COC_Replacement of Condensing Unit

download COC_Replacement of Condensing Unit

of 23

Transcript of COC_Replacement of Condensing Unit

  • 8/6/2019 COC_Replacement of Condensing Unit

    1/23

    PART I - TERMS & CONDITIONS

    PART I - TERMS & CONDITIONS

    INVITATION TO QUOTE

    INVITATION TO QUOTE TO SUPPLY LABOUR, TRANSPORT , MATERIAL AND

    INCLUSIVE OF PIPING, TRUNKING, BRACKETS, TESTING AND

    COMMISSIONING THE SYSTEM FOR THE FOLLOWING:

    Replacement of 1 set of condensing unit at #01-09, Coffee and Toast at CPF

    Robinson Building.

    (QUOTATION REF NO: PYD/2011/021 )

    The Central Provident Fund Board invites Suppliers to quote for the above 1 and 2 in

    accordance with the Terms and Conditions in Part I and the Specifications in Part II

    Suppliers are required to submit the following with the quotation submission via

    GeBIZ by the closing date and time:

    1) Annex A Form of Quotation

    2) Annex B Cost Summary

    3) Track records as indicated under Part II - Specifications

    To facilitate payment, successful Suppliers without GIRO account with the Board are

    reminded to complete and submit Annex C Direct Credit Authorization (DCA)

    Form which is to be verified and signed by the successful Suppliers Bank. The

    signed DCA Form is to be mailed to Accounts Payable Section, CPF Board, CPF

    Building, 79 Robinson Road, #32-00, Singapore 068897. Payment to successful

    Suppliers will be made via GIRO in accordance with Clause 16 of the Terms &

    Conditions in Part I. Suppliers who already have a GIRO account with the Board may

    ignore this reminder and Annex C - DCA Form.

    For any enquiries, please contact:

    Mdm Catherine Tan

    Executive Officer

    Tel No: 6229 6043

    Email: [email protected]

  • 8/6/2019 COC_Replacement of Condensing Unit

    2/23

    TABLE OF CONTENTS

    PART I - TERMS & CONDITIONS .............................................................................1

    DEFINITIONS ...............................................................................................................1

    SCOPE OF CONTRACT ..............................................................................................2

    DELIVERY ...................................................................................................................3

    WARRANTY .................................................................................................................3

    SUBMISSION OF QUOTATION .................................................................................4

    COMPLIANCE WITH INSTRUCTIONS .....................................................................4

    VALIDITY PERIOD .....................................................................................................4

    ACCEPTANCE OF QUOTATIONS .............................................................................5AWARD OF QUOTATION ..........................................................................................5

    CONFIDENTIALITY ....................................................................................................5

    DELAY IN SUPPLY AND DELIVERY AND/OR PERFORMANCE ........................6

    SUSPENSION OR TERMINATION ...........................................................................6

    RIGHTS OF THE BOARD IN THE EVENT OF DEFAULT BY THE

    CONTRACTOR .................................................................................................7

    VARIATION OF CONTRACT .....................................................................................7

    SUB-CONTRACTING AND ASSIGNING ..................................................................7

    PAYMENT .....................................................................................................................8

    THE GOODS AND SERVICES TAX (GST) ...............................................................8

    GST REGISTRATION ..................................................................................................8

    APPLICABLE LAW ......................................................................................................9

    RIGHTS OF THIRD PARTIES .....................................................................................9

    GIFTS, INDUCEMENTS AND REWARDS ................................................................9

    PART II SPECIFICATIONS ......................................................................................1

    SUPERVISION ..........................................................................................................2

    1.5 SAFETY MEASURES .......................................................................................... 2

    The Contractor shall submit the equipment proposal/work schedule for approval and

    shall only commence works only upon the instructions of the Boards

    representative. All works shall be completed within the stipulated timeframe..4

    Contractor shall liaise with the Boards representative where so required for .. .. .4

    carrying out his works..............................................................................................4

  • 8/6/2019 COC_Replacement of Condensing Unit

    3/23

    Contractor staff name and particulars shall be given to the Boards representative at

    the commencement of the Contract and any changes therefore shall be

    informed accordingly.........................................................................................4

    2.2 SCOPE OF WORK ................................................................................................4The sum quoted by contractors shall include the followings but not limited to: ..... .....4

  • 8/6/2019 COC_Replacement of Condensing Unit

    4/23

    PART I - TERMS & CONDITIONS

    PART I - TERMS & CONDITIONS

    DEFINITIONS

    1.1. In these Terms and Conditions unless the context otherwise requires:

    (a) Board means the Central Provident Fund Board constituted under the

    Central Provident Fund Act (Chapter 36) and which expression shall include its

    successors-in-title and permitted assignees and where the context so admits shall

    include its servants and agents and any officer authorised by the Board to act on its

    behalf.

