ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All...

15
Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern Coalfields Limited Period : April 2015 - September 2015 Half Yearlv Compliance Renort for Madhaipur UGP (Cluster 12) Eastern Coalfields Limited EC Ref. No: J-11U5n612011-14-ll.(M) Dated: 9th February, 2015 Period: April, 2015 - September, 2015 I t ; Pandaveswar Area Are:, f: l:ir* :' ltiiv;!! S. No. General Condition Compliance 1. Grant of EC is only for non-forest area plus the forest area within the mining lease for which FC is available. No mining activities will be allowed in forest area for which FC is not ailable the followinq table AV AS S. No Name of Mine Forest Clearance not available (Ha.) 1 Jhanjra UGP (Expansion) 99.0 Ha. 2 Tilaboni UGP (Expansion) 64.8 Ha 3. RangamatiA UGP 91.0 Ha. 4. Sonepur-Bazari ocP 32.65 Ha Total 287.45 Ha Madhaipur Colliery is an Underground mining project. There is no forest land in the lease hold area of Madhaipur Colliery. 2. The maximum production from the mine at any given time shall not exceed the limit as prescribed in the EC. Production did not exceed at any point the specified EC capacity. Production details from April 2015 to September 2015 is given below: Half yearly Production (MT):34222 tonnes Peak Capacitv as per EC (MTY):0.21

Transcript of ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All...

Page 1: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

Half Yearlv Compliance Renort for Madhaipur UGP

(Cluster 12)

Eastern Coalfields Limited

EC Ref. No: J-11U5n612011-14-ll.(M) Dated: 9th February, 2015

Period: April, 2015 - September, 2015

It;

Pandaveswar Area

Are:, f: l:ir* :' ltiiv;!!

S.No.

General Condition Compliance

1. Grant of EC is only for non-forest area plusthe forest area within the mining lease forwhich FC is available. No mining activities willbe allowed in forest area for which FC is not

ailable the followinq tableAV AS

S.

NoName of Mine Forest Clearance

not available (Ha.)

1 Jhanjra UGP(Expansion)

99.0 Ha.

2 Tilaboni UGP(Expansion)

64.8 Ha

3. RangamatiAUGP

91.0 Ha.

4. Sonepur-BazariocP

32.65 Ha

Total 287.45 Ha

Madhaipur Colliery is an Underground miningproject. There is no forest land in the leasehold area of Madhaipur Colliery.

2. The maximum production from the mine atany given time shall not exceed the limit asprescribed in the EC.

Production did not exceed at any point thespecified EC capacity. Production details fromApril 2015 to September 2015 is given below:

Half yearly Production (MT):34222 tonnes

Peak Capacitv as per EC (MTY):0.21

Page 2: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

Nodal Offlebr (Environment)

Pandaveswar Area'A ' I'r

Dy. G.M.(M)

Month Production(tonnesl

April-15

May-L5

June - l-5

July - 15

August-L5

September-15

5349

48L8

5843

6066

6019

6L27

3. The validity of the EC is for the life of the Mineor as specified in the EIA Notification, 2006,whichever is earlier.

Noted and agreed.

4. All safety measures shall be taken as perCMR. 1957 & related Circulars

All safety measures are taken as per CMR,1957 and related Circulars

5. The production shall be within the sameMining Lease area.

with.Being complied

6. Coal shall be transported by rail only. Coaltransportation from mine to siding should beby conveyor belt. The loading to siding by payloaders into railway wagons.

Coal is transported by trucks covered bytarpaulin over fully metalled roads from mineto railway siding.

7. lndependent network of railway sidings insidecluster will be developed. Railway sidingsshould be constructed at the earliest and tillthen the proponent may use mechanicallycovered trucks for transportation of coal.

Independent railway siding for the minealready exists.

8. Three tier green belts shall be raised aroundthe railway sidings and along the road sidesto prevent dust and noise pollution.

Plantation along the railway siding and part ofcoal transport road exists. Creepers andclimbers along the existing plantation will alsobe planted upon. Wherever technicallyfeasible in the remaining part, avenueplantation along the coal transport road willalso be carried out.

