  • 7/30/2019 Collapsed Structures

    1/4

    0

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    Responding to Emergencies - arriving and getting to work Getting to work Operational imperative

    The uncontrolled situation

    Manual handling

    Remote locations2 2 4 Dynamic risk management procedure

    Effective command and control systems Provision

    Responding to Emergencies - arriving and getting towork Getting to work Operational imperative

    The uncontrolled situation

    Manual handling

    Remote locations2 2 4 Dynamic risk management procedure Effective command and control systems Provision

  • 7/30/2019 Collapsed Structures

    2/4

    Exposure

    ActivityHazard

    IdentifiedRisk

    Persons who

    may be

    Exposed:

    Likelihood Severity

    Overall

    Risk

    Rating

    Likelihood Severity

    Overall

    Risk

    Rating

    Rescues - from

    collapsed

    structure

    Working in and

    around

    collapsed

    buildings/

    structures

    Slips, trips and

    falls on the level

    Further collapse

    Danger from

    falling objects

    Wholetime

    Retained

    Volunteer/Civil

    Defence

    Non Service

    Personnel

    2 3 6

    A safety officer should be

    appointed to watch for falling

    debris and signs of further

    collapse.

    Slip and trip hazards should

    be removed or reduced if

    practical as soon as possibleafter arrival at the incident.

    All personnel receive

    information and instruction on

    under foot conditions to be

    encountered with association

    operations.

    All personnel should be made

    aware of hazards associated

    with collapsed buildings and

    structures.

    All personnel to have suitableP.P.E. e.g. full fire fighting kit,

    goggles, gloves and

    helmet/hard hat.

    All personnel are under full

    supervision

    Unsupported walls should

    shored into position and not

    pushed back to perpendicular.

    1 3 3

    Assessment By:

    Responsible

    Person

    Countersigned:

    Existing

    Controls

    Risk Rating

    Proposed Actions/Controls

    (Long/medium/short term)

    After Risk Reduction

    Assessment Date: REF NO: R05Location: Letterkenny FS - DL11

    Rescues - Collapsed Structures

  • 7/30/2019 Collapsed Structures

    3/4

    Exposure

    ActivityHazard

    IdentifiedRisk

    Persons who

    may be

    Exposed:

    Likelihood Severity

    Overall

    Risk

    Rating

    Likelihood Severity

    Overall

    Risk

    Rating

    Assessment By:

    Responsible

    Person

    Countersigned:

    Existing

    Controls

    Risk Rating

    Proposed Actions/Controls

    (Long/medium/short term)

    After Risk Reduction

    Assessment Date: REF NO: R05Location: Letterkenny FS - DL11

    Rescues - Collapsed Structures

    Rescues - from

    collapsed

    structure

    Rescues from

    collapsed

    buildings/

    structures

    Slips, trips and

    falls on the level.

    Further collapse.

    Danger from

    falling debris.

    Rescuers

    becoming fatigued

    if operation

    protracted.

    Possible contact

    with body fluids.

    Working in

    confined spaces

    Wholetime

    Retained

    Volunteer/Civil

    Defence

    Non Service

    Personnel

    2 3 6

    Appointed safety officers to

    warn crews of signs of further

    collapse and falling debris.

    Ensure all personnel F.B. or

    otherwise are aware of

    evacuation signal. All personnel receive

    information and instruction on

    conditions with associated

    operations.

    Suitable P.P.E. to be worn by

    all personnel including, hard

    hat, protective footwear,

    goggles, gloves and issued with

    disposable dust masks.

    All personnel under constant

    supervision. Equipment not in use to be

    returned to the equipment pool

    as soon as possible.

    Rotation of rescue teams and

    safety officers.

    1 3 3

  • 7/30/2019 Collapsed Structures

    4/4

    Exposure

    ActivityHazard

    IdentifiedRisk

    Persons who

    may be

    Exposed:

    Likelihood Severity

    Overall

    Risk

    Rating

    Likelihood Severity

    Overall

    Risk

    Rating

    Assessment By:

    Responsible

    Person

    Countersigned:

    Existing

    Controls

    Risk Rating

    Proposed Actions/Controls

    (Long/medium/short term)

    After Risk Reduction

    Assessment Date: REF NO: R05Location: Letterkenny FS - DL11

    Rescues - Collapsed Structures

    Rescues - from

    collapsed

    structure

    Rescues from

    collapsed

    buildings/

    structures

    (Contd.)

    Serious injury

    Wholetime Retained

    Volunteer/Civil

    Defence

    Non Service

    Personnel

    2 4 8

    Have ambulance mobilised or

    in attendance

    Any member of rescue teams

    should be made aware of

    hazards associated with

    collapsed buildings and

    structures.

    Emergency teams standing by

    for immediate deployment.

    Isolation of services.

    Establish inner cordon.

    Tunnels and trenches should

    be braced to prevent collapse.

    Prevent vehicular movement

    around the scene of operations.

    Welfare of personnel food,

    drink, shelter etc

    1 4 4