    (b) Confidential Information means any information disclosed to or

    obtained by either Party in connection with the Contract.

    (c) Contract includes the Boards ITQ Message, the Contractors Quote

    Message (quotation) or offer (submitted through GeBIZ), these Terms & Conditions

    of Contract, the Specifications and samples, Letter of Acceptance, Order Message or

    any purchase orders issued by the Board to the Contractor for the supply of the Goods

    and/or performance of Services.

    (d) Contract Price means the price exclusive of the Singapore Goods and

    Services Tax (GST) payable to the Contractor for the full and proper performanceby the Contractor of his part of the Contract as determined under the provisions of the

    Contract (see Annex [B] for Cost Summary, if any) and in law;

    (e) Contractor means the successful Supplier who has been awarded the

    Contract by the Board for the provision of the Goods and/or performance of Services

    and includes the Contractors duly appointed representatives, successors and

    permitted assignees and where the context so admits shall also include the

    Contractors employees, agents and subcontractors.

    (f) Goods means all goods, including parts or units thereof, which the

    Contractor is required to supply under the Contract.

    (g) Invitation to Quote or ITQ means the Invitation to participate in the

    quotation which comprises all quotation documents forwarded to the Supplier

    inclusive of these Terms & Conditions, Specifications and any other documents and

    forms enclosed.

    (h) Office Hours means:

    1

  • 8/6/2019 COC_Replacement of Condensing Unit

    5/23

    PART I - TERMS & CONDITIONS

    (i) between 8.30 am and 1.00 pm on any Saturday which is a Working

    Day; and

    (ii) between 8.30 am and 6.00 pm on any other Working Day;

    (i) Party means either the Board or the Contractor and Parties refer to

    the Board and the Contractor.

    (j) Services means the work which the Contractor is required to perform

    under the Contract.

    (k) Specifications means:

    (i) the specifications issued by the Board to the Supplier for the

    purpose of inviting the Supplier to submit its quotation for the

    provision of the Goods and/or Services as set out in Part II of the

    ITQ; and

    (ii) Other amendments or specifications as may be mutually agreed in

    writing between the Parties.

    (l) Supplier means a person or his permitted assignees offering to supplythe Goods and / or Services.

    (m) Working Day means any day other than a Sunday or public holiday.

    SCOPE OF CONTRACT

    1.2. The Contractor shall carry out and complete the supply of all items of Goods

    and/or perform the Services in accordance with the Contract.

    1.3. Unless otherwise stated in the Contract, all Goods to be supplied must meet

    the Specifications and shall be new and unused.

    2

  • 8/6/2019 COC_Replacement of Condensing Unit

    6/23

    PART I - TERMS & CONDITIONS

    DELIVERY

    1.4. The Contractor shall deliver the Goods and perform the Services by the date

    and at the place(s) and in the manner specified in the Contract. The Contractorshall obtain a receipt therefore from the Board. The issue of such receipt shall

    in no way relieve the Contractor from his responsibility for replacing defective

    or damaged Goods or for rectifying deficient Services underClause 4 below.

    1.5. The Contractor shall at his own cost and when notified in writing by the

    Board, remove and replace the Goods that are found on delivery to be

    damaged, defective or in any way inferior to approved samples, or not in

    accordance with the Contract, failing which the Board shall have the right to

    purchase replacements elsewhere or to make good any damage in any manner

    it deems necessary and all costs thereby incurred shall be recoverable from the

    Contractor by deduction from any money due or becomes due to the

    Contractor under the Contract.

    WARRANTY

    1.6. The Warranty Period shall commence on the date of receipt of the Goods and

    on the date of acceptance of the Services in Singapore. The length of the

    Warranty Period shall be twelve (12) months or such period as agreed in

    writing.

