Talking Collaboration at CERN for Challenge Based Innovation Students
Collaboration Meeting CERN, 6-10 Feb 2012 Collaboration Meeting CERN, 6-10 Feb 2012 Agustín...
-
Upload
aleesha-gibbs -
Category
Documents
-
view
216 -
download
2
Transcript of Collaboration Meeting CERN, 6-10 Feb 2012 Collaboration Meeting CERN, 6-10 Feb 2012 Agustín...
Update on time calibration with optical beacons
Collaboration MeetingCERN, 6-10 Feb 2012
Agustín Sánchez LosaIFIC (CSIC – Universitat de València)
Outline
• Reminder of the time calibration with OBs• Time calibrations performed since Moscow
meeting– Intraline calibration: T0s
• #9 (after HV Jun’11)• #10 (after HV Dec’11)• LED-OB 1263 (L09F21): Chronicle of a Death Foretold
– Interline calibration: Time offsets• #8 (after L6 & L9 reconnection and HV Nov’10)• #9 (after HV Jun’11)
• To-Do List6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 2
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 3
Time calibration recipe:– Flash various OMs at the same time by an OB– Plot the distribution of hit arrival times for each ARS– Fit such distribution with a Gauss@Exponential function– Determine Tpeak , the time of the function peak
– Plot Tpeak vs distance– Deviations from the straight line fit will be used as corrections to the T0s
F 2
F 3
F 4
F 5
F 6
F 7
F 8
F 9
F 10
F 1
Reminder of the time calibration
waterOBOM c
OMOBdttt
),(
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 4
LED
LED
Laser
Reminder of the time calibration
• T0 in the same line• LED OB• Early-photon region
Intraline calibration
• time offsets between lines• Laser OB• Photo-electron level region
Interline calibration
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
• Scheme of the automatic calibration:
– Human intervention needed at the end of the process to check the output and the most problematic corrections in case of T0s calibration
run file & calibration
(time & alignment)
Fill time OB-OM
histogramsTpeak
T0s
Time offsetsProcessing run Autobinning
Intraline
Interline
Reminder of the time calibration
5
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
IntralineT0s in the same line by means of the
LED OBs
6
7
T0s#1
5 Lines#2
10 Lines#3
12 Lines#4HV #5 #6
L10-L12+offsetsG/2 G/4 #7
HV#8
L6-L9+HV#9HV
#10HV
29/Jan/2007 07/Dec/2007 30/May/2008 13/Aug/2009 07/Nov/2009 13/Nov/2009 22/Jun/2010 23/Jun/2010 13/Jul/2010 06/Nov/2010 29/Jun/2011 12/Dec/2011
~10 months ~7 months ~15,5 months ~3 months ~5 days ~8 months - - ~4,5 months ~7 months ~8 months ~4,5 months
10.746.202(NO OFFSETS)
16.703.026(NO OFFSETS)
16.722.429(NO OFFSETS)
35.045.036(NO OFFSETS)
36.934.336(NO OFFSETS)
37.347.048(NO OFFSETS)
60.460.029(NO OFFSETS)
60.460.030(NO OFFSETS)
53.408.684(NO OFFSETS)
59.241.588(NO OFFSETS)
65.091.301(NO OFFSETS)
94.617.161(NO OFFSETS)
54.497.692(mix PACO-AART)
54.497.693 (mix PACO-AART)
54.497.694 (mix PACO-AART)
55.212.410 (mix PACO-AART)
59.246.765 (#6)
59.223.340 (#6)
61.464.136 (#7)
61.464.151 (#7)
60.410.605 (#7)
61.419.526 (#8pre)
60.419.546 (BAD PATCHED)
60.419.546 (BAD PATCHED)
60.459.844 (PATCHED)
60.459.865 (PATCHED)
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
Intraline: T0s tables in the DB• Two new Intraline calibrations (T0s without offsets):
– #9 (after HV Jun’11)– #10 (after HV Dec’11)
