barrel Fieldl Grass Roots Developmentl Environmentally Sensitive Areal 80,000 Barrels/Day Productionl 35-mile Long Pipeline Systeml 4,300 Foot River Crossing

l 440 Million Barrel Fieldl Grass Roots Developmentl Environmentally Sensitive Areal 80,000 Barrels/Day Productionl 35-mile Long Pipeline Systeml 4,300 Foot River Crossing

SpecificsSpecificsProject OverviewProject Overview

Page 6: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Delta Conditions - ‘96 BreakupDelta Conditions - ‘96 Breakup

Page 7: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Caribou MigrationCaribou Migration

Page 8: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Bird HabitatBird Habitat

Page 9: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Crossing Location f( Larger Issues)Crossing Location f( Larger Issues)

ARCOParameters

CriticalIssues

Workshop

Development StrategyNo RoadDecision

Overland & InfieldPipeline Alternatives

Prepare Concept LevelDesigns

PrepareConcept

LevelDesigns

EvaluateAlternatives

River CrossingAlternatives

PrepareConcept

LevelDesigns

EvaluateAlternatives

Overland & InfieldPipeline Routes

DevelopPreliminaryPipeline and

RoadAlignments

MacroStudy

IdentifyPreferredAlternatives

1996/97Winter

GeotechnicalProgram

OptimizationWork

Best OptionsSelection

Page 10: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Crossing Location SelectionCrossing Location Selection

l Cross-Section 14 shorter (4,200 vs10,000 feet)

l Longer Pipeline Route for 14 (30vs 34 miles)

l No In-Delta Water Xings w/14

l Soil Strata Less Defined at 10

Selected Route (XS-14)

Alternate Route (XS-10)

Page 11: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

l 4 Pipeline Crossings: 4,300 Feet Each

l 14-inch Crude Oil: 20-inch Casing

l 12-inch Seawater: 18-inch Casing

l 8-inch Utility Casing: Diesel/Fiber Optics

l 8-inch Anode: Cathodic Protection

l 4 Pipeline Crossings: 4,300 Feet Each

l 14-inch Crude Oil: 20-inch Casing

l 12-inch Seawater: 18-inch Casing

l 8-inch Utility Casing: Diesel/Fiber Optics

l 8-inch Anode: Cathodic Protection

Crossing Design - East ChannelCrossing Design - East Channel

Page 12: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Crossing Mode AlternativesCrossing Mode Alternatives

– Suspension Bridge– Suspension Bridge

– Trench– Trench

– HDD– HDD

Page 13: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

– Advantages• Less Subsurface Impact• Easy to Monitor/Inspect• No Corrosion Issues• Future Lines at Little Cost

– Advantages• Less Subsurface Impact• Easy to Monitor/Inspect• No Corrosion Issues• Future Lines at Little Cost

– Disadvantages• Construction Over/In River• Highest Labor/Equip Impacts• 2 Construction Seasons• High Visual Impact• High Removal Cost

Suspension BridgeAlternativeSuspension BridgeAlternative

Page 14: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

• Advantages• Buried - Protected w/Low O&M• Retired In Place• Not Limited by Length.

• Advantages• Buried - Protected w/Low O&M• Retired In Place• Not Limited by Length.

Trenched AlternativeTrenched Alternative

• Disadvantages• Extensive Work In the River• Impacts to Fish/River Activity• Requires Cathodic Protection• Future Lines Expensive• 2 Seasons Construction

Page 15: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

– Advantages• Small Construction Footprint• Lowest Labor/Equip Impact• No Work In/Over River• No Impact - Fish/river Activity• Shortest Construction Duration• Buried - Protected W/Low O&M

• Retired in Place• Length OK W/ HDD Technology

– Advantages• Small Construction Footprint• Lowest Labor/Equip Impact• No Work In/Over River• No Impact - Fish/river Activity• Shortest Construction Duration• Buried - Protected W/Low O&M

• Retired in Place• Length OK W/ HDD Technology

– Disadvantages• Subsurface Sensitive• Requires Cathodic protection• Future Lines Expensive• No History in the Arctic

Horizontal DirectionallyDrilledHorizontal DirectionallyDrilled

Page 16: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

River Crossing Design SequenceRiver Crossing Design Sequence

ê Geotech Programê Thermal Modelingê Thaw Settlementè Strain Based Design

l Pipe Coatingl Cathodic Protection

è Materialsw Tensile (yield/ultimate)

è Weldingw Need low fy/fuw Low Heat Procedurew CTODw Mod. Acceptance

Criteriaw Enhanced NDE

Page 17: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

2D Model Ground Elevations

Page 18: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Water Depths with 50 yr. Event

Page 19: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

200 year Event @ River Crossing200 year Event @ River Crossing

water depth 200-yr with facility

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

22.0

Page 20: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Crossing Soils & Design ProfileCrossing Soils & Design ProfileHorizontal Directional DrillingHorizontal Directional Drilling

Page 21: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Thermal ModelingThermal Modeling

l For hot pipelines buried inpermafrost

l Or for cold pipelinesburied in thawed frostsusceptible soils

l Thaw/frost bulb diametercoupled with thawsettlement or heavepredictions from thegeotechnical program

l Results used to predictstrain in pipeline

l For hot pipelines buried inpermafrost

l Or for cold pipelinesburied in thawed frostsusceptible soils

l Thaw/frost bulb diametercoupled with thawsettlement or heavepredictions from thegeotechnical program

l Results used to predictstrain in pipeline

Page 22: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Predicted Displacement Profile