9. Stowing and depillaring shall be as per therecommendations of the DGMS.

Stowing practice and depillaring is being doneas per the DGMS recommendations.

10. The proponent must comply with the RaniganjAction Plan. The unstable areas within the

No cases of instability of land occurred so far.There is no scope of subsidence as

Madhaipur Colliery

Page 3: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

1t

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

cluster will be brought under plantation afterthe population residing over these areas is

rehabilitated under the Master plan forRaniganj Coalfield to be implemented byADDA.

depillaring with stowing is practised in themine.

11. Trees with deep rooted system should beplanted so as to prevent soil erosion.

Madhaipur is an Underground Coal MiningProject. No soil erosion has been identified inthe mine leasehold area. Plantation workswill be carried out within the leasehold of themine throuqh the State Forest Department.

12. Proponent should plant additional 10 Ha.f/earover the next 10 years at various locations in

this Cluster.

Plantation is being done every year at variouslocations of mines under Pandaveswar Area

13. River/nallahs shall be desilted and resortedback to functional state.

Existing nallahs are being desilted regularly.No river exists within the leasehold.

14. Wildlife conservation plan be prepared andsubmitted to the MOEFCC with the approvalof the State Govt.

Not applicable

15. Proponent shall use high resolution image ofall clusters for evaluating land use, plantation

etc.

Baseline land-use study was based on highresolution satellite imagery of 2011. Furtherchanges in land use and plantation will betracked by carrying out satellite imaginary atevery three year' interval startinq 2015.

16. Separate drainage pattern be provided. Madhaipur is an Underground Coal MiningProject. Currently there is no need to provideseparate drainage system. However, it will beprovided whenever req u ired.

17. Sand stowing must be used as recommendedby CMPDI.

Sand Stowing practice is strictly followed asper the recommendations of CMPDI

18. Action plan for prevention and mitigation ofsubsidence be prepared and implemented.

Action plan for prevention and mitigation ofsubsidence is maintained and implemented.

19. The OC patches to be operated will becompletely filled=up after exhaustion ofreserves and reclaimed with plantation.

Madhaipur is an Underground Coal MiningProject. This condition is not applicable.

20. The OB shall be completely re-handled at the Madhaipur is an Underground Cpal Mining

'bN

Dy. G.M

APr#t?fila{ (civit} Madhaipur Colliery

Page 4: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

t

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

end of the mining. Project. This condition is not applicable.

21. There shall be no residual OB dump after themining.

Madhaipur is an Underground Coal MiningProject. This condition is not applicable.

22. After completion of mining activities, thesubsided areas shall be graded and plantedupon.

No subsidence case registered so far.

23. Coal Extraction shall also be optimized inareas where agricultural production is

continuing. Some pillars shall be left belowthe agricultural land. No depillaring & coalextraction should be carried out belowhabitation, H.T. Lines & beneath road. waterbodies.

For mining activities land acquired under CBAAct. Compensation as per Company's R & RPolicy is given to the land owners beforetaking possession of their land for miningoperation. No depillaring is done belowhabitation, H.T. Lines, Roads etc.

24 Rehabilitation of the households falling withinthis cluster to be carried out in two phaseswithin 10 years.

Not applicable

25. The land excavated after mining must bebrought back to original condition forag ricultural/plantation purpose.

Madhaipur is an Underground Coal MiningProject. No surface excavation is carried out.

26. Water discharged from the mine should be asgood as surface drinking water.

The discharged mine waters is fortnightlytested for parameters namely pH, TSS, TDS,Oil & Grease and COD and conforms to theMoEF Schedule-Vl Standards.The domestic water supplied conforms to thelS 10400 standards. Monitoring reports areenclosed in Annexure l.

27. Final mine void 453 Ha and depth will not bemore than 20-30m. The void area will beconverted into water body. The mine voidshould be used for pisciculture purpose.

Madhaipur is an Underground Coal MiningProject. No such void will be created withinthe leasehold.

