Clubs & Societies 3 Year Plan
• Preparing to go on a Road trip?• Where are we now?• Where do we want to be in 3 years time?• How do we get there?• In a C&S context where are the deficits
and inadequacies that stifle our development?
• How can we tackle these as part of our Road Map for the next 3 years
Clubs & Societies 3 Year Plan
• Active Engagement with C&S / ULSU
• Educate you on the process
• Empower
• Stimulate discussion
• Stimulate creative thinking
• Develop the concepts
• Formulate the plan
Clubs & Societies 3 Year Plan
• Where are we now?
• Problems with pitches
• Problems with Climbing Wall for OPC (Pre date’s 2004)
• Problems with the Diving Pit for Sub Aqua Club (2004)
• Capacity Problems with the Student Centre
Clubs & Societies 3 Year Plan
• Who else wants to go on this Road Trip?
• The rising tide can lift all boats
• In 2013 the Student Levy ends and as an annual figure that’s €700,000 that potentially is available
Clubs & Societies 3 Year Plan
• Things we learnt from the Boathouse Project that still need to be resolved
• Things we need to be addressed with any future project
• Tighter involvement in decision making with design team
• Much tighter legal protections via MOU• Full access to accounts and financials
throughout the project