Cockermouth 8 Mnths On
16
Cockermouth Eight Months On
-
Upload
mark-ollis -
Category
Education
-
view
1.118 -
download
0
description
A return to Cockermouth after the floods on on the eve of the visit by Princess Anne
Transcript of Cockermouth 8 Mnths On
Cockermouth
Eight Months On
Main Street
Abandonment
Restoration
Adaptation
Wordsworth House
Flood Level
Education
Riverside
Despair
Hope
Brewery Bridge
Defence
1 Million from the EA
Workington North Station
• At the end of September 2010 Workington North Railway Station closed
• Serving 2000 passengers following the bridge collapse this has now dropped to 60.
Credits
• Photos
Mark OLLIS
• based on the Cockermouth flood trail leaflet – purchased to raise funds for town’s recovery