Close-out Report Pics Xx
Transcript of Close-out Report Pics Xx
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 1/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
P R O J E C T CLOSE OUT R E P O R T
DAANG HARI
MASTERPIECE ASIA PROPERTIES INC.
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 2/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
TABLE OF CONTENTS
EXECUTIVE SUMMARY
1. PROJECT BACKGROUND
1.1 Pre-Con!r"#!$on P%&e
• Plans & Specifications
• Procurement Schedule (Bidding & Award)
1.' Con!r"#!$on P%&e
• Project Milestone & Highlights
• Construction Schedule vs Actual
• utstanding !ssues
• "eference Attachments
'.( Po!-Con!r"#!$on P%&e
• SM Monitoring & Status
• Hand#over of residential units and common areas status
'. CONTRACT CLOSE-OUT STATUS
'.1 Te#%n$#&)
• $echnical Su%mittal Status
• $esting & Commissioning Status
• Certificate of Completion & Acceptance Summar and status
'.1 F$n&n#$&)
• 'A & C Summar and Status
• Billing Summar and pending claims status
(. PROJECT TURNOVER FILES * RELEVANT INFORMATION
• Project $eam irector
• Project act Sheet
• Copies of *overnment Permits & +icences
• Site !nstruction +og
•
"e,uest for !nformation +og• $echnical Su%mittal +og
• Construction Bulletin +og
+. PROJECT PHOTOGRAPHS ,BEFORE * AFTER HANDOVER
. REFERENCE ATTACHMENTS
• Anne- A . rawing Control +og
• Anne- B . Procurement Schedule
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 3/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 4/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
$his report highlights the project details3 milestones3 accomplishments and status for
$he Beacon . "oces $ower project wherein Asian $echnicon Managers & Consultants
!nc has %een engaged as Project Managers0
All data and information stipulated on this report will %e part of $urnover ocuments inaccordance to the project close#out re,uirements for reference and guidance of the
wner0
Asian $echnicon Managers & Consultants3 !nc0 and the Beacon $eam are grateful to
have wor/ed with 4ew Pacific "esources Management !nc0 together with *eo#1state
evelopment Corporation and are /een3 given the opportunit3 to %e of service with ou
in the future0
Congratulations and *ood +uc/ to 4ew Pacific "esources Management !nc0 and *eo#
1state evelopment Corporation5
1. PROJECT BACKGROUND
$he Starmall Prima aang Hari is a high#end mall constructed in Bacoor3 Cavite3
Philippines0 $he Starmall Prima aang Hari is owned and developed % Masterpiece
Asia Properties !nc0
!t was designed % AS6A esign Partner (Principal Architect) with the engineering trades
A0C0 ng Consulting !nc0 (Structural esign)3 0+ +agman 1ngineering (Airconditioning
& 7entilation esign) 3 M0A Ali- & Partners (1lectrical esign)3 0+ igueroa & Associates(Plum%ing & ire Protection esign) and Meinhardt Philippines !nc (a8ade and 1levator
Consultant)0 $he interior design of lo%%ies and residential hallwas was designed %
Asuncion Berenguer !nc0 and landscape designed % 10A Aurelio0
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 5/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 6/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 7/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 8/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 9/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 10/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 11/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 12/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 13/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 14/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 15/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
D&8
riginall3 the architectural pac/age which scope of wor/s are masonr3 installation of
doors3 jam%s3 tiles and finishing hardwares was awarded to Konstra/ !nternational !nc0
(K!!)0 $he had introduced the Smart %loc/s sstem in lieu of conventional CHB sstem
which draws the attention of the wner and later paved the wa to the award of the
architectural pac/age0
Since the start3 K!! has shown non#compliance to the project re,uirements resulted to
the late commencement which was supposedl ;: Ma ;>>=0 Also3 the smart %loc/sI
re,uired concrete strength of >>> psi which was mar/eted and the %asis of the award
were not mostl achieved resulting to the rejection of the %loc/s0 $his caused the delas
in the ch% installation since the re,uired ,uantit of ch% to complete the floors was notachieved0 !t is then the wner decided and agreed to lower the concrete strength and
treat the installation as conventional tpe so as not hamper the other trade wor/s and
entail more delas0 $he Project Manager issued notices to cope up delas to K!! several
times for them to address their delas0
n ;; Septem%er ;>>=3 the Project Manager serves the notice of termination to K!! due
to the following reasonsE
•+ow productivit rates
• 2ndermanned site crew
• Masons unfit to install Smart %loc/s
• !nefficient construction methodolog
• ailure of Smart %loc/s to attain strength of at least ;>>> psi
• