CMWG UpdateMark Soutter - Invenergy LLC
WMS November 2015 Meeting
CMWG Update
• 2016 CRR Activity Schedule• Access to Data on Stability Limits -- GTLs Related to New Generation
Interconnection• Dynamic Ratings in Off-Peak CRR Models• Multiple GTCs in the Panhandle
2016 CRR Activity Schedule
•Where necessary to avoid overlapping bid windows with monthly auctions, two Seq3 LTAS auctions and one Seq4 LTAS auction were pushed back by one week
• 2018.2nd6.AnnualAuction.Seq3• 2019.1st6.AnnualAuction.Seq4• 2019.1st6.AnnualAuction.Seq3
2016 CRR Activity Schedule
• The Credit Release and Invoice Posting columns were combined:
• Column heading is now “Auction Invoice Posted and Credit Released On or Before This Date”
• The dates for both are always the same
• Removes extra column, making the calendar easier to read
2016 CRR Activity Schedule
•No substantial holiday conflicts observed
• 2018.1st6.AnnualAuction.Seq3 only moved back by 1 week to avoid overlapping bid window with 2017.JAN.Monthly.Auction
• Biggest potential conflict is opening the bid window for the 2019.2nd6.AnnualAuction.Seq4 auction on 1/2/2018• Falls in line with the typical Tuesday through Thursday bid window
• 2016 CRR Activity Schedule Endorsed by CMWG without comment
FIS Reports & Market Information Asymmetry • Brad Bell of E.On brought draft NPRR/PGRR language for discussion• Potential for unintended consequences relating to project
confidentiality• Is a standardized Executive Summary for Stability Studies the answer?• ERCOT (Jeff Billo) will convene a small meeting with TSPs and IEs to
explore potential solutions and bring them back to CMWG
Dynamic line ratings in Off-Peak CRR Model• Luminant presented a proposal to utilize off-peak temperatures in the
CRR auctions (including the LTAS and monthlies)• The proposal would improve the representation of the transmission
system for dynamically rated lines in the off-peak• Would increase off-peak CRR availability with limited risk of over-sell• Doubles computing needs to build both models • Requires model to pull outages twice, bumping the schedule a day
which would miss the weekly outage model load
Multiple GTCs in the Panhandle
• At RPG the concept was raised of multiple GTCs in the Panhandle• Short Circuit Ratio and Voltage Stability could have different interfaces with
different GTLs• Potential item for November CMWG meeting
Questions?