28. Regular monitoring of subsidence movementon the surface over and around the workingarea and impact on natural drainage patter,water bodies, vegetation, structure, roads and

Regular monitoring of subsidence movementon the surface over and around the workingarea is done.

-bN

Nodal Offibbr (Environment)

Pandaveswar Ar^eaf |\ r oi''il

Madhaipur Colliery

Page 5: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

surroundings shall be continued till movementceases completely. In case of observation ofany high rate of subsidence movement,appropriate effective measures shall be takento avoid loss of life and material. Cracks shallbe effectively plugged with ballast and clayeysoil/suitable material.

29. lf subsidence is found exceeding thepermitted limits, then the landowners shall be

adequately compensated with mutualagreement of the landowners.

Surface land already acquired under CBA Actand probability of subsidence is nil asdepillaring with subsidence is practised.

30. Water sprinkling system shall be provided tocheck fugitive emissions from loadingoperations, conveyor system, haulage roads,transfer points, etc. Major approach roadsshall be black topped and properly

maintained.

Regular sprinkling of water is carried out overthe surface through fixed and mobilesprinklers to check fugitive emissions atRailway Siding, Transfer Points, and HaulageRoads etc. All the major approach roads andcoal transportation road is black topped andfully metalled.

31. The CSR cost should be Rs. 5 per Tonnes ofCoal produced which should be adjusted asper the annual inflation. Rs 1358 Lakh/annumshall be phased out after expiry of the currentmining lease and after reclamation of minedover area. The operating mines may beanalyzed and monitored for compliance ofconditions, bearing with movement of wildlifeand until such time they are closed/phasedout.

CSR works (with expenditure of at least twoper cent of the average net profits of thecompany made during the three immediatelypreceding financial years) are carried out asper Company's Act, 2013.CSR expenditure occurred in PandaveswarArea ECL from 01-04-2015 to 30-09-2015 isRs.1578631.00

32. The mining in the existing mines should bephased out after expiry of the current mininglease and after reclamation of mined overarea. The operating mines may be analyzedand monitored for compliance of conditions,

bearing with movement of wildlife and until

such time they are closed/phased out.

Wilt be followed as per the Mine Closure Plan.

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

Madhaipur Colliery

Page 6: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

33. Everybody in the core area should beprovided with mask for protection againstfugitive dust emissions.

Protection against dust is provided as per theRegulation 123 of CMR, 1957

34. Dust mask to be provided to everyoneworking in the mining area.

Protection against dust is provided as per theRegulation 123 of CMR, 1957

35. The supervisory staff should be provided withmask for protection against fugitive dustemissions.

Protection against dust is provided as per theRegulation 123 of CMR, 1957

36. People working in the core area should beperiodically tested for the lung diseases andthe burden of cost on account of working in

the coal mine area.

Periodic health check up for the workers inthe core areas are carried out regularly forPneumoconiosis, Permanent Hearing lossand other associated diseases.

37. The mining area should be surrounded bygreen belt having thick closed thick canopy ofthe tree cover.

Yearly plantation will be carried out over theavailable land in future.

38. Besides carrying out regular periodic healthcheck-up of their workers, 10% of the workersidentified from workforce engaged in activemining operations shall be subjected to healthcheck-up for occupational diseases andhearing impairment, if any, through an

specialized agency/institution within theDistricUState and the results reported to thisMinistry and to DGMS.

After the periodic health check up in last 6months, no such cases have been foundduring the period.

39. The embankment constructed along the riverboundary shall be of suitable dimensions andcritical patches shall be strengthened bystone pitching on the river front side andstabilized with plantation so as to withstandthe peak water flow and prevent mineinundation.

This condition is not applicable as no riverexists within the leasehold.

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

P6ndayeswar Area Madhaipur Colliery

Page 7: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 201540. There shall be no overflow of OB into the river

and into the agricultural fields and massiveplantation of native species shall be taken upin the area between the river and the project.