    1.7. Where during the Warranty Period, any Good(s) is found either:

    (a) to be defective in design, materials or workmanship; or

    (b) not to be in accordance with the Contract or any specifications

    incorporated in the Contract by written agreement; or

    (c) to fail to function properly or fail to meet any of the performance

    guarantees or specifications published by the Contractor as applicable

    to the Good(s) after having been installed, operated, stored and

    maintained in accordance with the written instructions of the

    Contractor;

    then unless it is shown that the foregoing is caused solely by improper

    use or mishandling by the Board, the Contractor shall, at its own expense

    (including transportation costs), at the written notification of the Board,

    replace, rectify or completely repair the damaged or defective Good(s), failing

    which the Board shall have the right to purchase replacements elsewhere or to

    make good any damage in any manner it deems necessary and all costs

    3

  • 8/6/2019 COC_Replacement of Condensing Unit

    7/23

    PART I - TERMS & CONDITIONS

    thereby incurred shall be recoverable from the Contractor by deduction from

    any money due or becomes due to the Contractor under the Contract.

    1.8. If any Service performed is found during the Warranty Period to be deficient,the Contractor shall at the written notification of the Board, rectify the same,

    at the sole expense of the Contractor within thirty (30) days of receipt of the

    Boards written notification or within such time as mutually agreed in

    writing between the parties.

    SUBMISSION OF QUOTATION

    1.9. The Supplier shall satisfy himself on the contents of all the quotation

    documents (including those incorporated by reference). He shall also check

    that the documents issued in this ITQ are complete and that no pages are

    missing or duplicated.

    1.10. The Suppliers quoted sum shall include all incidental and contingent costs

    and expenses and no adjustment shall be made to the quotation sum for any

    error without the Boards written approval.

    1.11. Suppliers are required to submit their quotations electronically using

    Government Electronic Business (GeBIZ) before the closing date and time.

    No late submission of quotations will be entertained. Submissions by fax orany other means shall not be accepted.

    COMPLIANCE WITH INSTRUCTIONS

    1.12. Quotations will be accepted only if submitted according to the instructions

    contained and in the form(s) prescribed in the ITQ. The Board will evaluate

    the quotations fairly and in accordance with the said instructions.

    VALIDITY PERIOD

    1.13. Quotations submitted shall remain valid for acceptance by the Board for a

    period of forty-five (45) days from the closing date of the ITQ. The closing

    date of the ITQ shall not be included in the computation of the forty-five (45)

    days.

    4

  • 8/6/2019 COC_Replacement of Condensing Unit

    8/23

    PART I - TERMS & CONDITIONS

    ACCEPTANCE OF QUOTATIONS

    1.14. The Board shall be under no obligation to accept the lowest or any quotation.

    The Board will normally not enter into correspondence with any Supplierregarding the reasons for non-acceptance of a quotation.

    AWARD OF QUOTATION

    1.15. The Board reserves the right, unless the Supplier expressly stipulates to the

    contrary in his quotation, of accepting such portion of each quotation as the

    Board may decide.

    1.16. The Board also reserves the right to award the Contract in whole or in part to

    one or more Supplier.

    1.17. The successful Supplier will be notified of the acceptance of his quotation

    within the validity period via GeBIZ.

    CONFIDENTIALITY

    1.18. Each Party:

    (a) shall treat all Confidential Information belonging to the other Party as

    confidential and safeguard it accordingly; and

    (b) shall not disclose any Confidential Information belonging to the other

    Party to any other person without the prior written consent of the other

    Party, except to such persons and to such extent as may be necessary

    for the performance of this Contract or except where disclosure is

    otherwise expressly permitted by the provisions of this Contract.

    1.19. The Contractor shall take all necessary precautions to ensure that all

    Confidential Information obtained from the Board under or in connection with

    this Contract:

    (a) is given only to such of the Contractors staff and professional advisors or

    consultants engaged to advise it in connection with this Contract as is

    strictly necessary for the performance of this Contract and only to the

    extent necessary for the performance of this Contract;

    5

  • 8/6/2019 COC_Replacement of Condensing Unit

    9/23

    PART I - TERMS & CONDITIONS

    (b) Is treated as confidential and not disclosed (without the Boards approval)

    or used by any of the Contractors staff or such professional advisors

    or consultants otherwise than for the purposes of this Contract.