0

5

10

15

20

25

30

35

0 5 10 15 20 25 30 35 40 45 50

Distance from Center of Settlement (ft)

Dis

pla

cem

ents

(in

)

Relative Installed CurvatureDisplacementGravity Load Displacement

Thermal Load Displacement

15-Year Thaw Displacement

25-Year Thaw Displacement

30-Year Thaw Displacement

Imposed 30-Year ThawSettlementTotal Thaw

Page 23: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Predicted Strain ProfileTop Axial Strains (Compression Negative)

-0.9

-0.8

-0.7

-0.6

-0.5

-0.4

-0.3

-0.2

-0.1

0

0.1

0 5 10 15 20 25 30 35 40 45 50

Distance from Center of Settlement (ft)

Axi

al S

trai

n (

%)

Installed Curvature

Gravity Loads

Thermal Loads

15-Year Settlement

25-Year Settlement

30-Year ThawSettlementMaximum CompressiveStrain Criteria

Page 24: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Execution Critical Success FactorsExecution Critical Success Factors

l Effectively Mobilize, Execute and De-mobilize– Leave Nothing Behind but the Pipeline

l Correct Adjustment of HDD for Arctic Conditions– Drill Slurry (Mud) Design– Cold Weather Outfitting of Equipment and Enclosures– Staffing for 24 Hour, Remote Location Effort

l Successful Insertion of Specialty Contractor IntoNorth Slope Project Environment– Safety– Production– Schedule– Quality

l Effectively Mobilize, Execute and De-mobilize– Leave Nothing Behind but the Pipeline

l Correct Adjustment of HDD for Arctic Conditions– Drill Slurry (Mud) Design– Cold Weather Outfitting of Equipment and Enclosures– Staffing for 24 Hour, Remote Location Effort

l Successful Insertion of Specialty Contractor IntoNorth Slope Project Environment– Safety– Production– Schedule– Quality

Page 25: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Horizontal Directional DrillingHorizontal Directional Drilling

Page 26: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Typical HDD CrossingsTypical HDD Crossings

l Rivers, Canals, Estuariesl Roads, Freewaysl Protected Habitat - Wetlands and Nesting

Areasl Shore Approachesl Other Buried Utilities

l Rivers, Canals, Estuariesl Roads, Freewaysl Protected Habitat - Wetlands and Nesting

Areasl Shore Approachesl Other Buried Utilities

Horizontal Directional DrillingHorizontal Directional Drilling

Page 27: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Pilot HolePilot HoleHorizontal Directional DrillingHorizontal Directional Drilling

Page 28: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

DESIGNED DRILLED PATH

DRILL PIPE

EXIT POINTENTRY POINT

HORIZONTAL DRILLING RIG

STAGE 1, PILOT HOLE DIRECTIONAL DRILLING

THEORETICAL ANNULUS

DRILLING FLUID RETURNS

GENERAL DIRECTION OF PROGRESSPILOT HOLE DRILLING

Pilot Hole DrillingSchematicPilot Hole DrillingSchematic

Long (1500-2500 ft)Radius Turns

Downhole Assembly

Page 29: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

TruTracker Survey SystemTruTracker Survey System

TruTracker is a Trademark ofSharewell, Inc.

TechnologiesTechnologies

Page 30: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

SURFACE COIL

KNOWN CORNER LOCATIONS

SURVEYPROBE

Survey SystemComponentsSurvey SystemComponents

Page 31: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

TruTracker Grid at ColvilleTruTracker Grid at ColvilleTechnologiesTechnologies

Energizing CoilEnergizing Coil

Page 32: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

ReamingReamingHorizontal Directional DrillingHorizontal Directional Drilling

Page 33: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

PullbackPullbackHorizontal Directional DrillingHorizontal Directional Drilling

Page 34: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Construction Infrastructure and LogisticsConstruction Infrastructure and Logistics

Page 35: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Pre-Drilling EquipmentPre-Drilling Equipment

Page 36: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

l Construct Site Access & Service Roadsl Construct HDD Ice/snow Work Padsl Construct Ice/Snow ROW Road From

HDD Site to Alpine Pad

l Construct Site Access & Service Roadsl Construct HDD Ice/snow Work Padsl Construct Ice/Snow ROW Road From

HDD Site to Alpine Pad

Ice Roads & PadsIce Roads & PadsIce Roads & Pads

Page 37: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Shelters, West(-50 Degrees Fahrenheit,January 17, 1999)

Page 38: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Entry PitsEntry Pits

DeadmanDeadman

Pit LinerPit Liner

PlywoodFlooringPlywoodFlooring

Page 39: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Shelter OperationsShelter Operations

l All DrillingOperations Indoors

l Shelter Maintainedat 40-45ºF

l All DrillingOperations Indoors

l Shelter Maintainedat 40-45ºF

Page 40: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200

Colville River Crossing Construction Campl Housed 100 Peoplel Fully Contained Complex

Colville River Crossing Construction Campl Housed 100 Peoplel Fully Contained Complex

Page 41: Colville River Crossing · 1/17/1999  · Pipeline Alternatives Prepare Concept Level Designs Prepare Concept Level Designs Evaluate Alternatives River Crossing Alternatives ... 200