CMS TRACKER STATUS REPORT
Dimitri Pandoulas CMS Week 03.12.01 1
Pixel Workshop held at CERN , Nov. 30 ‘01
Conclusions on the Layout of the Pixel System (PRELIM) :
•For 2 pixel hits, physics potential depends only slightly on pixel layout
•For 3 pixel hits: Important CPU reduction on trigger level in finding track segments
•3 pixel hits imply three Barrel layers
•Differences for two or three forward disks < 10%
Two configurations relevant: B2D1 and B3D2Dimitri Pandoulas CMS Week 03.12.01 1A
The CMS Tracker
5.4 m
Outer Barrel –TOB-
Inner Barrel –TIB-
End cap –TEC-Pixel
2,4
m
volume 24.4 m3
running temperature – 10 0Cdry atmosphere for YEARS!
Inner Disks –TID-
Dimitri Pandoulas CMS Week 03.12.01 2
Dimitri Pandoulas CMS Week 03.12.01 3
Dimitri Pandoulas CMS Week 03.12.01 4
APV Links “FEDs” Total
TOB
kCHF
2160 1080 14
- 22 - 108 - 245 - 375
TEC
kCHF
2880 1440 48(32,16)
+ 29 + 144 + 840 + 1013
Layout Modification Total Cost
Minimal cost of the difference 78 kCHF… but 16 “FEDs” not considered a Minimal cost of the difference 78 kCHF… but 16 “FEDs” not considered a viable solutionviable solution
Dimitri Pandoulas CMS Week 03.12.01 5
Silicon Strip Modules
Sensors• Preseries (for Milestone 200) in hand and qualified • Contract with Hamamatsu signed• Contract with ST to be signed shortly (some technical details finalized)
• “Express Line” TOB modules (for system test) built and qualified in test beam
• First TEC modules built
Module components for M200(Sensors, frames, Pitch Adapters, Kapton strips) : readyFE Hybrids : available shortly
Dimitri Pandoulas CMS Week 03.12.01 6
Express Line :20 (TOB) hybrids assembled Design of hybrid qualified
• Prototypes:– Two companies selected
• Dorazil, Berlin(D) for TOB/TEC • Mipot, Cormons (I) for TIB/TID
– Problems in substrate production due to required small feature size (120 m) of layout.
– Delivery now Dec 2001 / Jan 2002
Industrial Production (for 200 modules: M200)
Dorazil (TOB / TEC)– All 150 substrates produced. Samples inspected by us: excellent quality!– 5 assembled hybrids shipped on 30.11.01– If ok, remaining 150 expected before 15.12.01
• Preliminary Conclusion by Dorazil:– The present high density layout with very small features (120m) is not suited for
reliable and cost effective mass production!– Modifications proposed!
FE-Hybrids
Dimitri Pandoulas CMS Week 03.12.01 7
– Long time needed to arrive at a working procedure
– First 10 substrates have been produced in w47 (Nov. 19)
– Will be sent to Strasbourg for inspection in w48 (Nov.26)
– If ok, 50 substrates will be produced
MIPOT (TIB)
FE-Hybrids (cont’d)
• Large-Scale Production:– Layout density needs to be revised
=> use packaged chips (design already available)
– Change of TIB geometry (significant!!!) => need new prototype
– Tendering in spring 2002
Dimitri Pandoulas CMS Week 03.12.01 8
Ring 1-4: 2764 modules Ring 5-7: 4277 modules
FE779 carbon
FE779 carbon
K800 CFC
CTE (ppm/K) (W/mK)
CFC 0.5 In plane: 200-300, plane: 1
FE779 carbon 7.4 65
Hybrid 6.5
Si 4.7 84
TECFrames
Dimitri Pandoulas CMS Week 03.12.01 9
Ring 1-4 TEC Frames: Deformations
An identical module was made with a FE779 frame
Setup to measure deformations by observing the reflection of a grid off the test object with a CCD camera
Dimitri Pandoulas CMS Week 03.12.01 10
CFC K800 FE779 carbon
Temperatures
TECFrames
Dimitri Pandoulas CMS Week 03.12.01 11
T = 30
TEC FRAMES
Rings 1-4: One piece frames in FE779 carbon
Rings 5-7: Hybrid support in FE779 carbon
Support Legs in CFC (K800)
TEC FRAMES FE779 carbon K800 CFC
Costs for 2764 Ring 1-4 frames: 132 kCHF 268 kCHF
Costs for 4277 Ring 5-7 frames: 341 kCHF 641 kCHF
Total costs for all TEC frames: 473 kCHF 882 kCHF
Dimitri Pandoulas CMS Week 03.12.01 12
First TEC Module ARC System Readout
Dimitri Pandoulas CMS Week 03.12.01 13
Test of first TEC Module
Module thermally cycled 20X from +20° to -20°
No changes
No new dead strips
Dimitri Pandoulas CMS Week 03.12.01 14
Dimitri Pandoulas CMS Week 03.12.01 15
Optoelectronics
Analogue optohybrids
Digital (control link) Optohybrid
•Operation: 80Mb/s
•First link successfully integrated into Tracker system test environment
•Provides key element of Tracker Control system
(see Jan Troska’s talk Thursday)
Tracker System Test Analogue and Digital Links
successfully integrated into Tracker System Test Bench
System measurements starting Will scale up to TOB ROD
PC with FED/FECDetector Module/AOH
Digital Control – DOH & TRxAnalogue Rx
500
400
300
200
100
0
AD
C C
ou
nts
6.05.04.03.02.01.00.0Time (s)
Example Dataframes after digitisation
Dimitri Pandoulas CMS Week 03.12.01 16
Detectors mounted on CF half-shells
