CoilCommSM
-
2015 HALLIBURTON. ALL RIGHTS RESERVED. 2
DID YOU KNOW WHEN OBJECTS GO DOWN UNEXPECTEDLY,
INJURIES GO UP EXPONENTIALLY.
The Halliburton 10 to Zero Life Rules are a compilation of basic rules
that all Halliburton employees know and live by. These are key components
for identifying and managing the hazards in our business.
In fact, objects falling on people, (often from heights) do lead to
serious injuries.
We can all decrease falling object incidents by increasing falling
object awareness. Institute procedures for inspecting equipment and
fixtures, and securing tools and loose objects. Establish restricted
areas and post signs under work at height. Institute Stop Work
Authority if theres any doubt about safety. Eliminating injuries from dropped objects should always be a high priority.
At Halliburton, solving customer challenges is second only to keeping
everyone safe and healthy. You can find more safety tips at
www.halliburton.com/HSE
Dropped Objects
2014 Halliburton. All rights reserved.
-
2015 HALLIBURTON. ALL RIGHTS RESERVED. 3
CoilCommSM Services
Content:
Real -Time Service
System Components
Distributed Temperature Sensing (DTS)
Distributed Acoustic Sensing (DAS)
Type of Services
-
2015 HALLIBURTON. ALL RIGHTS RESERVED. 4
Real Time CT Fiber Optics Solution
A real time, non intrusive Coiled Tubing technology to help maximize well performance and intervention success rate
BHA Measures:
Internal and External Pressure
Downhole Temperature
CCL (Depth Co-relation)
Distributed Temperature Sensing
(DTS)
Distributed Acoustic Sensing (DAS)
CoilCommSM Services
-
2015 HALLIBURTON. ALL RIGHTS RESERVED. 5
6 Fibers installed in tube-in-tube concentric housing, 4mm
Minimum cross sectional area reduction
Acid, Solvent and Abrasive Sand resistance
Ball Drop Capability
Negligible added weight
CoilCommSM Services
-
2015 HALLIBURTON. ALL RIGHTS RESERVED. 6
Real Time Measurements:
Internal & External Pressure
Downhole Temperature
CCL (Depth Corelation)
Specifications:
2-1/8 O.D; 11ft long
2-1/4 O.D; 11ft long
3-3/8 O.D; 14ft long
Min. ball size 5/8
350 F
15K psi
CoilCommSM Services
-
2015 HALLIBURTON. ALL RIGHTS RESERVED. 7
CoilComm BHA Specifications:
CoilCommSM Services
BHA Specifications
O.D 2.125 2.25 3.375
I.D. 0.65 0.65 1.25
Length 11ft 11ft 14ft
Max Ball drop size 5/8 5/8 1
Pressure Rating 10,000 psi 15,000 psi 15,000psi
Temperature Rating 350 F 350 F 350 F
Max Pump Rate (Slick
Fluid)
2 BPM 2 BPM 7 BPM
Max Pump Rate
(Abrasive Fluid)
0.9 BPM 0.9 BPM 3 BPM
-
2015 HALLIBURTON. ALL RIGHTS RESERVED. 8
Acquisition Software:
IWI user friendly software for best data visualization and handling
Depth co-relation interface window
One single Software Program to support the whole job
Facilitate immediate monitoring by CT operator
Real time availability of Acquisition data in Client Offices worldwide
CoilCommSM Services
-
2015 HALLIBURTON. ALL RIGHTS RESERVED. 9
Distributed Temperature Sensing (DTS):
Fiber optics-based sensing capability
DTS allows tracking of temperature changes along the entire length of Coiled Tubing
It can be used to analyze distribution of flow:
During an acid job
Hot/Cold slugs
Gas entry points
Cross- flows
CoilCommSM Services
-
2015 HALLIBURTON. ALL RIGHTS RESERVED. 10
Distributed Acoustic Sensing (DAS):
Frac monitoring, flow in/out of perforations
Production monitoring
Completion evaluation
Seismic, vertical seismic profiling, surface seismic, microseismic
CoilCommSM Services
-
2014 HALLIBURTON. ALL RIGHTS RESERVED. 11
Stimulation Analysis & Optimization using DAS
-
2014 HALLIBURTON. ALL RIGHTS RESERVED. 12
Holley et al;