Madhaipur is an Underground Coai MiningProject. This condition is not applicable

41. Catch drains and siltation ponds ofappropriate size shall be constructed to arrestsilt and sediment flows from soil, OB andmineral dumps. The water so collected shallbe utilized regularly desilted for watering themine area, roads, green belt development,etc. The drains shall be regularly desilted andmaintained properly. Garland drains (size,gradient and length) and sump capacity shallbe designed keeping 50% safety margin overand above the peak sudden rainfall andmaximum discharge in the area adjoining themine site. Sump capacity shall also provideadequate retention period to allow propersettling of silt material.

Madhaipur is an Underground Coal MiningProject. This condition is not applicable

42. Garland drains (size, gradient and length)around the safety areas such as mine shaftand low lying areas and sump capacity shallbe designed keeping 50% safety margin overand above the peak sudden rainfall andmaximum discharge in the area adjoining themine sites. Sump capacity shall also provideadequate retention period to allow propersettling of silt material.

Not applicable

43. Dimension of the retaining wall at the toe ofthe dumps and OB benches within the mine tocheck run-off and siltation shall be based onthe rainfall data.

Madhaipur is an Underground Coal MiningProject. So, this condition is not applicable

44. Crushers at the CHP of adequate capacity forthe expansion project shall be operated withhigh crushing operations, conveyor system,

No CHP exists at Madhaipur UGP.

't\b

[l EiUi'#6? (civit] Madhaipur Colliery

Page 8: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015haulage roads, transfer points, etc.

45. Mine discharge water outside the Ml, shall bemonitored, particularly for TDS and treated toconform to prescribed levels before dischargeinto the natural environment.

Mine discharge water is analysed on regularbasis by CMPDIL and found to be within thespecified norms of CPCB. Fortnightlyenvironmental monitoring reports areenclosed.

46. Drills shall be wet operated. Being followed.

47. The project authorities shall undertake regularrepairing and tarring of roads used for mineraltransportation. A 3-tier green belt comprisingof a mix of native species shall be developedall along the major approach roads.

The roads are regularly repaired and properlytarred. Three tier plantation will be donealong the coal transportation road and aroundthe railway siding.

48. Controlled blasting shall be practiced with useof delay detonators and only during daytime.The mitigative measures for control of groundvibrations and to arrest the fly rocks andboulders shall be implemented.

Madhaipur is an Underground Coal MiningProject. This condition is not applicable.

49. A Progressive afforestation plan shall beimplemented covering an area of 6215.5 ha atthe end of mining, which includes reclaimedexternal OB dump area (404.74 ha), internaldump area (1856.54 ha) and Green belt land(364.57 ha) and in township located outsidethe lease by planting native species inconsultation with the local DFO/ AgricultureDepartment. The density of the trees shall bearound 2500 plants per ha. Massiveplantation shall be carried out in open spacesin and around the mine and a 3-tier avenueplantation along the main approach roads tothe mine.

Madhaipur is an Underground Coal MiningProject. Plantation work will be carried outwherever area is available for plantation.

50. The proponent should prepare restoration andreclamation plan for the degraded area. Theland be used in a productive and sustainablemanner.

Mine closure Plan has already been preparedfor the purpose. Restoration and reclamationshall be done accordingly.

51. Compensatory Ecological & Restoration ofwaste land, other deqraded land and OB

Compensatory ecological & restoration ofwaste land and other deqraded land will be

ffi6Nodal

(\"MDy

{l F 1e i'it;Madhaipur Colliery

Page 9: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

dumps in lieu of breaking open the land becarried out.

carried out if required. Since Madhaipur is anUnderground Mine, no OB Dumps exists inthe leasehold.

52. No ground water shall be used for miningoperations.

No ground water is being used for miningoperations.

53. Quarry area is 2325 Ha. Backfilled quarryarea of 1856 Ha shall be reclaimed withplantation by planting native plant species inconsultation with local DFO/AgricultureDepartment. The density of the trees shall bearound 2500 plants per ha.

Madhaipur is an Underground Coal MiningProject. This condition is not applicable.