#1 #2 #3 #5#4 #6 #7 #8
5 Lines 10 Lines 12 Lines HV L10-L12+offsets HV L6-L9+HV
G/N
HVHV
#9 #10
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
Intraline (#9): new T0s for #9 period (After HV Jun'11)
• Intraline calibration performed with:– 24 standard LED-OB calibration runs of 29/06/2011– “2011:V1.0” online calibration
• LED-OBs not available: L09S21, L10S21, L11S02, L11S21, L12S15
• More info available at:http://ific.uv.es/~agusanlo/calibrations/intratical_9/
8
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
Intraline (#9): new T0s for #9 period (After HV Jun'11)
• Corrections summary:
– 526 ARSs couldn't be corrected (no data or dead channel) – 8 ARSs couldn't be corrected (not suitable for time calibration) – 1236 ARSs were corrected: (70%)
• 1023 less than 1ns (83% of corrected)• 141 between 1ns and 2ns (11% of corrected)• 60 between 2ns and 5ns (5% of corrected)• 12 more than 5ns (1% of corrected)
– And 30 ARSs are in a pair corrected more than 1ns: (2% of corrected)• 26 less than 2ns• 4 between 2ns and 5ns• 0 more than 5ns
– 6 were fitted and corrected by hand (0.4%)9
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
Intraline (#9): new T0s for #9 period (After HV Jun'11)
• 8 ARS were not corrected: they are not suitable for time calibration
10
(L03 F14 ARS2)
(L03 F14 ARS3)
L07 F13 ARS4
(L07 F13 ARS5)
(L11 F11 ARS4)
(L11 F11 ARS5)time (ns)
N
N
time (ns)
N
time (ns)
L08 F15 ARS1 L07 F17 ARS4
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 11
Intraline Example of sections 1-4 for line 1
(2 runs of 29/06/2011)
Section 2Floor 11-16 (11-17)
Section 1Floor 4-10
Section 3Floor 17-22 (17-23)
Section 4Floor 23-25
#9
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
Intraline Corrections and Clock-Phases
72 out of 1236 have required corrections
larger than 2ns:6 %
Clockphases stable below
~0.1ns
#9
12
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
Intraline (#10): new T0s for #10 period (After HV Dec'11)
• Intraline calibration performed with:– 24 standard LED-OB calibration runs of 16/01/2012– “2011:V4.0” online calibration
• LED-OBs not available: L09S21, L10S21, L11S02, L11S21, L12S15
• More info available at:http://ific.uv.es/~agusanlo/calibrations/intratical_10/
13
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
Intraline (#10): new T0s for #10 period (After HV Dec'11)
• Corrections summary:
– 516 ARSs couldn't be corrected (no data or dead channel) – 9 ARSs couldn't be corrected (not suitable for time calibration) – 1245 ARSs were corrected: (70%)
• 1094 less than 1ns (88% of corrected)• 105 between 1ns and 2ns (8% of corrected)• 38 between 2ns and 5ns (3% of corrected)• 8 more than 5ns (1% of corrected)
– And 20 ARSs are in a pair corrected more than 1ns: (2% of corrected)• 14 less than 2ns• 6 between 2ns and 5ns• 0 more than 5ns
– 7 were fitted and corrected by hand (0.4%)14
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
Intraline (#10): new T0s for #10 period (After HV Dec'11)
• 8 ARS were not corrected: they are not suitable for time calibration
15
L02 F10 ARS2
(L02 F10 ARS3)
(L03 F14 ARS2)
(L03 F14 ARS3)
(L07 F13 ARS4)
(L07 F13 ARS5)time (ns)
N N
time (ns)
L11 F11 ARS4
Unbalanced section #4 of line 5
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 16
