CO CK86 99 JPN Multilevel BOM Value Amount Status

11
Work Instruction CK86_99 - JPN - Multilevel-BOM-Value-Amount- Status Purpose Use this procedure to run Multilevel BOM value amount status report. Trigger Perform this transaction when you need to display Cost estimates at each level of BOM breakdown. Menu Path Use the following SAP Easy Access menu path(s) to begin this transaction: Accounting > Controlling > Product Cost Controlling > Product Cost Planning > Information System > Detailed Reports > For Materials > CK86_99 - Costed Multilevel BOM Transaction Code CK86_99 Wednesday, July 15, 2009 CO_CK86_99_JPN_Multilevel-BOM- Value-A mount-Status.udc 1/11

description

co temple

Transcript of CO CK86 99 JPN Multilevel BOM Value Amount Status

Page 1: CO CK86 99 JPN Multilevel BOM Value Amount Status

Work Instruction CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Purpose

Use this procedure to run Multilevel BOM value amount status report.

Trigger

Perform this transaction when you need to display Cost estimates at each level of BOM breakdown.

Menu Path

Use the following SAP Easy Access menu path(s) to begin this transaction:

Accounting > Controlling > Product Cost Controlling > Product Cost Planning > Information System > Detailed Reports > For Materials > CK86_99 - Costed Multilevel BOM

Transaction Code

CK86_99

Wednesday, July 15, 2009 CO_CK86_99_JPN_Multilevel-BOM-Value-A mount-Status.udc

1/9

Page 2: CO CK86 99 JPN Multilevel BOM Value Amount Status

Work Instruction CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Screen Flow

Wednesday, July 15, 2009 CO_CK86_99_JPN_Multilevel-BOM-Value-A mount-Status.udc

2/9

Page 3: CO CK86 99 JPN Multilevel BOM Value Amount Status

Work Instruction CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Procedure

1. In SAP, start the transaction using the menu path or transaction code.

SAP Easy Access

2. Double-click the Accounting node .

3. Double-click the Controlling node .

4. Double-click the Product Cost Controlling node .

5. Double-click the Product Cost Planning node .

6. Double-click the Information System node .

Wednesday, July 15, 2009 CO_CK86_99_JPN_Multilevel-BOM-Value-A mount-Status.udc

3/9

Page 4: CO CK86 99 JPN Multilevel BOM Value Amount Status

Work Instruction CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

7. Double-click the Detailed Reports node .

8. Double-click the For Material node .

9. Double-click the CK86_99 - Costed Multilevel BOM node .

Multilevel BOM: Value / Amount / Status

10.

As required, complete/review the following fields:

Wednesday, July 15, 2009 CO_CK86_99_JPN_Multilevel-BOM-Value-A mount-Status.udc

4/9

Page 5: CO CK86 99 JPN Multilevel BOM Value Amount Status

Work Instruction CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Field R/O/C Description

Material R The goods that are the subject of business activity. The material can be traded, used in manufacture, consumed, or produced. Example: 66810950

Plant R A plant is an organizational unit for dividing an enterprise according to production, procurement, maintenance, and materials planning. It is a place where materials are produced, or goods and services are provided. Example: 7U11

Costing variant

R Contains all control parameters for costing, including parameters that control how cost estimates are executed and which material prices or activity prices are used to valuate the costing items. Example: PPC1

Costing version

R Method of distinguishing two or more cost estimates for the same material. Example: 1

11.

Click the Cost Comp. View drop-down list .

12.

Click the Cost of Goods Manufactured list item .

13.

Click the Execute button .

Wednesday, July 15, 2009 CO_CK86_99_JPN_Multilevel-BOM-Value-A mount-Status.udc

5/9

Page 6: CO CK86 99 JPN Multilevel BOM Value Amount Status

Work Instruction CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Costed Multilevel BOM Value / Amount / Status

14.

Click the FG RX ROL PAS-P 40ML P4x6 -N node .

15.

Click the Expand Subtree button .

Wednesday, July 15, 2009 CO_CK86_99_JPN_Multilevel-BOM-Value-A mount-Status.udc

6/9

Page 7: CO CK86 99 JPN Multilevel BOM Value Amount Status

Work Instruction CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Costed Multilevel BOM Value / Amount / Status

16.

Click the Exit button .

Wednesday, July 15, 2009 CO_CK86_99_JPN_Multilevel-BOM-Value-A mount-Status.udc

7/9

Page 8: CO CK86 99 JPN Multilevel BOM Value Amount Status

Work Instruction CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Result

You have successfully run the Multilevel BOM value amount status report.

Wednesday, July 15, 2009 CO_CK86_99_JPN_Multilevel-BOM-Value-A mount-Status.udc

8/9

Page 9: CO CK86 99 JPN Multilevel BOM Value Amount Status

Work Instruction CK86_99 - JPN - Multilevel-BOM-Value-Amount-Status

Scenario

Instructions In this simulation you are required to:

Run the Multilevel BOM Value Amount Report in SAP ECC 6.0.

Required Data

This section provides the field data required to complete this exercise. Refer to this data sheet as necessary while performing the exercise.

Field Value

Material 66810950

Plant 7U11

Costing variant PPC1

Costing version 1

Wednesday, July 15, 2009 CO_CK86_99_JPN_Multilevel-BOM-Value-A mount-Status.udc