CM document discussion

8
LHCb Computing CM document discussion

description

CM document discussion. Clarifications, e.g. on trigger simulation. Made changes to text to hopefully clarify some of the questions How to iterate?. Work in Progress – e.g. Data Placement. Difficult to be precise about work in progress, prefer to stay vague than make false promises. MDST.DST. - PowerPoint PPT Presentation

Transcript of CM document discussion

Page 1: CM document discussion

LHCbComputing

CM document discussion

Page 2: CM document discussion

2

Clarifications, e.g. on trigger simulation

Made changes to text to hopefully clarify some of the questionsHow to iterate?

Page 3: CM document discussion

3

Work in Progress – e.g. Data Placement

Difficult to be precise aboutwork in progress, prefer tostay vague than make falsepromises

Page 4: CM document discussion

4

MDST.DST

m MDST.DST (was ALL.DST) intended to facilitate migration to MDSTo This is work in progresso Cost is temporary, will be removed when migration is

completeP Calling it “indifference” seems harsh

Page 5: CM document discussion

5

Cost of data preservation

Page 6: CM document discussion

6

Simulation

Page 7: CM document discussion

7

Simulation

m Two questions:o What are ideas for reducing LHCb simulation time

P Answer is improved use of transport cuts, adapt granularity of detector to precision required, do not simulate spillover events in detectors that are insensitive to it (Calo, Muon)

P Work in progress, and details too technical to be described briefly

o Common improvements in G4, vectorisation etc.P Indeed. Already described in common chapter. Does it

need to be expanded?

Page 8: CM document discussion

8

Resources estimates