ATHLETIC PRACTICE FIELDS AND HERITAGE GARDEN PROGRAM PLAN
COLORADO STATE UNIVERSITY
FORT COLLINS, COLORADO
July 5, 2016
Summary of Information: Name of Project: Athletic Practice Fields & Heritage Garden Program Plan
Applicant: Colorado State University, Facilities Management Department
Contacts: Shelly Carroll, Fred Haberecht File Location: K:\Planning\Program Plans\
Rev. Date A 7/5/2016
TABLE OF CONTENTS
Page No.
1.0 EXECUTIVE SUMMARY .......................................................................................... 2
2.0 JUSTIFICATION....................................................................................................... 2 3.0 PROJECT DESCRIPTION………………………………………………………………….2
4.0 BENEFITS ................................................................................................................. 3
5.0 FACILITIES NEEDS ................................................................................................. 4
5.1 Conceptual Plan ............................................................................................. 4
5.2 Floodplain Analysis ........................................................................................ 4
5.3 LEED Goal/Sustainability ............................................................................... 4
5.4 Acquisition of Real Estate .............................................................................. 4
6.0 PROJECT BUDGET.............................................................................................................. 4
7.0 PROJECT SCHEDULE ............................................................................................. 4
8.0 RELATION TO MASTER PLAN AND OTHER PROJECTS ...................................... 4 APPENDICES APPENDIX A –Conceptual Design APPENDIX B-Flood Plain Map APPENDIX C – Project Budget
1
ATHLETIC PRACTICE FIELDs AND HERITAGE GARDEN PROGRAM PLAN
COLORADO STATE UNIVERSITY FORT COLLINS, COLORADO
July 5, 2016 Prepared by:
Colorado State University Facilities Management Department
1.0 EXECUTIVE SUMMARY
This document provides planning information for new outdoor practice fields and a Heritage Garden to be constructed between W. Pitkin and W. Lake St, directly west of the new Multipurpose Stadium. The fields are expected to be 125,000 gsf and the project includes tie-in to surrounding landscape and hardscape. The Heritage Garden is envisioned as an area that will celebrate and demonstrate CSU’s agricultural heritage, as well as providing a gateway to the existing arboretum. The overall schedule to complete project is 12 months, with an estimated cost of $2.5M-$4.0M. It is anticipated to be funded from either donations or stadium contingency funds.
The proposed project is envisioned as an opportunity to improve athletic operations by constructing new football practice fields directly west of the new stadium. On game days, the fields could be used for VIP events. The current football practice field at the corner of Shields St and South Dr could then be repurposed for NCAA women’s soccer. Women’s soccer is currently being played on Student Recreation fields, and the Rec Center needs them back to accommodate growth in their program. In anticipation of this project the existing Perennial Gardens have been relocated to an area adjacent to the University Center for the Arts.
2.0 JUSTIFICATION All football operations (locker rooms, equipment, training room and staff offices) will be moved to the new stadium upon completion. The current football practice field is approximately ½ mile from the new stadium, whereas the planned facility is directly adjacent. In addition, there will be the ability to use the new fields for VIP event space on game days, and there is a need to convert the current football practice field to Women’s Soccer.
3.0 PROJECT DESCRIPTION
The practice field complex will consist of a synthetic turf area measuring approximately 340’ wide (east/west) by 385’ long (north/south). The synthetic turf area will contain one full football field with two end zones, and one half field with 2 end zones. The complex will be built to the
2
west of the new multipurpose stadium, on part of an existing parking lot and the old Perennial Gardens site. The Perennial Gardens were relocated to the University Center for the Arts in anticipation of this work. The Heritage Garden will be approximately 1.2 acres, for historical agricultural crop demonstration with interpretive signage and a pavilion.
4.0 BENEFITS
The proposed project is envisioned as an opportunity to improve athletic operations by constructing new football practice fields directly west of the new stadium. On game days, the fields could be used
3
for VIP events. The current football practice field at the corner of Shields St and South Dr could then be repurposed for NCAA women’s soccer. Women’s soccer is currently being played on Student Recreation fields, and the Rec Center needs them back to accommodate growth in their program. In anticipation of this project the existing Perennial Gardens have been relocated to an area adjacent to the University Center for the Arts, which is a much more visible location for the public. 5.0 FACILITIES NEEDS
5.1 Conceptual Plan A conceptual plan is included in Appendix A. The bridging documents for the Design Build procurement have been developed.
5.2 Floodplain Analysis
The project does not lie within the flood plain, as shown on the flood plain map included in Appendix B.
5.3 LEED Goal/Sustainability
Not applicable.