54. Regular monitoring of groundwater level andquality shall be carried out by establishinga network of existing wells and construction ofnew peizometers. The monitoring forquantity shall be done four times a year inpre-monsoon (May), monsoon (August), post-monsoon (November) and winter (January)seasons and for quality in May. Data thuscollected shall be submitted to the Ministry ofEnvironment & Forests and to the CentralPollution Control Board quarterly within onemonth of monitorinq.

To be followed.

55 The Company shall put up artificialgroundwater recharge measures foraugmentation of groundwater resource if themonitoring indicates a declining trend ofgroundwater table. The project authoritiesshall meet water requirement of nearbyvillage(s) in case the village wells go dry dueto dewatering of mine.

Proposal for Rooftop rain water harvestingsystem in Pandaveswar Area Office is underprocess. No case of declining of ground watertable and drying of wells of villagers has beenfound.

56 Sewage treatment plant shall be installed inthe existing colony. ETP shall alsobe provided for workshop and CHPwastewater.

To be done

57 Land oustees shall be compensated as perthe norms laid out R&R Policy of CIL or theNational R&R Policy or R&R Policy of theState Government whichever id hiqher.

The compensation for land oustees will be asper the norms laid out in R&R Policy of ClL.

58 For monitoring land use pattern and for postmining land use, a time series of land usemaps, based on satellite imaqery (on a scale

Baseline land-use study was based on highresolution satellite imagery of 2011. Furtherchanges in land use and plantation will be

ll 16

Nodal

/bOffice nvirorim Dy.

Pandaveswar Area

.fi4 o.Iao ;

Madhaipur Colliery

Page 10: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Period April

Coalfields Limited

2015 - September 2015of 1: 5000) of the core zone and buffer zone,from the start of the project until end of minelife shall be prepared once in 3 years (for anyone particular season which is consistent inthe time series), and the report submitted toMOEF and its Regional office atBhubaneshwar.

tracked by carrying out satellite imagery atevery three years interval starting 2015..

59 A Final Mine Closure Plan along with detailsof Corpus Fund shall be submitted tothe Ministry of Environment, Forests &Climate Change within 6 months of grant ofEnvironmental Clearance.

Final Mine Closure Plan has been preparedfor Madhaipur UG Project by CMPDI.

60 The project authorities shall in consultationwith the Panchayats of the local villages andadministration identify socio-economic andwelfare measures under CSR to be carriedout over the balance life of the mine.

CSR works are being carried out time to timein accordance with the Company's Act, 2013.

61 Corporate Envi ronment Responsibility:a) The company shall have a well laid

down Environment Policy approved bythe Board of Directors.

"Corporate Environmental Policy 2012" ofCoal India Limited has already beenformulated.

b) The Environment Policy shall prescribefor standard operatingprocess/procedures to bring into focusany infringements/deviation/violation ofthe environmental or forestnorms/conditions.

"Corporate Environmental Policy 2012" ofCoal India Limited has prescribed standardoperating process/procedures to bring intofocus any infringements/deviation/violation ofthe environmental or forest norms/condition.

c) The hierarchical system orAdministrative Order of the company todeal with environmental issues and forensuring compliance with theenvironmental clearance conditionsshall be furnished.

The hierarchical system or AdministrativeOrder of the company to deal withenvironmental issues and for ensuringcompliance with the environmental clearanceconditions has been furnished in "CorporateEnvironmental Policy 2012" of Coal IndiaLimited

Madhaipur Colliery

Page 11: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

d) To have proper checks and balances,the company shall have a well laiddown system of reporting of non-compliances/violations ofenvironmental norms to the Board ofDirectors of the company and/orshareholders or stakeholders at large.

The company is having a well lald downsystem of reporting of non-compliances/violations of environmentalnorms to the Board of Directors of thecompany.

General GonditionsS.

No.General Gonditions Compliance

1 No change in mining technology and scope ofworking shall be made without prior approvalof the Ministry of Environment and Forests.

Being strictly followed.

2 No change in the calendar plan includingexcavation, quantum of mineral coal andwaste shall be made.

There shall be no change in the calendar planof ptoduction for quantum of mineral coal.