    DELAY IN SUPPLY AND DELIVERY AND/OR PERFORMANCE

    1.20. If there is delay in the delivery of any item of the Goods and/or performance

    of the Services named in the Contract due to any of the following

    circumstances, namely, acts of God, force majeure, riots and civil

    commotions, strikes, lock-outs or other causes or perils beyond the

    Contractors control then in any such case the Contractor shall for the duration

    of any such circumstance aforesaid, be relieved of his obligation to deliver any

    such Goods and/or perform such Services thereby affected but the provisions

    of the Contract shall remain in full force in regard to any Goods and/or

    Services not affected by such circumstances aforesaid.

    1.21. In the event of failure by the Contractor to deliver any item of Goods or

    complete the performance of Services by the date specified in the Contract

    other than due to the circumstances provided for in Clause 11.1 above, the

    Board shall have the right to cancel all or any such items of Goods and/or

    Services from the Contract without compensation and obtain them from othersources and all increased costs thereby incurred shall be deducted from any

    moneys due or to become due to the Contractor or shall be recoverable as

    damages;

    1.22. Provided that the recovery of such increased costs aforesaid shall be limited to

    the quantity of such Goods as is purchased or obtained, not exceeding the

    quantity stated in the Contract and/or Services as is stated in the Contract or is

    purchased or obtained from other sources after the Contractors failure as

    aforesaid but within three months of the expiry of the period of the Contract.

    SUSPENSION OR TERMINATION

    1.23. The Board shall, after giving seven (7) days prior written notice to the

    Contractor have the right to suspend or terminate the Contract if the Board is

    affected by any state of war, Act of God or other circumstances seriously

    disrupting public safety, peace or good order of the Republic of Singapore.

    Neither party shall be liable to the other by reason of such suspension or

    6

  • 8/6/2019 COC_Replacement of Condensing Unit

    10/23

    PART I - TERMS & CONDITIONS

    termination save that the Board shall pay the Contractor the price of the Goods

    delivered and accepted by the Board and/or Services performed and accepted

    by the Board as at the date of written notice of termination or suspension. The

    Board shall have title to such Goods delivered and accepted. The Contractorshall refund the balance of any payments or deposits made after deducting any

    outstanding sums owing by the Board to the Contractor by reason of this

    Clause.

    RIGHTS OF THE BOARD IN THE EVENT OF DEFAULT BY THE

    CONTRACTOR

    1.24. Without prejudice to any other rights or remedies available to the Board under

    the Contract, if the Contractor defaults in his performance of this Contract

    and/or fails to meet the service standards as set out in the Specifications, the

    Board may issue a notice of default to the Contractor informing the Contractor

    of its default. The Contractor shall, within thirty (30) days of the date of the

    notice of default, remedy the default. If the Contractor fails to do so, the

    Contractor shall be taken to have repudiated the Contract and the Board shall

    have the right to terminate the Contract or cancel any part thereof by way of a

    notice of termination without the Board being liable therefor in damages or

    compensation. The said termination shall take effect from the date of the

    notice of termination.

    1.25. In the event of termination underClause 13.1 above, the Board shall have the

    right to purchase from other sources all the Goods which remain undelivered

    or similar Goods and/or Services which remain unperformed at the time of

    termination or similar Services, and all increased costs reasonably incurred by

    the Board shall be recoverable from the Contractor.

    VARIATION OF CONTRACT

    1.26. No variation or amendment whether oral or otherwise in the terms of this

    Contract shall apply thereto unless such variation or amendment shall have

    first been expressly accepted in writing by the Contractor and the authorized

    contract signatory of the Board.

    SUB-CONTRACTING AND ASSIGNING

    7

  • 8/6/2019 COC_Replacement of Condensing Unit

    11/23

    PART I - TERMS & CONDITIONS

    1.27. The Contractor shall not sub-contract or assign the Contract without the prior

    written consent of the Board.

    PAYMENT

    1.28. All invoices shall be submitted electronically via Vendors@Gov at

    http://www.vendors.gov.sg, select CPF 15 (Sub-BU Description) and send the

    original delivery order (if any) to 79 Robinson Road, CPF Building 37th

    Storey, Property Department, Singapore 068897.

    1.29. The Board will make payment within thirty (30) days from the date of e-

    invoice subject to the Boards satisfactory receipt or commissioning of the

    Goods (whichever is later) or completion of the Services to the Boards

    satisfaction as referred to underClause 3.1, provided that no payment shall be

    considered as evidence of quality of any Goods and Services to which such

    payments relate nor shall it relieve the Contractor from his responsibilities

    underClause 4.

