CO CKMH JPN Single-Level Price Determination
-
Upload
nguyencaohuy -
Category
Documents
-
view
18 -
download
4
description
Transcript of CO CKMH JPN Single-Level Price Determination
Work Instruction CKMH - JPN - Single-Level Price Determination
Purpose
Use this procedure to edit actual costing run for the single level price determination.
Single-level material price determination calculates the periodic unit price for a material. The standard price and the cumulative single-level differences of the period are taken into account.
The material price calculated in multilevel price determination can be used for inventory valuation.
Single-level price determination is a prerequisite for multilevel price determination.
Trigger
Perform this transaction when need to execute Single - Level price determination.
Menu Path
Use the following SAP Easy Access menu path(s) to begin this transaction:
Logistics > Materials Management > Material Master > Environment > Material Ledger > Periodic Material Valuation > CKMH - Determine Material Prices (Single-Level)
Transaction Code
CKMH
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
1/14
Work Instruction CKMH - JPN - Single-Level Price Determination
Screen Flow
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
2/14
Work Instruction CKMH - JPN - Single-Level Price Determination
Procedure
1. In SAP, start the transaction using the menu path or transaction code.
SAP Easy Access
2. Double-click the Logistics node .
3. Double-click the Materials Management node .
4. Double-click the Material Master node .
5. Double-click the Environment node .
6. Click the Scroll down button .
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
3/14
Work Instruction CKMH - JPN - Single-Level Price Determination
7. Double-click the Material Ledger node .
8. Double-click the Periodic Material Valuation node .
9. Double-click the CKMH - Determine Material Prices (Single-Level)
node .
You can also enter "CKMH" in the command field "
" and click Enter " " to go directly to this transaction.
Single-Level Material Price Determination
10.
Click the Material edit field .
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
4/14
Work Instruction CKMH - JPN - Single-Level Price Determination
11.
Click the Material possible entries button .
Material Number (1)
12.
As required, complete/review the following fields:
Field R/O/C Description
Material R The goods that are the subject of business activity. The material can be traded, used in manufacture, consumed, or produced. Example:
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
5/14
Work Instruction CKMH - JPN - Single-Level Price Determination
668165*
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
6/14
Work Instruction CKMH - JPN - Single-Level Price Determination
13.
Click the Enter button .
Material Number (1) 39 Entries found
14.
Click the Material button .
Click the column header to sort the list items by material code
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
7/14
Work Instruction CKMH - JPN - Single-Level Price Determination
15.
Double-click the 66816551 list item .
Single-Level Material Price Determination
16.
As required, complete/review the following fields:
Field R/O/C Description
Plant R A plant is an organizational unit for dividing an enterprise according to production, procurement, maintenance, and materials planning. It is a place where materials are produced, or goods and services are provided. Example:
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
8/14
Work Instruction CKMH - JPN - Single-Level Price Determination
7420
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
9/14
Work Instruction CKMH - JPN - Single-Level Price Determination
Field R/O/C Description
Period R Unit of time into which a fiscal year is subdivided. Company data can be analyzed on a particular date in each period. In accounting, a fiscal year can be subdivided into a maximum of 16 periods. The fiscal year itself is a period. Example: 11
Year R Period, 12 months as a rule, for which the company is to create its inventory and balance sheet. The fiscal year can be the same as the calendar year, but does not have to be. Example: 2008
17.
Click the Scroll down button .
18.
Click the Background Processing check box .
Single-Level Material Price Determination
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
10/14
Work Instruction CKMH - JPN - Single-Level Price Determination
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
11/14
Work Instruction CKMH - JPN - Single-Level Price Determination
19.
Click the Execute button .
Single-Level Material Price Determination
20.
Click the ..2 icon .
21.
Click the Back button .
22.
Click the Exit button .
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
12/14
Work Instruction CKMH - JPN - Single-Level Price Determination
Result
You have executed single level price determination.
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
13/14
Work Instruction CKMH - JPN - Single-Level Price Determination
Scenario
Instructions In this simulation you are required to:
Execute single-level price determination in SAP ECC 6.0.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as necessary while performing the exercise.
Field Value
Material 66816551
Plant 7420
Period 11
Year 2008
Tuesday, July 14, 2009 CO_CKMH_JPN_Single-Level Price Determination.udc
14/14