Intraline Example of sections 1-4 for line 1
(2 runs of 16/01/2012)
Section 2Floor 11-16 (11-17)
Section 1Floor 4-10
Section 3Floor 17-22 (17-23)
Section 4Floor 23-25
#10
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
Intraline Corrections and Clock-Phases
46 out of 1245 have required corrections
larger than 2ns:4 %
Clockphases stable below
~0.1ns
#10
17
Intraline LED-OB 1263 (L09F21): Chronicle of a Death Foretold
L09F21 LED-OB was a noisy OB:• the trigger in OB PMT was given by clock signal
noise (thanks Paco and Ciro)• flash time was given ~75ns before it should• “time difference signal” shifted close to the end
of the time window• Decided to add -75ns to the OB t0 for practical
reasons
ADC ~48ch
(~75ns)
time (ch)
V (c
h)
MAX_TRIG_TH0 ~255mV → ADC ~186ch
time (ns)
N
CERN’11
15/12/2010
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 18
L09 S23 ARS0
15/12/2010time (ns)
N
01/02/2011time (ns)
N
07/02/2011time (ns)
N
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 19
-75ns -75ns -75ns
L09 S23 ARS0
Intraline LED-OB 1263 (L09F21): Chronicle of a Death Foretold
time (ns)
N
29/06/2011time (ns)
N
+75ns
-75ns
16/01/2012
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
InterlineTime offsets between lines by means
of the Laser OB
20
21
T0s#1
5 Lines#2
10 Lines#3
12 Lines#4HV #5 #6
L10-L12+offsetsG/2 G/4 #7
HV#8
L6-L9+HV#9HV
#10HV
29/Jan/2007 07/Dec/2007 30/May/2008 13/Aug/2009 07/Nov/2009 13/Nov/2009 22/Jun/2010 23/Jun/2010 13/Jul/2010 06/Nov/2010 29/Jun/2011 12/Dec/2011
~10 months ~7 months ~15,5 months ~3 months ~5 days ~8 months - - ~4,5 months ~7 months ~8 months ~4,5 months
10.746.202(NO OFFSETS)
16.703.026(NO OFFSETS)
16.722.429(NO OFFSETS)
35.045.036(NO OFFSETS)
36.934.336(NO OFFSETS)
37.347.048(NO OFFSETS)
60.460.029(NO OFFSETS)
60.460.030(NO OFFSETS)
53.408.684(NO OFFSETS)
59.241.588(NO OFFSETS)
65.091.301(NO OFFSETS)
94.617.161(NO OFFSETS)
54.497.692(mix PACO-AART)
54.497.693 (mix PACO-AART)
54.497.694 (mix PACO-AART)
55.212.410 (mix PACO-AART)
59.246.765 (#6)
59.223.340 (#6)
61.464.136 (#7)
61.464.151 (#7)
60.410.605 (#7)
61.419.526 (#8pre)
61.419.526 (#9)
60.419.546 (BAD PATCHED)
60.419.546 (BAD PATCHED)
94.288.297 (#8)
60.459.844 (PATCHED)
60.459.865 (PATCHED)
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
Interline: T0s tables in the DB• Two new Interline calibration (time offsets between lines):
– #8 (after L6 & L9 reconnection and HV Nov’10) and #9 (after HV Jun’11)– Completed all the periods until end 2011!
#1 #2 #3 #5#4 #6 #7 #8
5 Lines 10 Lines 12 Lines HV L10-L12+offsets HV L6-L9+HV
G/N
HVHV
#9 #10
Lines
#210 Lines
#312 Lines
#4HV
#5
#6L10-L12+offsets
#7HV
#8L6+L9+HV
#9HV
07/Dec/07 30/May/08 13/Aug/09 07/Nov/09 13/Nov/09 13/Jul/10 06/Nov/10 29/Jun/11
#2 #3A #3B #3C #4 -#6
(DIRTY)#6 #7 #8pre #8 #9
12 runs(25/02/08 → 12/05/08)
1 run(02/06/08)
10 runs(09/09/08 → 22/12/08)
29 runs(23/12/08
→ 12/08/09)
10 runs(01/09/09
→ 02/11/09)
-
26 runs(11/12/09
→ 12/07/10)
13 runs(11/12/09
→ 08/03/10)
14 runs(19/07/10
→ 25/10/10)
4 runs(24/11/10
→ 27/12/10)
26 runs(24/11/10
→ 03/06/11)
25 runs(19/06/11
→ 12/12/11)
PACO(0.992)
auto(0.992)
auto(0.994)
Not DonePACO(0.992)
AART(0.992)
AVERAGEPaco-Aart
auto(0.992)
auto(0.994)
DIFF(0.994-0.992)