3 Four ambient air quality monitoring stationsshall be established in the core zone as wellas in the buffer zone for PMro, PM2.5, SO2,and NOx monitoring. Location of the stationsshall be decided based on the meteorologicaldata, topographical features andenvironmentally and ecologically sensitivetargets in consultation with the State PollutionControl Board. Monitoring of heavy metalssuch as Hg, As, Ni, Cd, Cr, etc. carried outatleast once in six months.

Air quality monitoring is carried out byCMPDIL on fortnightly basis and all desiredparameters are well within the prescribedlimits. Fortnightly monitoring reports areenclosed

4 Data on ambient air quality (PMro, PM2s, SO2and NOx) and heavy metals such as Hg, As,Ni, Cd, Cr and other monitoring shall beregularly submitted to the Ministry including itsconcerned Regional Office and to the StatePollution Control Board and the CentralPollution Control Board once in six months.Random variation of samples throughanalysis from independent laboratoriesrecognised under the EPA rules, 1986 shallbe furnished as part of comoliance reoort.

Air quality monitoring is carried out byCMPDIL fortnightly and data on ambient airquality shall be regularly submitted to theMinistry including its concerned RegionalOfficer and to the State Pollution ControlBoard and the Central Pollution Control Boardonce in six months.

5 Adequate measures shall be taken for controlof noise levels below 85 dBA in the workenvironment. Workers enqaqed in blastinq

Noise level monitoring is carried outCMPDIL on fortnightly basis. Noise levelalways been below 85 dBA. Reports

byhasare

ffiitt \

-Pah-da-veswar Area

Area Fn-qlns+r {CivillMadhaipur Colliery

Page 12: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

.rl

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

forlr 6

Pandaveswar Area

and drilling operations, operation of HEMM,etc shall be provided with ear pluqs/muffs.

enclosed

6 Industrial wastewater (workshop andwastewater from the mine) shall be properlycollected, treated so as to conform to thestandards prescribed under GSR 422 (E)dated lgthMay 1993 and 31't December1993 or as amended from time to time beforedischarge. Oil and grease trap shall beinstalled before discharge of workshopeffluents.

Mine discharge water samples are tested inlaboratory at CMPDI on fortnightly basis. Minewater quality conforms to the standardsprescribed under GSR 422(E) dated 19th May1993 and 31st December 1993.

7 Vehicular emissions shall be kept undercontrol and regularly monitored. Vehiclesused for transporting the mineral shall becovered with tarpaulins and optimally loaded.

Vehicular emissions are kept under controland regularly monitored. Coal transportationat Madhaipur UGP from mine to railway sidingis being done by tarpaulin covered trucks. Theloaded trucks are made wet at first and thencovered with taroaulins for transoortation.

8 Monitoring of environmental qualityparameters shall be carried out throughestablishment of adequate number and typeof pollution monitoring and analysisequipment in consultation with the StatePollution Control Board and data got analysisthrough a laboratory recognised under EPARules. 1986.

Monitoring of environmental parameters iscarried out fortnightly by CMPDIL. Laboratoryat CMPDIL, Asansol is having all necessaryfacilities.

I Personnel working in dusty areas shall wearprotective respiratory devices and they shallalso be provided with adequate training andinformation on safety and health aspects.

Protective respiratory devices are provided tothe workers near the dust generating sources.Adequate training and information on safetyand health aspects to workers is providedperiodicallv.

10 Occupational health surveillance programmeof the workers shall beundertaken periodically to observe anycontractions due to exposure to dust and totake corrective measures, if needed andrecords maintained thereof. The quality ofenvironment due to outsourcing and thehealth and safety issues of the outsourcedmanpower should be addressed by thecompanv while outsourcinq.

Periodic Medical Examination is carried outfor the workers periodically.

11 A separate environmental management cellwith suitable qualified personnel shall be setup under the control of a Senior Executive,

A separate environmental management cellwith qualified personnel exists in area office ofPandaveswar Area . The cell reports to the

Nodal Officdr (Environment)

Madhaipur Colliery

Page 13: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

ii

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

who will report directly to the Head of thecompanv.