    1.30. Where delivery is by consignments, payment shall be made within thirty (30)

    days after the delivery of each consignment and the receipts of the documents

    referred to in Clause 3.1.

    THE GOODS AND SERVICES TAX (GST)

    1.31. The Supplier shall not include in the rates and prices proposed in his

    quotation, the Singapore Goods and Services Tax (GST) chargeable for the

    supply of Goods and/or Services required in the ITQ. All rates and prices

    quoted shall be exclusive of the said GST chargeable on the supply of the said

    Goods and Services.

    1.32. If the Contractor is a taxable person under the GST Act, the Board will pay the

    Contractor, in addition to the rates and prices proposed, the GST chargeable

    on the supply of Goods and/or Services provided pursuant to this Contract.

    GST REGISTRATION

    8

    http://www.vendors.gov.sg/http://www.vendors.gov.sg/
  • 8/6/2019 COC_Replacement of Condensing Unit

    12/23

    PART I - TERMS & CONDITIONS

    1.33. The Supplier shall declare his GST status in his quotation. He shall clearly

    indicate whether he is, or whether he will be a taxable person under the GST

    Act. He shall, if available, furnish the GST registration number to the Board.

    1.34. A Supplier who declares himself to be a non-taxable person under the GST

    Act but who becomes a taxable person after the award of the quotation shall

    forthwith inform the Board of his change in GST status. He shall be entitled to

    claim from the Board any GST charged on the supply of Goods and/or

    Services made by him after his change in GST status.

    APPLICABLE LAW

    1.35. All quotations submitted pursuant to this ITQ, the Contract and all its

    subsequent variations shall be subject to, governed by and interpreted in

    accordance with the Laws of the Republic of Singapore for every purpose.

    1.36. For the avoidance of doubt, until the Board issues a Letter of Acceptance, an

    Order message, or Purchase Order, this document (i) is not a contract and shall

    in no way be construed as creating any legally binding obligation to purchase

    any Goods and/or Service from any Supplier; and (ii) shall not be construed as

    providing or implying that a contract will be entered into with any supplier

    RIGHTS OF THIRD PARTIES

    1.37. A person who is not a party to this Contract shall have no right under the

    Contracts (Rights of Third Parties) Act to enforce any of its terms.

    GIFTS, INDUCEMENTS AND REWARDS

    1.38. The Board may terminate the Contract and recover from the Contractor theamount of any loss resulting from such termination, if the Contractor shall

    have offered or given or agreed to give to any person any gift or consideration

    of any kind as an inducement or reward for doing or forbearing to do or for

    having done or forborne to do any action in relation to the obtaining or

    execution of the Contract with the Board or for showing or forbearing to show

    favour to any person in relation to any Contract with the Board, or if the like

    acts shall have been done by any person employed by the Contractor or acting

    on his behalf (whether with or without the knowledge of the Contractor) or if

    in relation to any Contract with the Board the Contractor or any person

    9

  • 8/6/2019 COC_Replacement of Condensing Unit

    13/23

    PART I - TERMS & CONDITIONS

    employed by him or acting on his behalf shall have committed any offence

    under Chapter IX of thePenal Code or Prevention of Corruption Actor shall

    have abetted or attempted to commit such an offence or shall have given any

    fee or reward the receipt of which is an offence under Chapter IX of the PenalCode or the Prevention of Corruption Act.

    10

  • 8/6/2019 COC_Replacement of Condensing Unit

    14/23

    PART II SPECIFICATIONS

    1. The contractor shall in his quote include and provide, not limited to, labour ,

    transport, materials, parts, and all necessary accessories for the supply, install,

    dismantling and to test and commissioning for the following quoted items:

    Replacement of 1 set of condensing unit at #01-09, Coffee and Toast at CPF

    Robinson Building.

    There is no site showround for this replacement however those who are keen to view,

    please contact our Managing Agent, Mr Rajesh Kumar, Building Manager, at his

    handphone number 8123-8531.

    Successful contractor is required to ensure that the newly installed units are in

    operational status prior to the next working day.

    The Contractor shall be deemed to have understood the complexity and scope of works as

    specified and have visited, inspected and examined the site and have satisfied himself as to

    the local conditions, the accessibility, the full extent and character of the work, and the

    execution of the contract generally, as no claim on grounds of lack of knowledge in this

    respect shall be entertained.

