Date: Oct. 22nd, 2013 The Company Profile Chiv Meang Huot Bore Pile & Water Well Drilling services with over 20 years of experiences Services: No 182, St. 598, Sangkat Phnom Penh Thmey, Khan Sen Sok, Phnom Penh

Transcript of Cmh bp profile 2013

Page 1: Cmh bp profile 2013

Date: Oct. 22nd, 2013

The Company Profile

Chiv Meang Huot Bore Pile & Water Well Drilling services with over 20 years of experiences

Services:

No 182, St. 598, Sangkat Phnom Penh Thmey, Khan Sen Sok, Phnom Penh

Page 2: Cmh bp profile 2013

Table of contents:

Page: 03————————————————Introduction

Page: 04————————————————History

Page: 05————————————————Projects

Page: 06————————————————Projects

Page: 07————————————————Projects

Page: 08————————————————Projects

Page: 09————————————————Projects

Page: 10————————————————Water Well Projects

Page: 11————————————————Drill rigs & equipment

Page: 12————————————————Drill rigs & equipment

Page: 13————————————————Drill rigs & equipment

Page: 14————————————————Conclusion

Page: 15————————————————Contacts

Page 3: Cmh bp profile 2013

Page 3

More than the right

equipment, experience and

technology. It takes the right

people to succeed the hard

work that almost nobody can

do within the country, drill pile

into hard rock formation. For

nearly 20 years, our people

have made the difference.

WELCOME TO CMH BP & CONSTRUCTION

Page 4: Cmh bp profile 2013

Page 4

About us

HISTORY

For over 20 years, Drilling Service Company has been a specialty contractor with

a full range of underground construction services, including drilled shaft foundations

for story houses, villas, hotels, bridges, and tall condo. Within those drilled work, we

have used many drilling methods, such as, auger and mud reverse circulation drilling

for soil areas. We use core barrel drilling, dropping hammer, and DTH hammer for

drilling hard rock areas.

From the simplest drilled shaft to the most difficult turnkey project, we have the

right equipment, experience and technology for the job. But the true foundation of our

success is a reputation for getting the job done, no matter what it takes. Above all, our

people make the difference.

Our company was founded in 1990 by Mr. Chiv Meang Huot. In 1993, CMH with

four of his son and longtime employee, Mr. Lock. CMH, started a company then passed

on his four son Mr. Por Hong, Por Hak, Por Hai, and Por Houng to carry on.

Our headquarters are located on #182 St. 598, Sangkat Phnom Penh thmei,

Khan sensok, Phnom Penh. Most of our work occurs within a 250-km radius, though

recent projects have taken our crews to the far corners of Kompongsom province,

Steng Hav.

MANAGEMENT

Our management team is led by Hong, Hak, Hai, and Houng. Each executive

employs a team approach to management for major issues involving the company.

The company employs dozens of highly trained professionals and some

employees have been with the company for 10 to 20 years. Drilling Service's

philosophy is to: treat our employees, clients, subcontractors and owners with respect;

provide quality work and competitive pricing; and complete every project on time and

on budget.

Page 5: Cmh bp profile 2013

Page 5

Drilling Projects

Bore Pile for TBR company at

Kompongsom province. Oct.

2010...Diameter from 600mm to

1000mm, 23 meters deep with 5m

into rock layers.

Installing Reinforcement

Steel

Bored Pile Concreting Work

Rock drilling DTH & Air Drive

Method

20 stories hotel at Borei Kuch Asia

Rock Core Barrel

Method

Rock Bored Hole

Page 6: Cmh bp profile 2013

Page 6

Mud Circulation Drilling

Methos

Rock Drilling Free Fall Hammer

Methods

Drilling Projects

Bore Pile for China bridges construction at Thmosor, Koh

kong province. Jan. 2012...diameter 1200mm, 25 to 30

meters with 20m to 25m into hard rock layers.

Page 7: Cmh bp profile 2013

Page 7

Drilling Projects

On Aug. 2012 we were subcontracted with Chinese construction company to drill

Pile for big China Power Plant at StengHav, Kompongsom province. diameter

500mm to 700mm...and depth from 15 to 30 meters with 1m into hard rock layers.

Page 8: Cmh bp profile 2013

Page 8

Free Fall Hammer

Drilling Projects

On Jan, 2013. Super pile drilled for Tang & Chang Investment near 42nd floor sky scraper, China hospital. Diameter of 1200mm with total depth of 47m and 11m into hard rock layers.

Page 9: Cmh bp profile 2013

Page 9

Drilling Projects

Casino and resort pile drilled for

Big House construction company

at Victory Heel, Kompongsom

province. Diameter of 400mm

with total depth of 16m and 13m

into hard rock layers.

Page 10: Cmh bp profile 2013

Page 10

Water Well Drilling Projects

Installing PVC pipes after drilled completed We are also expert in water well

drilling and service as well. We would

like to make you and your family

water independant. If you are a local

farmer who needs irrigation water or

a homeowner who is tired of over

treated water and high water bills we

can help. Oh and service...we deal in

all major brands of pumps and have

one of the best service trucks

available to serve you.

We supply all kind of

original AFRIDAV DEEP

WELL HANDPUM and

spare parts directly

from INDIA.

Page 11: Cmh bp profile 2013

Page 11 Drilling Rigs & Equipment

MD-HR150, DRILL DIAMETERUPTO 1500MM, DEPTH 45M

ZILL131-HR80, DRILL DIAMETER UPTO Ø800MM, DEPTH 50M( 300M WITH Ø150)

BULL-HR120, MAX DRILL DIAMETER Ø1200MM DEPTH 60M( 120M WITH Ø500)

Page 11

MD-HR150, DRILL DIAMETERUPTO 1500MM, DEPTH 45M

Page 12: Cmh bp profile 2013

Page 12

Drilling Rigs & Equipment

MD-80HR, MAX DRILL DIAMETER 800MM DEPTH 35M

ROCK DRILLING MACHINE, MAX DRILL Ø1500MM, DEPTH 100M

AIR DRIVEN DTH CLUSTER HAMMER, DIAMETER Ø300MM TO Ø1000MM

3T VIBRATING HAMMER

ATLAS COPCO XRH350 AIR COMPRESSOR

AIR COMPRESSOR

SULLAIR 1600H

Page 13: Cmh bp profile 2013

Drilling rigs & Equipment

EXCARVATOR PC120, KOMATSU JAPAN

SAMSUNG AMEICA 35T CRANE

DRILLING BUCKET AND DRILLING AUGER DIAMETER Ø400MM TO Ø1500MM

BENTONITE OR MUD TANKS CONCRETE FILLING TOOLS

Page 13

EXCARVATOR EX120, HITACHI JAPAN

Page 14: Cmh bp profile 2013

WHAT CAUSE THESE BUILDINGS TO

FALL DOWN ? THERE WOULD BE MANY

REASONS, BUT THE ONE AND ONLY

IMPORTANT REASON IS FAIL TO BUILD

STRONG FOUNDATION. SO BEFORE YOU

DECIDE TO BUILD YOUR FUTURE BUILDING,

PLEASE FOCUS MORE INTO FOUNDATION

QUALITY. WEAK FOUNDATION WILL DESTROY

ALL THE BUILDING CONSTRUCTION WORKS

AND WASTE ALL YOUR MONEY, TIME, AND

MAY ALSO KILL LIVES.

Conclusions