SPE 136565
VIDEO
Microseismic & Fiber Optics Plug & Perf - Barnett
-
2014 HALLIBURTON. ALL RIGHTS RESERVED. 13
CCL Pressure Gauge Temp Gauge
Perforation Cleanup Tool
Fiber Cable Coiled Tubing
Downhole Tool
CT Unit with FO
Cable
Tool Description
-
2014 HALLIBURTON. ALL RIGHTS RESERVED. 14
8 Open Intervals over 417m.
Naturally Fractured Reservoir
12 Previous Stimulations
Fluid Placement Uncertainty
Incremental Production with
previous Stimulations ~195 BPD
v v
vv
v
Obstruction
6682m
417 m
Coilcomm Case 1 - Bricol
-
2014 HALLIBURTON. ALL RIGHTS RESERVED. 15
Temperature profiles almost parallel to base temperature, most treatment fluids went through
the lower perforations.
Xylene injection
Temp Slurry Rate Treating Pressure
5200
5400
5600
5800
6000
6200
6400
6600
130 135 140 145 150 155 160
De
pth
(m
)
Temperature (C)
Base Temp (April 12 - 2:54)
Xylene in Formation (April 13 - 7:29)
Xylene in Formation (April 13 - 7:43)
-
2014 HALLIBURTON. ALL RIGHTS RESERVED. 16
5200
5400
5600
5800
6000
6200
6400
6600
140 145 150 155 160
De
pth
(m
)
Temperature (C)
Base Temp (April 12 - 2:54)
Temp Prod Before CT (April 13 - 04:27)
Temp Prod After CT (April 14 - 10:59)
Cooling effect observed due to the stimulation, but TEMPERATURE below punchers (5,380m)
is HIGHER after perforation cleansing with coiled tubing, indicating an INCREASE in general
PRODUCTION.
Before
Cleanup
After
Cleanup
Temp Slurry Rate
Perforation
Cleanup with
Coiled Tubing
Pre and Post Perforation Cleanup (Pulsonix) Profiles
NO DATA WAS
RECORDED,
COILED TUBING
WAS BEING
MOVED
-
2014 HALLIBURTON. ALL RIGHTS RESERVED. 17
Sections 2 & 6 present slope changes
indicating zones where more fluid went
through.
2:46 6:36 7:23 2:50
Warmback Analysis after pumping Biovert 4ppg
Temp Slurry Rate
5200
5400
5600
5800
6000
6200
6400
6600
115 120 125 130 135 140 145 150 155 160
De
pth
(m
)
Temperature (C)
Base Temp (April 12 - 2:54) Closed Well (April 16 - 02:46)
Closed Well (April 16 - 02:50) Closed Well (April 16 - 06:36)
Closed Well (April 16 - 07:23) Closed Well (April 16 - 08:21)
-
2014 HALLIBURTON. ALL RIGHTS RESERVED. 18
THE GAIN
Fiber Optic Cable inside
Coiled Tubing
Real Time temperature
monitoring
Perforation Cleanup with
Coiled Tubing
Degradable Divergent
Particles
Roughly 4 TIMES improved production compared to
previous stimulation methods.
78% Increase in Production Post-Stimulation
Bricol Summary
Acid Volume Reduction of ~70% compared to
Previous Stimulations.
-
2015 HALLIBURTON. ALL RIGHTS RESERVED. 19
Type of Services:
Perforation Cleanouts
Nitrogen Kick-off
Matrix stimulation with DTS
Abrasive pumping
Packer Setting
Wellbore Monitoring with DTS
Milling
Perforating
CoilCommSM Services
-
2015 HALLIBURTON. ALL RIGHTS RESERVED. 20
Q & A Session