    1.1 SITE CONDITIONS

    The Contractor shall be deemed to have visited and examined the site, and

    have thoroughly acquainted himself by his own independent observation the

    extent and practicality of the works, means of access, storage for materials and

    all other matter which can in anyway influence his quotation,

    1.2 INSTRUCTION TO CONTRACTOR

    It is a requirement that the Contractor must comply with all specifications,

    requirements and Terms and Conditions. The Contractor must quote all items

    listed in the Invitation to Quote (ITQ) as required. Failure to do so shall render

    the Contractor failure in compliance with the specifications and requirements.

    The Board shall be under no obligation to accept the lowest or any quotation.

    1.3 LIABILITY AND INDEMNITIES

    CPF Board shall not be liable for any loss, damage, cost or expenses

    whatsoever, including loss of profits, business or anticipated savings, or any

    other indirect or consequential loss, suffered or incurred by the Contractor or

    any of its agents, servants, employees or sub-contractors which may arise

    1

  • 8/6/2019 COC_Replacement of Condensing Unit

    15/23

    (whether in Contract, tort, under statute or otherwise) by reason of or in

    connection with the Contract.

    SUPERVISION

    The whole of the Works is to be executed by competent and skilled tradesmenwith the necessary trade qualification.

    The Contractor shall provide a competent supervisor of the company/firm with

    at least 5 years experience, duly authorized to act or receive instruction,

    collect or co-ordinate Service Order, Purchase Order and instruction given by

    CPF Board.

    The Works shall be under the general supervision of CPF Board or its agent

    and no part of Works shall be altered without written consent of CPF Board.

    Notwithstanding the general supervision of CPF Board or its agent, the

    Contractor shall be liable for any defective work performed.

    The Works shall be carried out and completed to the satisfaction of CPF Board

    or its agent. The Contractor shall comply with all instructions, which may be

    given by CPF Board or its agent for the proper execution of the Works.

    The Contractor shall take full responsibility for the adequacy, stability and

    safety of all Sites undertaken and methods of operations.

    Whilst within CPF Boards premises, the Contractor and his servants or agentsshall strictly observe all security and safety measures as are currently in force

    and at all times to ensure disciplined behavior.

    1.5SAFETY MEASURES

    In the execution of the Works under the Contract, the Contractor is required to

    comply with the provisions of the Factories Act (CAP 104) of the Republic of

    Singapore, the Code of Practice for Occupational Safety & Health as laid

    down by the Competent Authority and any subsequent amendment thereof and

    shall also, by enforcement on his part, ensure that his servants and agents

    similarly comply with the provisions of the said Factories Act and the Code ofPractice for Occupational Safety & Health. Any cost incurred by the

    Contractor in complying with the provisions of this clause shall be fully borne

    by the Contractor.

    The Contractor shall maintain the Work Site environment in a safe condition.

    If in the opinion of CPF Board or its agent or that of a Competent Authority

    that the Contractor has failed to achieve such requirements resulting in

    possible damage to the workers/public, then the Competent Authority shall be

    empowered to carry our any necessary work to remove the source of that

    danger or mitigate its effects on behalf of CPF Board and all cost incurred

    shall be ducted from any monies due or to become due to the Contractor underthis Contract.

    2

  • 8/6/2019 COC_Replacement of Condensing Unit

    16/23

    Smoking is strictly prohibited within the work sites in CPF Boards premises.

    1.6 RESTRICTION OF HOURS OF WORKS

    All works shall be carried out during office hours, and on Saturday or Sunday

    only. All noisy works shall be done after office hours from 1830 hours

    onwards or as and when directed by CPF Board.

    1.7 COMPLETION OF WORKS

    All works including testing and commissioning must be completed and

    handed over to CPF Board within 1 month from issuance of Purchase Order.

    The awarded contractor shall in his quotation make allowance for the works

    to be carried out during office and after office hours. No additional claim of

    overtime will be allowed.

    1.8 OTHERS

    Any replacement of parts are payable by the Board. Contractor shall not

    replace any parts without priorapproval from the Board, in the form of Work

    Order or Purchase Order.

    The contractor shall provide everything necessary to protect existing works

    while the servicing and testing are in progress and is to make good or pay for

    re-instatement of all damages caused thereto to the entire satisfaction of the

    Board. All debris shall be removed and cleared immediately from the site from

    time to time as it accumulates.

