ATHLETIC PRACTICE FIELDS AND HERITAGE GARDEN PROGRAM PLAN COLORADO STATE UNIVERSITY FORT COLLINS, COLORADO July 5, 2016 Summary of Information: Name of Project: Athletic Practice Fields & Heritage Garden Program Plan Applicant: Colorado State University, Facilities Management Department Contacts: Shelly Carroll, Fred Haberecht File Location: K:\Planning\Program Plans\ Rev. Date A 7/5/2016

Transcript of Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain...

Page 1: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

ATHLETIC PRACTICE FIELDS AND HERITAGE GARDEN PROGRAM PLAN

COLORADO STATE UNIVERSITY

FORT COLLINS, COLORADO

July 5, 2016

Summary of Information: Name of Project: Athletic Practice Fields & Heritage Garden Program Plan

Applicant: Colorado State University, Facilities Management Department

Contacts: Shelly Carroll, Fred Haberecht File Location: K:\Planning\Program Plans\

Rev. Date A 7/5/2016

Page 2: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

TABLE OF CONTENTS

Page No.

1.0 EXECUTIVE SUMMARY .......................................................................................... 2

2.0 JUSTIFICATION....................................................................................................... 2 3.0 PROJECT DESCRIPTION………………………………………………………………….2

4.0 BENEFITS ................................................................................................................. 3

5.0 FACILITIES NEEDS ................................................................................................. 4

5.1 Conceptual Plan ............................................................................................. 4

5.2 Floodplain Analysis ........................................................................................ 4

5.3 LEED Goal/Sustainability ............................................................................... 4

5.4 Acquisition of Real Estate .............................................................................. 4

6.0 PROJECT BUDGET.............................................................................................................. 4

7.0 PROJECT SCHEDULE ............................................................................................. 4

8.0 RELATION TO MASTER PLAN AND OTHER PROJECTS ...................................... 4 APPENDICES APPENDIX A –Conceptual Design APPENDIX B-Flood Plain Map APPENDIX C – Project Budget

1

Page 3: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

ATHLETIC PRACTICE FIELDs AND HERITAGE GARDEN PROGRAM PLAN

COLORADO STATE UNIVERSITY FORT COLLINS, COLORADO

July 5, 2016 Prepared by:

Colorado State University Facilities Management Department

1.0 EXECUTIVE SUMMARY

This document provides planning information for new outdoor practice fields and a Heritage Garden to be constructed between W. Pitkin and W. Lake St, directly west of the new Multipurpose Stadium. The fields are expected to be 125,000 gsf and the project includes tie-in to surrounding landscape and hardscape. The Heritage Garden is envisioned as an area that will celebrate and demonstrate CSU’s agricultural heritage, as well as providing a gateway to the existing arboretum. The overall schedule to complete project is 12 months, with an estimated cost of $2.5M-$4.0M. It is anticipated to be funded from either donations or stadium contingency funds.

The proposed project is envisioned as an opportunity to improve athletic operations by constructing new football practice fields directly west of the new stadium. On game days, the fields could be used for VIP events. The current football practice field at the corner of Shields St and South Dr could then be repurposed for NCAA women’s soccer. Women’s soccer is currently being played on Student Recreation fields, and the Rec Center needs them back to accommodate growth in their program. In anticipation of this project the existing Perennial Gardens have been relocated to an area adjacent to the University Center for the Arts.

2.0 JUSTIFICATION All football operations (locker rooms, equipment, training room and staff offices) will be moved to the new stadium upon completion. The current football practice field is approximately ½ mile from the new stadium, whereas the planned facility is directly adjacent. In addition, there will be the ability to use the new fields for VIP event space on game days, and there is a need to convert the current football practice field to Women’s Soccer.

3.0 PROJECT DESCRIPTION

The practice field complex will consist of a synthetic turf area measuring approximately 340’ wide (east/west) by 385’ long (north/south). The synthetic turf area will contain one full football field with two end zones, and one half field with 2 end zones. The complex will be built to the

2

Page 4: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

west of the new multipurpose stadium, on part of an existing parking lot and the old Perennial Gardens site. The Perennial Gardens were relocated to the University Center for the Arts in anticipation of this work. The Heritage Garden will be approximately 1.2 acres, for historical agricultural crop demonstration with interpretive signage and a pavilion.

4.0 BENEFITS

The proposed project is envisioned as an opportunity to improve athletic operations by constructing new football practice fields directly west of the new stadium. On game days, the fields could be used

3

Page 5: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

for VIP events. The current football practice field at the corner of Shields St and South Dr could then be repurposed for NCAA women’s soccer. Women’s soccer is currently being played on Student Recreation fields, and the Rec Center needs them back to accommodate growth in their program. In anticipation of this project the existing Perennial Gardens have been relocated to an area adjacent to the University Center for the Arts, which is a much more visible location for the public. 5.0 FACILITIES NEEDS

5.1 Conceptual Plan A conceptual plan is included in Appendix A. The bridging documents for the Design Build procurement have been developed.

