Transcript of Closed Loop
Agenda
• What is a Closed Loop Programme?
• A collaborative approach
• Experience from the Sydney 2000 Olympics
• The Australian legacy
• Case Study – The MCG
• ‘Closing the Loop’ in the UK
• Turnstile 21
• Closed Loop Organics
• Research on material inputs
Experience from the Sydney 2000 Olympics
• Largest recycling programme at any Olympic Games to date
• Over 70% Landfill diversion
Case Study – The MCG
• Iconic global venue
• 80 events per year
• Serving 4 million customers
• Multiple food service outlets
• PS Cup replaced with rPET Cup
• Recycling rate c.72%
• MCG reclaim approximately: – 1000 tonnes of recyclable material a year
– Saving more than 16 million litres of water &
– 500 tonnes of carbon dioxide emissions
‘Closing the Loop’ in the UK
• Insufficient infrastructure
• Closed Loop reprocessing facility in East London, Dagenham
• UK’s first food grade plastics recycler
• PET & HDPE to rPET & rHDPE
• 35,000 tonnes pa capacity (rising to 65,000 in 2012)
2011 Winner, Recycling & Waste Management Business of the Year
Research on material inputs
• Material inputs at UK sporting venues & events
– Which stakeholders are responsible for buying inputs?
– What materials are being used?
– How many products are being used?
– Focus on cold beverage cups
• Report
• Recommendations