    2. TECHNICAL SPECIFICATIONS

    2.1 CONTRACT REQUIREMENTS

    All works performed under this contract shall comply with the rules and

    regulations of CPF Board. The Contractor shallprovideexplicitresponsesof

    compliance or non- compliance with any other technical requirements

    enclosed in the ContractSpecifications. Intheeventofany non- compliancewith the technical requirements, the Contractor shall satisfy the CPF Board

    (byprovidingacertification from the manufacturerof the item offered ora

    copyof the relevantextract fromany reputablepublicationcitingclearly its

    title and edition) that the form, fit and function of the items offered are

    equivalent to the goods or services require. Where the Contractor fails to

    satisfy the CPF Board in the manner above, the quotation is liable tobe

    rejected.

    3

  • 8/6/2019 COC_Replacement of Condensing Unit

    17/23

    The Contractor shall submit the equipment proposal/work schedule for

    approval and shall only commence works only upon the instructions of the

    Boards representative. All works shall be completed within the stipulated

    timeframe.

    Contractor shall liaise with the Boards representative where so required forcarrying out his works.

    Contractor staff name and particulars shall be given to the Boards

    representative at the commencement of the Contract and any changes therefore

    shall be informed accordingly.

    Sufficient protection must be done to lifts, walkways, corridors etc and to

    existing installations within the immediate area of the works.

    2.2 SCOPE OF WORK

    The Contractor shall in his quote include and provide, not limited to, labour, transport,

    materials, parts and all necessary accessories for the Air-Con Condensing unit at #01-

    09 (Coffee & Toast). Followed by supply, install/replace, test and commission of the

    condensing unit as mentioned above at the said location of CPF Robinson Building.

    The sum quoted by contractors shall include the followings but not limited to:

    a) Inspect site condition before starting work.

    b) Supervisor must assess and brief Safety issue (Risk Assessment) to thepersonnel replacing the condensing unit.

    c) Replacement of condensing unit must be done by skilled worker.

    d) Cordon off working area, put up necessary sign etc if necessary.

    e) Pump down the refrigeration gas out of the system.

    f) Switch off power supply at the isolator.

    g) Dismantle the necessary wiring.

    h) Dismantle the refrigerant pipe using brazing set.

    i) Replacement and disposal of faulty condenser unit.

    j) Replacement of liquid filter dryer.

    k) Pressure Test.

    l) Purging to -30 PSI

    m) Connect back the refrigerant pipe using the brazing set and visual lead check.

    4

  • 8/6/2019 COC_Replacement of Condensing Unit

    18/23

    n) Connect back all wiring accordingly.

    o) Vacuum the system and top up refrigerant gas.

    p) Turn on power supply at the isolator.

    q) Test and commission the condenser

    - check voltage, check running current.

    r) Brand: Daikin

    Power Supply: 230V

    CU Model: RX16MY1/SN: 6300061

    CU Brand: Daikin

    s) Carry out all other works where and when deemed necessary for the successful

    execution and completion of the contract.

    t) The contractor shall thoroughly test the system and ensures its reliability and

    operational readiness prior to handing over to the owner. The testing and

    commissioning of all related works shall be witnessed by the Boards

    Representative and all reports certified by Qualified Persons.

    u) All works performed shall comply in full with the relevant regulations that

    govern the installation, safety and certification of the system:

    Singapore Standard Code of Practice CP5 : 1998 Electrical Installations

    Singapore Standard Code of Practice CP48 : 2005 Water Services

    Singapore Standard Code of Practice CP13 : 1999 Mechanical Ventilation

    and Air-Conditioning in Buildings

    Regulations and by-laws of relevant Authorities that have jurisdication over

    these works

    v) The Contractor shall price for the provision of 12 months workmanship

    warranty and 5 years warranty for condensing . The detail of the scope of

    servicing and maintenance work during the warranty period shall be provided

    with the quotation submission

    w) Within the defects liability period, the contractor shall provide 1 hour respond

    time to all faults at no additional cost. Any fault shall be rectified within 2

    hours from the time the complaint is lodged by the Board. The Contractor

    shall not be entitled to any claim for such rectification works. The detail of the

    5

  • 8/6/2019 COC_Replacement of Condensing Unit

    19/23

    scope of servicing and maintenance work during the warranty period shall be

    provided with the quotation submission.

    x) Open-flame welding, torch cutting or at such a high temperature that would

    cause combustion to the premises shall be termed shall be termed as hotworkand shall be prohibited unless approved by the Boards Representative.