5.2 Floodplain Analysis

The project does not lie within the flood plain, as shown on the flood plain map included in Appendix B.

5.3 LEED Goal/Sustainability

Not applicable.

5.4 Acquisition of Real Estate No Land Acquisition is required. 6.0 PROJECT COST The estimated cost of the project is $2.5M-$4.0M. It is anticipated to be funded from either donations or stadium contingency funds. The project budget is included in Appendix C. 7.0 PROJECT SCHEDULE The overall schedule is estimated at 12 months. 8.0 RELATION TO MASTER PLAN AND OTHER PROJECTS The new practice fields are in accordance with the Athletics master plan and the Student Recreation master plan.

4

Page 6: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

Appendix A

Conceptual Design

Page 7: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

CSU

ARBORETUM

EXISTINGWALKWAY

EXISTING PARKING LOT

OLD CSUPERC GROUNDS

PERENNIALGARDENS

EXISTING CONDITIONS

LIM

IT O

F W

OR

K

LIM

IT O

F W

OR

K

STADIUM

LOCKERS

Page 8: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

36’

6’ ht. VINYL COATED CHAIN LINK FENCE ON WEST/NORTH SIDE

ALTERNATE CSU GARDEN

EXISTING PARKINGBAY TO BE REMOVED - APPROXIMATELY 80 SPACES LOST

235 spaces REMAIN

ADA ACCESS

PLAYER ACCESS

CSU

ARBORETUM

EXISTINGWALKWAYTO REMAIN

BASE PLAN

SYNTHETIC TURF FIELD

(2) FIELD GOAL POSTS - MOUNTED & INSTALLED PER MANUFACTURER

(2) FIELD NETSW/ POSTS - MOUNTED & INSTALLED PER MANUFACTURER

LIM

IT O

F W

OR

K

LIM

IT O

F W

OR

K

6’ HT. ORNAMENTALFENCE ON SOUTH/EAST SIDES - GATES ON WEST SIDE

STADIUM

LOCKERS

Page 9: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

36’

6’ ht. ORNAMENTAL FENCE W/ GATES ON EAST SIDE

CSU

ARBORETUM

EXISTING PARKINGBAY TO BE REMOVED - APPROXIMATELY 80 SPACES LOST

235 spaces REMAIN

50’ TALL FILMING TOWER - FOOTING & STRUCTURAL DESIGN

PER MANUFACTURER

50’ TALL FILMINGTOWER - FOOTING

& STRUCTURAL DESIGNPER MANUFACTURER

ALTERNATE CSU GARDEN

ADA ACCESS

PLAYER ACCESS

STADIUM

LOCKERS

EXISTINGWALKWAYTO REMAIN

ALTERNATE PLAN

SYNTHETIC TURF FIELD

(6) FIELD LIGHTSRE: ELECTRICAL NARRATIVE FOR SIZE INFORMATION

(4) GAME CLOCKS MOUNTED & INSTALLED - PER

MANUFACTURER

(2) FIELD GOAL POSTS - MOUNTED & INSTALLED PER MANUFACTURER

(2) FIELD NETSW/ POSTS - MOUNTED & INSTALLED PER MANUFACTURER

LIM

IT O

F W

OR

K

LIM

IT O

F W

OR

K

6’ HT. ORNAMENTALFENCE ON SOUTH/WEST SIDES - GATES ONWEST SIDE

Page 10: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

Appendix B

Flood Plain

Page 11: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

Athletic field

location

mcarroll
Oval
mcarroll
Oval
Page 12: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

Appendix C

Budget

Page 13: Colorado State University - ATHLETIC PRACTICE …...procurement have been developed. 5.2 Floodplain Analysis The project does not lie within the flood plain, as shown on the flood

Athletic Fields Project Budget

7/5/2016Estimated Costs-low Estimated Costs-high

Site Survey, Geotechnical $ 1,000 $ 1,000

Consultants - bridging docs $ 50,000 $ 50,000

Advertisements $ 500 $ 500

Project Management $ 25,000 $ 25,000

Independent Code Review/Commissioning $ 15,000 $ 15,000

Code inspection

Total Professional Services $ 91,500 $ 91,500

Sythentic turf fields $ 2,235,000 $ 3,665,000

Site Work Service/Utilities $ 33,000 $ 33,000

Construction testing $ 5,000 $ 5,000

Subtotal Construction Costs $ 2,273,000 $ 3,703,000

Fixed Equipment

Moveable Equipment

CSU Communications/AV @$9/sf $ 18,000 $ 18,000

Total Equipment and Furnishings Costs $ 18,000 $ 18,000

Relocation and temporary space $ - $ -

Total Miscellaneous Costs $ - $ -

$ 2,382,500 $ 3,812,500

Project Contingency 5% $ 119,125 $ 187,500

Total Contingency $ 117,500 $ 187,500

Total Budget 2,500,000$ 4,000,000$

Total Project Cost / sqft

COLORADO STATE UNIVERSITYFacilities Planning Design and Construction

Subtotal Project Cost

Project Budget

Professional Services

Project Contingency

Miscellaneous

Equipment & Furnishings

Construction