CMER Research Update George McFadden CMER Study Implementation Coordinator.

16
CMER Research Update George McFadden CMER Study Implementation Coordinator

Transcript of CMER Research Update George McFadden CMER Study Implementation Coordinator.

Page 1: CMER Research Update George McFadden CMER Study Implementation Coordinator.

CMER Research Update

George McFadden

CMER Study Implementation Coordinator

Page 2: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Favorite Oxymorons

• Military Intelligence

• Legal Services

• Government Worker

• Corporate Ethics

• Microsoft Works

Page 3: CMER Research Update George McFadden CMER Study Implementation Coordinator.

More Oxymorons?

• CMER Cooperator

• CMER Priorities

• CMER Research

• Hardwood Conversion Study

Page 4: CMER Research Update George McFadden CMER Study Implementation Coordinator.

CMER Cooperators

• Federal Agencies

• State Agencies

• Tribal Organizations

• Local Governments

• Landowners

Page 5: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Cooperator Expectations

• Scientific Credibility

• Fiscal Accountability

• Inform Adaptive Management Process

Page 6: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Project Prioritization

Type N Buffer Integrity and Function

Eastside Type F Desired Future Conditions

Type N Amphibian Response

Road Basin-scale Effectiveness Monitoring

Type F Statewide Prescription Monitoring

Mass Wasting Effectiveness Monitoring

Eastside Type F Stream Temperature

Wetlands Revegetation Effectiveness

Page 7: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Project Prioritization (Cont.)

Road Site-scale Effectiveness Monitoring

Hardwood Conversion

Wetland Mitigation

Fish Passage Effectiveness Monitoring

Wildlife Program

WMZ Effectiveness Monitoring

CMZ Effectiveness Monitoring

Forest Chemicals

Page 8: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Active CMER Research Projects

• Bull Trout Overlay– Solar Radiation / Effective Shade

 • RMZ Resampling • Amphibian Sampling Methods

• Hardwood Conversion Project– Hardwood Conversion Temperature Study

 Darius Kinsey Photograph

Page 9: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Active CMER Research Projects• Eastern Washington Large Woody Debris

Dynamics

 • Landform Hazard Classification System &

Mapping Protocols

 • Water Typing Field Validation

 • Eastside Nomograph Project 

                            

Sherry Ballard © California Academy of Sciences

Page 10: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Active CMER Research Projects

• Type N Buffer Effectiveness Monitoring– Type N Buffer Photogrammetric Evaluation

• Eastern Washington Last Fish Habitat Data Collection

• Road Surface Erosion Model Update • West-side Water Typing Field Validation 

Darius Kinsey Photograph

Page 11: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Active CMER Research Projects

• Forested Wetlands Regeneration Developmental Project

 • Tailed Frog Meta-analysis • Red Alder Growth & Yield Model

• Eastern Washington Large Woody Debris Dynamics

 Albert P. Bekker © California Academy of Sciences

Page 12: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Hardwood Conversion Study

• Demonstration Project

• Site Selection– Hardwood Dominated Stands– Evidence of Previous Conifer Stand

• Variables Evaluated– Regeneration Success– Stream Temperature– Regeneration Costs and Methods

Page 13: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Hardwood Conversion Study Strategy

• Implement study as alternate plans

• Landowners will determine:– Reforestation methodology, species, density– Vegetation control methods and frequency – Animal control methods and frequency

• Study will quantify both ecological attributes and economic outcomes

Page 14: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Landowner Requirements

• No cutting closer than 25 feet of stream

• Existing conifers in RMZ will not be cut

• Site must be successfully regenerated

Page 15: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Expected Results

• Conversion Cost Analysis

• Document Successful Silvicultural Prescriptions

• Pre- and Post-Harvest Stream Temperature

• Inform Adaptive Management Process

Page 16: CMER Research Update George McFadden CMER Study Implementation Coordinator.

Summary