    Sufficient fire safety precautious shall be provided at the immediate work area

    with the endorsement of the Boards Representative and these precautions

    shall in no way inhibit, affect or reduce the efficiency of existing fire

    fighting/protection system and means of escape.

    The Operator shall be trained and qualified to operate the apparatus including

    the usage and temporary storage of the cylinder during the duration of the

    works. The Contractor shall submit proof of training and/or qualification to

    the satisfaction of the CPF Board.

    The Contractor shall provide fire extinguishers within 10 metres from the

    work area where the apparatus is used and shall cost in all safety barricades,

    notices in the quotation sum.

    3. General Information

    a) All parking charges to be borne by the contractor/supplier.

    b) In no case will any expense incurred by the contractor/supplier in the

    preparation of his quotation to be borne by the Board.

    c) Unless otherwise stated the working hours shall be done after office hours

    from 6.00pm to 10.00pm from Monday to Friday and from 1.00pm to 5.00pm

    for Saturday, Sunday (full day) and as when directed by CPF Board.

    d) No hacking, drilling or other noisy works is allowed to be carried out between

    office hours from Mondays to Saturdays.

    e) All works must be completed within of 3 working days upon issuance of

    purchase order. The awarded contractor shall in his quotation make allowance

    for the works to be carried out during office hours. The Contractor is to liaise

    with Tenant on the suitable working hours and to ensure no disruption of the

    operation. No additional claim of overtime will be allowed if the job is to

    carry out after office.

    f) The Contractor shall provide everything necessary to protect existing fixtures

    while installation works are in progress and shall make good or pay for re-

    6

  • 8/6/2019 COC_Replacement of Condensing Unit

    20/23

    instatement of all damages caused thereto to the entire satisfaction of the

    Board.

    4) Track Records

    7

  • 8/6/2019 COC_Replacement of Condensing Unit

    21/23

    Suppliers are required to provide a list of clients (including the clients contact

    details) for the immediately preceding 3 years whom they have provided similar

    jobs.

    FORM OF QUOTATION

    To: Name of Supplier(s):

    Central Provident Fund Board Address:

    RE: QUOTATION REF NO. ______________________________________

    1. I / We*, ______________________________________ (Name of Company in

    Block Letters) hereby offer and undertake on the acceptance of this quotation to

    supply the goods and/or servicesas specified in the Specifications under Part II of

    your Invitation to Quote (ITQ) and under the Terms and Conditions in Part I ofyour Invitation to Quote.

    2. Our quotation is fully consistent with and does not contradict or derogate from

    anything in Part I Terms and Conditions of the ITQ or downgrade anything in

    the Specifications. In the event of the Boards acceptance of our quotation, we

    agree that all documents of the ITQ shall form part of a binding agreement

    between us.

    3. I / We* warrant, represent and declare that we are duly authorized to submit, sign

    this quotation, receive instruction, give any information, accept any contract and

    act for and on behalf of _________________ (Name of Company in Block

    Letters).

    Dated this ____________ day of ________ _____, 2011.

    _______________________

    Authorized Signature

    Name:

    Designation:

    Email Address:

    (*Delete whichever is not applicable)

    ANNEX B COST SUMMARY

    8

  • 8/6/2019 COC_Replacement of Condensing Unit

    22/23

    Having examined and understood the Invitation to Quote for the execution of the

    above named works, we hereby offer to supply and replace based on the description

    and quantity as shown in the table below and complete the works in full compliance

    with the Terms, Conditions and Requirements stated in the Technical Specificationsand Invitation to Quote as follows:

    S/N Description Quantity Unit

    Price

    (S$)

    Total Price

    (S$)

    1 To replace 1 no. of air-con condensing

    unit at #01-09, Coffee & Toast at CPF

    Robinson Building including testing

    and commissioning of the system.

    Brand: Daikin

    Power: 230V

    CU Model: RX16MY1/SN:6300061

    CU Brand: Daikin

    1 no

    2 Trade-in value of the existing unit, if

    any.

    1 no

    Grand Total Price :

    Submitted By

    Name of Authorized Person: ______________________________

    Name of Company : ______________________________

    Address : ______________________________

    ______________________________

    Telephone : ______________________________

    Fax : ______________________________

    Date : ______________________________

    9

  • 8/6/2019 COC_Replacement of Condensing Unit

    23/23

    ANNEX C - DIRECT CREDIT AUTHORISATION (DCA) FORM

    DCA form