After design validation TIB After design validation TIB is ready to procure the is ready to procure the mechanical structure mechanical structure starting from the molds to starting from the molds to produce the shellsproduce the shells
Upper shell mold
TIB Mechanics
Dimitri Pandoulas CMS Week 03.12.01 17
• Pointing• Good r-phi overlap• Uses same sensors as TEC Rings 1-3• Non hermetic (each disk is about 5% inefficient;)
• TID Layout #2 (Sept. ‘01)
Impact on the performance under study
For hermeticity:
Larger Ring 1 Sensor
R in : - 3.7mm
R out : +21.9mm
H : +23.4mm
New Mask Needed(+120 kCHF)
To be decided this
week
TID mechanics fully compatible with new sensor dimensions
Dimitri Pandoulas CMS Week 03.12.01 18
The channel density in layers 1 and 2 has been reducedPitch on r- detectors increased from 122 to 183 m
The grouping of cooling, controls and readouthas been re-optimized and frozen
Detailed study of the service arrangementhas now started
TOB
Dimitri Pandoulas CMS Week 03.12.01 19
Three rod frames assembled during the summerPrototypes of the final design
TOB
20
Validate design Tune design details Verify/optimize integration of components Commission production chain
InterConnect Bus
InterConnect Cards
Module support blocks
Module frameCooling pipe
Patch panel
Purpose:
The geometry has been verified for the three prototypes r.m.s. m for the position of the mechanical elements
TOB1) Now in Helsinki for the
commissioning of the production centre
2) Used for mechanical/thermal tests
neutron irradiation equivalent to LHC years several thermal cycles down to almost ºCtests of thermal performance with dummy modules + heat loads
3) Used for integration exercises and now ready for the “system test”
No problem has been found in the designThe call for tender for the CF parts has been sent out
Dimitri Pandoulas CMS Week 03.12.01 21
TEC Structure modified after the EDRTEC Structure modified after the EDR
Facilitate cable Facilitate cable bendingbending
Periscopes for Periscopes for alignmentalignment
TEC services go to the TEC services go to the patch panel on the patch panel on the bulkhead, to avoid thebulkhead, to avoid theexertion of forces on exertion of forces on the endcap properthe endcap proper
Back plate split into Back plate split into two parts two parts
TEC Wheel with holes
Ready to order overall TEC structure: wheels + connecting elements
Dimitri Pandoulas CMS Week 03.12.01 22
Cooling Path in Honeycomb Cooling Path in Honeycomb
TEC petal coolingTEC petal cooling
Titanium cooling pipes
and heat collectors
during insertion in
carbon fiber honeycomb
After Gluing CF Skin
Dimitri Pandoulas CMS Week 03.12.01 23
Cooling plant for 3 petals Cooling plant for 3 petals operational in Louvainoperational in Louvain
Setup to measure PetalDeformation after Cooldown
TEC petal coolingTEC petal cooling
Dimitri Pandoulas CMS Week 03.12.01 24
Project progressing well
• Procurement of mechanical structures underway
• Module Production imminent (starting with M200)
Project is on budget•Main concern: the availability of funds (7.4 MCHF missing Main concern: the availability of funds (7.4 MCHF missing and 1.9 MCHF not yet accorded) and 1.9 MCHF not yet accorded)
•No contingency for placing the remaining contracts No contingency for placing the remaining contracts for module production for module production
Present schedule aggressive (Tracker in CMS by spring 2006)
• Less risks on a more relaxed schedule
Dimitri Pandoulas CMS Week 03.12.01 25
PIX main feed-through (to be molded in place)
TEC main feed-through (to be molded in lab)
TEC MSC connectors
PIX pipe connectors
PIX MSC and OF connectors
TEC connectors coverings
PIX connectors covering
Bulkhead main structure
10 mm thick insulation rohacell panels (internal and external)
Fixation to the TST (8 places)
Re-enforcement ring + humidity barrier
The Bulkhead region
New Bulkhead design
Dimitri Pandoulas CMS Week 03.12.01 A
Prototype Work on TEC structure
Detail of disk fixationDetail of disk fixation
Portion of disk with petal mountingPortion of disk with petal mounting
Dimitri Pandoulas CMS Week 03.12.01 B
Costs for 2764 Ring 1-4 frames
FE779 carbon blocks 3* 6 kCHF 18 kCHFCutting into sheets 3*11 kCHF 33 kCHFtools 20 kCHFlaser cutting 2764*15 CHF 42 kCHFParylene coating 2764* 7 CHF 19 kCHFSum 132 kCHF
Costs for 4277 Ring 5-7 frames
FE779 carbon blocks 1* 6 kCHF 6 kCHFCutting into sheets 1*11 kCHF 11 kCHFlaser cutting 4277*7 CHF 30 kCHFK800 CFC prepreg 0.48*330 kCHF 158 kCHFAutoclaving 0.48*131 kCHF 63 kCHFWater jet cutting 0.48* 57 kCHF 27 kCHFAssembly 16 kCHFParylene coating 4277*7 CHF 30 kCHFSum 341 kCHF
Dimitri Pandoulas CMS Week 03.12.01 C
Dimitri Pandoulas CMS Week 03.12.01 D