Collimator Setup MD Out of the original 6 hours for collimator setup, only ~3.5 hours were available. Pattern recognition of optimal loss spikes: worked well, only a single mis-classification due to delays caused by excessive data logging. To be used as a standard technique in the next setups . Automatic identification of the collimator aligned to the beam during parallel setup: did not work due to a difference in thread behaviour between Windows (development) and Linux (deployment) environments, debugged during technical stop. Could be tested on collimation setup after power cut. OK . Managed to setup all IR3 collimators in B2 & B1 with ~15 mins / coll and ~6 mins / coll (without repeating reference TCP setup) respectively . The change in beam centres compared to the setup of 08/03/2011 is < 135 µm, except for the TCSG.5L3.B1 (243 µm difference). Gianluca Valentino A. Rossi on behalf of the collimation team

description

Collimator Setup MD. A. Rossi on behalf of the collimation team. Out of the original 6 hours for collimator setup, only ~3.5 hours were available. - PowerPoint PPT Presentation

Transcript of Collimator Setup MD

Page 1: Collimator Setup MD

Collimator Setup MD Out of the original 6 hours for collimator setup, only ~3.5 hours were

available. Pattern recognition of optimal loss spikes: worked well, only a

single mis-classification due to delays caused by excessive data logging. To be used as a standard technique in the next setups.

Automatic identification of the collimator aligned to the beam during parallel setup: did not work due to a difference in thread behaviour between Windows (development) and Linux (deployment) environments, debugged during technical stop. Could be tested on collimation setup after power cut. OK.

Managed to setup all IR3 collimators in B2 & B1 with ~15 mins / coll and ~6 mins / coll (without repeating reference TCP setup) respectively .

The change in beam centres compared to the setup of 08/03/2011 is < 135 µm, except for the TCSG.5L3.B1 (243 µm difference).

Gianluca ValentinoA. Rossi on behalf of the collimation team

Page 2: Collimator Setup MD

IR3 combined cleaning MD Scope: Test cleaning efficiency when using IR3 for both

momentum and betatron cleaning. IR3 combined cleaning could be adopted if required for R2E. Could reduce setup time. Would reduce impedance.

Measurements performed: Loss maps on horizontal plane, 3.5TeV with 1 nominal bunch, injection optics . V collimators in IR7 left in since no vertical collimators in IR3. Momentum loss maps could not be performed: beam dumped due to unmask-

able BLM.

2A. Rossi on behalf of the collimation team

IR3 IR7TCP(H) 5.7 s TCP(V) 5.7 s TCT (H,V) 26 s

TCS (H) 6.7 s TCS (V) 8.5 s TCL, TCLI, TDI open

TCLA (H,S) 10 s TCLA (V) 17.7 s

TCP(H,S) 18 s

TCS (H,S) 21 s

TCLA (H,S) 24 s

Page 3: Collimator Setup MD

Results for IR3 combined cleaning, H, injection optics

3

B2Setup apertures

TCP3 (H) 5.7 s TCS3 (H,S) 6.7 s TCLA3 (H,V) 10 s TCP7 (H,S) 18 s TCS7 (H,S) 21 s TCLA7 (H,S) 24 s TCP7 (V) 5.7 s TCS7 (V) 8.5 s TCLA7 (V) 17.7

s TCT (H,V) 26 s TCL, TCLI, TDI open

Main losses on TCP.6R3.B2 and TCSG.A5L3.B2 → Hierarchy or showers? (TCP3 was tested to be the primary collimator prior measurements)

High losses at TCTVs right of IR1 (~1%) and IR8 (~2.6%)

A. Rossi on behalf of the collimation team

~2e-2

~1e-2

~1e-1

~1e-2

Page 4: Collimator Setup MD

SixTrack simulations with collimators as thought to be

4A. Rossi

B2

TCP3 (H) 5.7 s TCS3 (H,S) 6.7 s TCLA3 (H,V) 10 s TCP7 (H,S) 18 s TCS7 (H,S) 21 s TCLA7 (H,S) 24 s TCP7 (V) 5.7 s TCS7 (V) 8.5 s TCLA7 (V) 17.7

s TCT (H,V) 26 s TCL, TCLI, TDI open

SixTrack simulations with H sheet beam hitting TCP3: cannot reproduce IR3 loss shapes, nor high losses in IR1/8, nor IR6 and IR7 level

Page 5: Collimator Setup MD

SixTrack simulations

5

TCP3 (H) 5.7 s TCSG.A5L3.B2 5.7 s TCS3 (H,S) 6.7 s TCLA3 (H,V) 10 s TCP7 (H,S) 18 s TCS7 (H,S) 21 s TCLA7 (H,S) 24 s TCP7 (V) 5.7 s TCS7 (V) 8.5 s TCLA7 (V) 17.7

s TCT (H,V) 26 s TCL, TCLI, TDI open

A. Rossi

Sum of results: sheet beam hitting TCP.6R3.B2 and TCSG.A5L3.B2

~1e-1

Page 6: Collimator Setup MD

Summary and future work Results:

After standard beam based setup in IR3. H betatron loss maps dumped both beams. Measured loss map pattern different from usual:

Main losses on TCP.6R3.B2 and TCSG.A5L3.B2 → Hierarchy or showers? But prior measurements TCP3 was moved in to verify it was the primary collimator.

High losses at TCTVs right of IR1 (~1%) and IR8 (~2.6%) Simulated loss map pattern could partly be reproduced by

overlapping results from “hierarchy breakdown” and sheet beam hitting both collimators with highest losses.

Further study to interpret/reproduce data. After analysis (simulations also with FLUKA to include

showers) measurements should be repeated to validate scheme.

6A. Rossi on behalf of the collimation team

Page 7: Collimator Setup MD

IR3 combined betatron / momentum cleaning

7

What we would have (+ TCLA’s)

What we could test (no vertical collimators in IR3)

10 s 6.7 s 5.7 s

Less passive absorber than in IR7

TCHSH.6L3.

B1

TCSM.5L3.B1

TCSM.4R3.B

1

TCSM.

A5R3.

B1 TCSM.

B5R3.

B1

TCP.

A6L

3.B

1 TCP.6L3.B1 TC

SG.

A5L

3.B

1 TCSG.5L3.B1 TC

SG.

B4R

3.B

1 TCSG.4R3.B1

TCSG.A5R3.B1 TC

SG.

C5R

3.B

1 TCSG.B5R3.B1 TC

SG.

D5R

3.B

1

Beam 1

Symmetric for Beam 2

TCSG.5R3.B2

TCP.6R3.B2

TCSG.4L3.B2

Beam 2TCSG.

B5L3.B2TCSG.

A5L3.B2TCLA.A5L

3.B2TCLA.

7L3.B2TCLA.6L3.B2

TCLA.B5L3.B2

A. Rossi on behalf of the collimation team