BackgroundBackground
• Mission & Vision• Brief History of
Agency• Clients Served• Organization
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 3
MissionMission
Architecture, Engineering and Constructionprovides quality and cost effective facilities planning, design and construction services to support the university mission and community.
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 4
VisionVisionArchitecture, Engineering and Construction is a model facilities organization dedicated to improve the built environment supporting the university goal of national pre-eminence in higher education. We are a diverse, professional team with a strong commitment to the customer, efficiently providing safe quality facilities.
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 5
Department ObjectivesDepartment Objectives
• User satisfaction• Quality, functional,
maintainable facilities• Timely and efficient
response• Minimal disruption to
the campus• Compliance with
university, federal, state and local policies and codes
• Fiscal responsibility
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 6
HistoryHistory
• Department established at UM in 1985.
• Obtained delegated construction autonomy from MD DGS in 1988.
• Obtained legislated construction autonomy in 1993.
• Department reorganized and became part of Facilities Management organization in 1998
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 7
UM System with Two Service CentersUM System with Two Service Centers
TUUBUMBCSCUMBC
UMBResponsibility
UMCPResponsibility
FSUUMBI
UMCPUSM
UMUCBSU
UMCESSU
UMES
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 8
OrganizationOrganization
Director(2 FTEs)
Support Services(13 FTEs)
Project Management(20 FTEs)
Design/ConstructionQA
(20 FTEs)
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 9
Capital ProgramCapital Program
• ~ $150M Annual Expenditures
• ~ 30 projects in design or construction
• ~ 20 projects in close-out• ~ $900M Capital Program
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 10
Project Delivery MethodsProject Delivery Methods
• CM at Risk• Design/Build• General Contractor
1
2
3
4
1. Holloway Hall 2. Commons Dining Hall 3. Henson Hall 4. Teachers Education and Technology Complex
Denotes AEC Project
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 11
Contract ToolsContract Tools
• Pre-Construction Services• Full service A/E• IDC • PM/CM Support
• Construction Services• CM at Risk• GC• Inspection/Testing
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 12
Contracting Methodology
Most maintenanceand simpleconstruction
Inappropriate Inappropriate
More complexmaintenance andconstruction
Small straight-forwardconstruction
Generally notapplicable
PreferredMost commonExtremelycomplex
Low Bid
Multi-Step Bid
RFP
Design Bid Design Build CM with GMP
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 13
Construction Management ApproachConstruction Management Approach
• Who: In-house and Contract CM Staff
• What:• Budgeting• Design Contract
Management• Construction Contract
Management• How: SOPs,
Standards, Checklists, Experience, Effective Reporting
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 14
“Top Five” CM Challenges“Top Five” CM Challenges
• Hard Budgets Set Years Before Design
• Lots of constituencies• Quality of
construction documents
• Resolving changes quickly
• Closing out projects
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 15
Keys to SuccessKeys to Success• Build in and guard
contingencies• Get key stakeholders on
board early• Communicate early and
often• Maintain schedules• Check and recheck
drawings• Keep on top of change
orders, construction administration
• Do the right thing for the client
July 15,2004Presentation to Washington DC Chapters of SAME, CMAA, and NCHES 16
Contract Support OpportunitiesContract Support Opportunities
• Pre-Construction Services• Full service A/E• IDC • PM/CM Support
• Construction Services• CM at Risk• GC• Inspection/Testing