24
Easterly CSO Program Collinwood & Nottingham Villages Development Corporation, July 2013 Northeast Ohio Regional Sewer District

Transcript of Collinwood Nottingham Dev Corp 072313

Page 1: Collinwood Nottingham Dev Corp 072313

Easterly CSO ProgramCollinwood & Nottingham Villages Development Corporation, July 2013

Northeast Ohio Regional Sewer District

Easterly CSO ProgramCollinwood & Nottingham Villages Development Corporation, July 2013

Northeast Ohio Regional Sewer District

Page 2: Collinwood Nottingham Dev Corp 072313

Who we are…

• Formed 1972 by Court Order• Political subdivision of Ohio

– Governed by ORC 6119• One million customers

– 62 communities across four counties• 90+ billion gallons wastewater

treated each year

Page 3: Collinwood Nottingham Dev Corp 072313

…and what we do.

• Wastewater treatment plants• Interceptor sewers • Combined sewer overflow control• Regional stormwater

management• Stream monitoring and

industrial surveillance

Page 4: Collinwood Nottingham Dev Corp 072313
Page 5: Collinwood Nottingham Dev Corp 072313

Easterly CSO Facilities Plan

Page 6: Collinwood Nottingham Dev Corp 072313

25 years, $3 billion

Seven CSO Tunnel Systems– 21 total miles– 17 to 24 feet wide– 100 to 200 feet

underground

Page 7: Collinwood Nottingham Dev Corp 072313

Euclid Creek Tunnel (ECT) Project Overview

• Length: 18,050’ (3.4 miles)

• Diameter: 24’ finished• Avg. Depth: 200-ft• 4 Flow Drop Structures• Near Surface:

– Over 5,000 LF of Near Surface

Sewers (36” to 90” dia.)

– 30+ Structures

Page 8: Collinwood Nottingham Dev Corp 072313

Testing in China

Page 9: Collinwood Nottingham Dev Corp 072313

TBM Assembly

Page 10: Collinwood Nottingham Dev Corp 072313

Precast Tunnel Segments

Page 11: Collinwood Nottingham Dev Corp 072313

Tunnel Dewatering Pump Station

Page 12: Collinwood Nottingham Dev Corp 072313

TDPS Tunnel & Piping

Page 13: Collinwood Nottingham Dev Corp 072313

TDPS When Complete

Page 14: Collinwood Nottingham Dev Corp 072313

ECT Shaft 5 (ECT-5)

Page 15: Collinwood Nottingham Dev Corp 072313

ECT-5 Site Plan & Profile

Page 16: Collinwood Nottingham Dev Corp 072313

ECT-5 Shaft Excavation

Page 17: Collinwood Nottingham Dev Corp 072313

ECT-5 Shaft Excavation

Page 18: Collinwood Nottingham Dev Corp 072313

ECT-5 Shaft Final Lining ECT-5 Final Lining

Page 19: Collinwood Nottingham Dev Corp 072313

ECT-5-4 Temporary Support of Excavation

ECT-5.4 Shaft Excavation

Page 20: Collinwood Nottingham Dev Corp 072313

ECT-5.4 Final Lining

Page 21: Collinwood Nottingham Dev Corp 072313

Construction Detour

Page 22: Collinwood Nottingham Dev Corp 072313

ECT Community Meeting

Tuesday, September 10, 20136:00 p.m.

Cleveland Public Library, Memorial-Nottingham Branch17109 Lakeshore Boulevard

Page 23: Collinwood Nottingham Dev Corp 072313

Contact Info:

Doug GabrielEasterly CSO Construction Program

ManagerField Office: (216) 268-5469

@neorsd, @WallyWaterdrop facebook.com/yoursewerdistrict

euclidcreek.blogspot.com

Page 24: Collinwood Nottingham Dev Corp 072313

Easterly CSO ProgramCollinwood & Nottingham Villages Development Corporation, July 2013

Northeast Ohio Regional Sewer District

Easterly CSO ProgramCollinwood & Nottingham Villages Development Corporation, July 2013

Northeast Ohio Regional Sewer District