auto auto - auto auto auto auto auto auto
1 -2,1 -2,1 -1,5 - -3,0 -2,28 -2,83 -3,0 -3,0 0,0 -3,0 -2,9 - -2,7 -2,7 -3,0 -2,3 -2,4 -2,62 -1,9 -2,1 -1,9 - -2,6 -2,12 -2,55 -2,6 -2,6 0,0 -2,6 -2,8 - -2,9 -3,0 -3,0 -2,9 -2,9 -3,03 0,8 0,5 0,9 - 0,3 -0,63 -0,36 0,1 0,1 0,0 -0,3 0,1 - 0,1 0,1 0,3 0,5 0,5 0,44 - - - - -1,7 -2,56 -2,32 -1,4 -1,5 -0,1 -1,6 -1,7 - -1,5 -1,6 -2,1 -2,1 -2,1 -2,05 -2,4 -2,2 -2,2 - -3,6 -3,31 -3,65 -3,5 -3,5 0,0 -3,5 -3,5 - -4,0 -4,0 -3,4 -3,2 -3,2 -3,46 -0,9 -0,9 -0,8 - -0,1 -1,10 -0,79 -0,5 -0,5 0,0 -0,3 0,3 - - - - -0,6 -0,3 -0,37 -0,2 -0,3 0,1 - -0,2 0,33 -0,13 -0,4 -0,4 0,0 -0,5 -0,8 - -0,7 -0,7 -0,7 -0,3 -0,5 -0,18 7,1 7,5 7,6 - 7,5 5,33 6,22 7,8 7,9 0,1 7,9 7,2 - 8,1 8,0 7,8 6,8 6,9 7,09 1,0 0,8 0,9 - 0,3 0.04 -0,02 0,0 0,0 0,0 0,2 - - - - - -0,8 -0,8 -1,0
10 -1,6 -1,3 -1,2 - -0,8 -1,00 -0,09 -0,9 -0,7 0,2 - - - -1,3 -1,2 -0,5 -0,3 -0,3 -0,211 - - - - 5,4 3,97 4,49 5,2 3,5 -1,7 3,6 4,3 - 3,9 4,0 4,1 3,9 4,1 4,412 - - - - 3,1 3,31 3,01 3,0 0,7 -2,3 0,4 - - 1,1 1,1 0,3 1,2 0,9 1,0
Mean
-0,02 -0,01 0,21 - 0,38 -0,01 0,08 0,32 0,00 -0,32 0,03 0,02 - 0,01 0,00 -0,02 -0,01 -0,01 0,00
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 22
Interline
DON’TPANIC
Line 19/07/2010 25/10/2010
03/11/2010 20/06/2011
29/06/2011 12/12/2011
1 - 3.0 ns - 2.4 ns - 2.6 ns2 - 3.0 ns - 2.9 ns - 3.0 ns3 + 0.3 ns + 0.5 ns + 0.4 ns4 - 2.1 ns - 2.1 ns - 2.0 ns5 - 3.4 ns - 3.2 ns - 3.4 ns6 ----- - 0.3 ns - 0.3 ns7 - 0.7 ns - 0.5 ns - 0.1 ns8 + 7.8 ns + 6.9 ns + 7.0 ns9 ----- - 0.8 ns - 1.0 ns
10 - 0.5 ns - 0.3 ns - 0.2 ns11 + 4.1 ns + 4.1 ns + 4.4 ns12 + 0.3 ns + 0.9 ns + 1.0 ns
#7 #8 #9
Interline
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 23
NEWNEW
Line 1
Line 2
L1 L2L3 L4 L6L5L7 L8L10L9
L11L12
L1 L2L3 L4 L6L5L7 L8L10L9
L11L12
Example of interline(from 03/11/2010 to 20/06/2011)#8
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 24
Line 1
Line 2
L1 L2L3 L4 L6L5L7 L8L10L9
L11L12
L1 L2L3 L4 L6L5L7 L8L10L9
L11L12
Example of interline(from 29/06/2011 to 12/12/2011)#9
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 25
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 26
Interline: Best Laser vs Official offsets
Official offset
Validity period
Laser average ±1ns
Laser offset period
Laser offset RMS
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 27
Interline: Best Laser vs Official offsets
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 28
Interline: Best Laser vs Official offsets
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting 29
Interline: Best Laser vs Official offsets
6-10 Feb 2012 Agustín Sánchez Losa – CERN Collaboration Meeting
To-Do List
• Intraline calibration by OB:– Compute intermediate T0s, starting for the ones from 2011– Recompute old T0s with updated TVCs and study the impact of using ones
or another– Research & Improvement on intraline calibration: Calibrate the first floors
of each line, study the impact of a calibration with independent sections, Study unstable PMTs since HV tuning in Summer'10, etc.
• Interline calibration by OB:– Research & Improvement on interline calibration: Keep studying time
offsets evolution along long periods, use LED-Beacons as a standard cross-check for the time offsets, impact of the noise in the line offset measurements, etc.
30