5.4 Acquisition of Real Estate No Land Acquisition is required. 6.0 PROJECT COST The estimated cost of the project is $2.5M-$4.0M. It is anticipated to be funded from either donations or stadium contingency funds. The project budget is included in Appendix C. 7.0 PROJECT SCHEDULE The overall schedule is estimated at 12 months. 8.0 RELATION TO MASTER PLAN AND OTHER PROJECTS The new practice fields are in accordance with the Athletics master plan and the Student Recreation master plan.
4
Appendix A
Conceptual Design
CSU
ARBORETUM
EXISTINGWALKWAY
EXISTING PARKING LOT
OLD CSUPERC GROUNDS
PERENNIALGARDENS
EXISTING CONDITIONS
LIM
IT O
F W
OR
K
LIM
IT O
F W
OR
K
STADIUM
LOCKERS
36’
6’ ht. VINYL COATED CHAIN LINK FENCE ON WEST/NORTH SIDE
ALTERNATE CSU GARDEN
EXISTING PARKINGBAY TO BE REMOVED - APPROXIMATELY 80 SPACES LOST
235 spaces REMAIN
ADA ACCESS
PLAYER ACCESS
CSU
ARBORETUM
EXISTINGWALKWAYTO REMAIN
BASE PLAN
SYNTHETIC TURF FIELD
(2) FIELD GOAL POSTS - MOUNTED & INSTALLED PER MANUFACTURER
(2) FIELD NETSW/ POSTS - MOUNTED & INSTALLED PER MANUFACTURER
LIM
IT O
F W
OR
K
LIM
IT O
F W
OR
K
6’ HT. ORNAMENTALFENCE ON SOUTH/EAST SIDES - GATES ON WEST SIDE
STADIUM
LOCKERS
36’
6’ ht. ORNAMENTAL FENCE W/ GATES ON EAST SIDE
CSU
ARBORETUM
EXISTING PARKINGBAY TO BE REMOVED - APPROXIMATELY 80 SPACES LOST
235 spaces REMAIN
50’ TALL FILMING TOWER - FOOTING & STRUCTURAL DESIGN
PER MANUFACTURER
50’ TALL FILMINGTOWER - FOOTING
& STRUCTURAL DESIGNPER MANUFACTURER
ALTERNATE CSU GARDEN
ADA ACCESS
PLAYER ACCESS
STADIUM
LOCKERS
EXISTINGWALKWAYTO REMAIN
ALTERNATE PLAN
SYNTHETIC TURF FIELD
(6) FIELD LIGHTSRE: ELECTRICAL NARRATIVE FOR SIZE INFORMATION
(4) GAME CLOCKS MOUNTED & INSTALLED - PER
MANUFACTURER
(2) FIELD GOAL POSTS - MOUNTED & INSTALLED PER MANUFACTURER
(2) FIELD NETSW/ POSTS - MOUNTED & INSTALLED PER MANUFACTURER
LIM
IT O
F W
OR
K
LIM
IT O
F W
OR
K
6’ HT. ORNAMENTALFENCE ON SOUTH/WEST SIDES - GATES ONWEST SIDE
Appendix B
Flood Plain
Athletic field
location
Appendix C
Budget
Athletic Fields Project Budget
7/5/2016Estimated Costs-low Estimated Costs-high
Site Survey, Geotechnical $ 1,000 $ 1,000
Consultants - bridging docs $ 50,000 $ 50,000
Advertisements $ 500 $ 500
Project Management $ 25,000 $ 25,000
Independent Code Review/Commissioning $ 15,000 $ 15,000
Code inspection
Total Professional Services $ 91,500 $ 91,500
Sythentic turf fields $ 2,235,000 $ 3,665,000
Site Work Service/Utilities $ 33,000 $ 33,000
Construction testing $ 5,000 $ 5,000
Subtotal Construction Costs $ 2,273,000 $ 3,703,000
Fixed Equipment
Moveable Equipment
CSU Communications/AV @$9/sf $ 18,000 $ 18,000
Total Equipment and Furnishings Costs $ 18,000 $ 18,000
Relocation and temporary space $ - $ -
Total Miscellaneous Costs $ - $ -
$ 2,382,500 $ 3,812,500
Project Contingency 5% $ 119,125 $ 187,500
Total Contingency $ 117,500 $ 187,500
Total Budget 2,500,000$ 4,000,000$
Total Project Cost / sqft
COLORADO STATE UNIVERSITYFacilities Planning Design and Construction
Subtotal Project Cost
Project Budget
Professional Services
Project Contingency
Miscellaneous
Equipment & Furnishings
Construction