General Manager Pandaveswar Area.'

12 The funds earmarked for environmentalprotection measures shall be kept in separateaccount and shall not be diverted for otherpurpose. Year-wise expenditure shall bereported to this Ministry and its RegionalOffice at Bhubaneshwar.

Funds for environmental protection as kept inbudget each year are not diverted for otherpurposes.

13 The Project authorities shall advertise at leastin two local newspapers widely circulatedaround the project, one of which shall be inthe vernacular language of the localityconcerned within seven days of the clearanceletter informing that the project has beenaccorded environmental clearance and a copyof the clearance letter is available with theState Pollution control Board and may also beseen at the website of the ministry ofEnvironment & Forests at htto://envfor.nic.in.

Being Complied with.

14 A copy of the environmental clearance lettershall be marked to concerned Panchayat/local NGO, if ?ry, from whom anysuggestion/representation has been receivedwhile processing the proposal. A copy of theclearance letter shall be displayed on thecompanv's website.

A forwarding letter for sending EC to theconcerned Panchayat is being attached in theannexure.Website address of the company iswww.easterncoal. gov. i n

15 A copy of the environmental clearance lettershall be shall also be displayed on thewebsite of the concerned State PollutionControl Board. The EC letter shall also bedisplayed at the Regional Office, DistrictIndustry Sector and Collector'sOfficeffehsildar's Office for 30 davs.

Environmental Clearance letter has been sentto the concerned State pollution ControlBoard and District Collector's Office.

16 The clearance letter shall be uploaded on thecompany's website. The compliance status ofthe stipulated environmental clearanceconditions shall also be uploaded by theproject authorities on their website andupdated at least once every six months so asto bring the same in public domain. Themonitoring data of environmental qualityparameter (air, water, noise and soil) andcritical pollutants such as PM10, PM2.5, SO2

Will be complied.

\\b\\

veswar Areaglieinie? (Civil)h t_ - -- t ---

Madhaipur Colliery

Page 14: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

rl

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

and Nox (ambient) and critical sectoralparameters shall also be displayed at theentrance of the project premises and mineoffice and in corporate office and oncompanv's website.

17 The project Proponent shall submit sixmonthly compliance reports on status ofcompliance of the stipulated environmentalclearance conditions (both in hard copy and ine-mail) to the respective Regional Office ofthe Ministry, respective Zonal Office's ofCPCB and the SPCB.

The compliance reports on status ofcompliance of the stipulated environmentalclearance conditions (both in hard copy and ine-mail) shall be submitted six monthly to therespective Regional Office of the Ministry,respective Zonal Offices of CPCB and theSPCB.

18 The Regional Office of this Ministry located inthe Region shall monitor compliance of thestipulated conditions. The Project authoritiesshall extend full cooperation to the office(s) ofthe Regional Office by furnishing the requisitedata/information/monitorinq reports.

Being followed.

19 The Environmental Statement for eachfinancial year ending 31 March in For-V ismandated to be submitted by the projectproponent for the concerned State PollutionControl Board as prescribed under theEnvironment (Protection) Rules, 1986, asamended subsequently, shall also beuploaded on the company's website alongwith the status of compliance of EC conditionsand shall be sent to the respective RegionalOffices of the MoEFCC bv e-mail.

Complied with.

MadhPandaveswar Area

^,f. 1 i t.9" l:-ll'rti

Nodal Officer (Environment)

Page 15: ofeasterncoal.gov.in/notices/environment/20160311madhaipur.pdfCMR. 1957 & related Circulars All safety measures are taken as per CMR, 1957 and related Circulars 5. The production shall

Half Yearly ECComplicance Report, MadhaipurColliery, PandaveswarArea (Cluster 12), Eastern

Coalfields Limited

Period : April 2015 - September 2015

Annexure I

MONITORING REPORTS

Annexure ll

Letter given to Goqla Gram Panchavat regardins the approval of environmental clearance

Pandaveswar Area

Ai.f - i-.ineer (Ciril)

Pall.toror,,,li Aiga

Madhaipur Colliery