Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
ASTeC Research Strategy
Mike PooleDirector
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
ASTeC Strategic Objectives• Establish and consolidate UK core accelerator skills base
– leadership and advice to stakeholders
• Ensure international competitiveness – (people + programme)
• Develop future LSF – (advice, design, prototype, construction)
• Promote suitable CCLRC activities (DL + RAL)
• Pursue underpinning technology – (inc. experiments)
• Encourage collaborations – (AIs + HEIs + international)
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
Key Elements
• Underpinning design studies
• Beam dynamics simulations
• New technology demonstration
• Advanced beam test facilities
• Major networking with HEIs and overseas laboratories
• Knowledge transfer
• Recruitment
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
Programme Outline• Project support
• ERLP FETS MICE 4GLS ILC NF SRS DIAMOND XFEL FAIR
• Underpinning generic studies
• Types• Gun linac ERL synchrotron storage ring FFAG BTS
• Categories• Conceptual (and Technical) Design Studies• Beam dynamics and Radiation Sources• Technologies - magnetics,
RF
diagnostics
vacuum science
collimation and dumps
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
Extrapolated SR02 funds = £6M over 3 years
Policy decision:
• 25% on LC programme: £1.5M
• of which £500k available to promote HEI studies
• LC-ABD support to be demonstrated• Priority to synergetic activities (eg Light Sources)
Agreed joint work packages with HEIs:– Collimation
– Longitudinal bunch diagnostics
– BPM R&D
ASTeC Funded LC Programme
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
ASTeC Funded Work Packages (3 year)
1. Collimation (ASTeC/Lancaster)• wake field simulations + experiments• £500k (inc RA)
2. Temporal Profile (ASTeC/Abertay)• electro-optic developments (+ small SP support)• ultrafast laser for tests• £600k (inc RA)
3. Advanced BPMs (ASTeC/Cambridge/UCL)• use in high precision spectrometry• £250k (inc RA)
4. Access to Test Beams at SLAC (All groups)
• £100k support costs on ESA
NB CCLRC also funds international advisory panel and travel administration
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
EU Programmes
• Previous FP5: EUFELE RF Cavity*
• FP6 I3 contracts: HIPPI ELAN PHIN
• FP6 awards: EuroTeV EUROFEL
* Officially completed
NB Major problem of overhead recovery
FP7 presents major challenges
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
Underpinning R&D
• Laser based accelerator systems (with CLF and HEIs)
• Novel magnet systems (with EID and HEIs)
• Vacuum science research collaborations (inc MMU contract)
• Advanced RF technology (with HEIs)
ca £500k pa staff costs (70% ASTeC)
NB This excludes generic R&D elements of funded project programmes
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
Planned ASTeC Income 05/06
INCOME SOURCES 05/06
EU5%
OTHER8%
OTHER CCLRC VOTE BUDGET
28%
SR2002 SCIENCE BUDGET
EARMARKED35%
PPARC24%
PPARC
SR2002 SCIENCE BUDGETEARMARKED
OTHER CCLRC VOTE BUDGET
EU
OTHER
TOTAL ~ £8M
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
Planned ASTeC Expenditure 05/06EXPENDITURE 05/06
SCIENTIFIC & ENGINEERING STAFF
COSTS29%
CENTRAL SERVICES 17%
CAPITAL EXPENDITURE
17%CONSUMABLES,
TRAVEL37%
SCIENTIFIC & ENGINEERINGSTAFF COSTS
CONSUMABLES, TRAVEL
CAPITAL EXPENDITURE
CENTRAL SERVICES
EXPENDITURE BY PROGRAMME 05/06
EU AND REPAYMENT WORK13%
PPARC/CCLRC LC-ABD PROGRAMME
26%
PPARC/CCLRC UK-NF PROGRAMME
14%
HIGH POWER PROTON ACCELERATORS
15%
HIGH BRIGHTNESS ELECTRON
ACCELERATORS7%
UNDERPINNING RESEARCH
11%
OTHER PROFESSIONAL
ACTIVITIES14%
PPARC/CCLRC LC-ABDPROGRAMME
PPARC/CCLRC UK-NF PROGRAMME
HIGH POWER PROTONACCELERATORS
HIGH BRIGHTNESS ELECTRONACCELERATORS
UNDERPINNING RESEARCH
OTHER PROFESSIONAL ACTIVITIES
EU AND REPAYMENT WORK
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
Long Term Investment Priorities
• Sustainable skill base
• Funding of prototypes
• Integrated SRF design/construction/testing facility
• Build and operate e-FFAG Model (on ERLP)
• Construct e and p Accelerator Test Facilities (DL + RAL)
• Ramp up R&D funding prior to Capital Facility
NB All of these involve HEI collaboration and cross-Council interests
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
Proposed SRF Technology Initiative
• Maturity and applicability of superconducting RF systems• including 4GLS and ILC - potential major UK role
• Demanding superconducting RF infrastructure
• Integrated design, build and test (HP) - nowhere in Europe !
• Collaboration • ASTeC/HEIs/Industry/Faraday Partnership/NWDA
• Exploit Daresbury infrastructure
• Unsuccessful bids to PPARC (£10M ?)
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
Proposed site for EMMA: e-FFAG Model
Build for £4M ?
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole
Issues
• Training
• Prototype Funding
• Infrastructure
• Collaborations
• Publications