Project category Requested Completed Pending Pending due to

# of Expansion sites 3 1 2 Media not available

# of Rollout sites 2 1 1 Media not available

# of Swap sites - - - -

Page 2: CMPak OMCR Daily Report_Day_08 NOV 2012

8/13/2019 CMPak OMCR Daily Report_Day_08 NOV 2012

http://slidepdf.com/reader/full/cmpak-omcr-daily-reportday08-nov-2012 2/7

Project Category:

S No.Site ID-Site

Name

Current

Configuration

Proposed

ConfigurationBSC

E1 requirement

met

1 1514 S000_444 S200_666 HYDBSC19 No

2 1055 No

3 1126 S000_440 S000-660 HYDBSC20 Yes

4

5

Project Category:

S No.Site ID-Site

Name

Current

ConfigurationBSC E1 requirement met

On site

caller/Subcon

1 2386 - - No Arshad (Highrise)

2 3417 S000_444 HYDBS15 Yes

3

4

5

Project Category:

S No.Site ID-Site

Name

Current

ConfigurationBSC E1 requirement met

On site

caller/Subcon

TOP Issues & Ris

No.

Top1

Top2

Top3

Rollout

Issue/Risk Description

Swap

 CMPak OMCR Daily ReExpansion

第 2 页,共 7 页

Page 3: CMPak OMCR Daily Report_Day_08 NOV 2012

8/13/2019 CMPak OMCR Daily Report_Day_08 NOV 2012

http://slidepdf.com/reader/full/cmpak-omcr-daily-reportday08-nov-2012 3/7

On site caller/Subcon Caller no.Expansion Done-

Hard/SoftRemarks/Expansion not done due to

Khurram (Netkom) 03346261303 No E1 not available / Link capacity issue

Raheel/Syed (Netkom) 03349444009 No E1 not available

Ayaz (EES) 03332542143 Yes / Hard Site expanded to S000-660

Caller no.Integration

Done

No

Yes

Caller no.Cutover

Completed

Issue OwnerCurrent

Handler

Target resolution

dateIssue Status

Remarks

  port_Day

Remarks

E1 not available

Site integrated in HYDBSC15 today. Site is in halted mode

第 3 页,共 7 页

Page 4: CMPak OMCR Daily Report_Day_08 NOV 2012

8/13/2019 CMPak OMCR Daily Report_Day_08 NOV 2012

http://slidepdf.com/reader/full/cmpak-omcr-daily-reportday08-nov-2012 4/7

Project Category:

S No. Site ID/Site Name Caller Name/Dept-Company

1 1608 Waqar Abro (Huawei)

2 1593 Dilshad (CMPAK)

3 2386 Arshad (Highrise)

4 1898,0253 Shafeeq (CMPAK)

5 0949 Shakoor (Interses)

6 0949 Asif Hameed (Huawei)

7 1055 Raheel/Syed (Netkom)

8 0811 Shafeequrehman (CMPAK)

9 1125 Zia (CMPAK)

10 0257,1057 Shafeequrehman (CMPAK)

11 3418 Safeel (Huawei)

12 1417 Aziz (Netkom)

13 1124 Waqar Abro (Huawei)

14 All BSCs Alizee (Huawei)

15 1034 Rizwan (CMPAK)

16 1124 Abdullah (EES)

17 Multiple Sites Abdus Sami (CMPAK)

18 0074 Shafiq-ur-Rehman (CMPAK)

19 1514 Najam (Netkom)

20 1608 Wakeel

21 2,042 Kamran/Mujtaba (Huawei)

22 Multiple Sites Atif/Majid (Ericsson)

 CMPak O

Auxillary

Page 5: CMPak OMCR Daily Report_Day_08 NOV 2012

8/13/2019 CMPak OMCR Daily Report_Day_08 NOV 2012

http://slidepdf.com/reader/full/cmpak-omcr-daily-reportday08-nov-2012 5/7

Reason for call

Alarms verification

Alarms verification

E1 verification

Alarms verification / Change polarity of alarms

Alarms verification

Alarms verification

E1 verification

Alarms verification

Change polarity of alarms

Alarms verification

Site status verification

E1 verification

Site status verification

Query CFG exports and License Usage

Site status verification

Site status verification

WO for software expansion of 33 cells

Alarms verification

E1 verification

Alarms verification

Alarms verification

E1 verification

CR Daily Report_Day

Page 6: CMPak OMCR Daily Report_Day_08 NOV 2012

8/13/2019 CMPak OMCR Daily Report_Day_08 NOV 2012

http://slidepdf.com/reader/full/cmpak-omcr-daily-reportday08-nov-2012 6/7

Page 7: CMPak OMCR Daily Report_Day_08 NOV 2012

8/13/2019 CMPak OMCR Daily Report_Day_08 NOV 2012

http://slidepdf.com/reader/full/cmpak-omcr-daily-reportday08-nov-2012 7/7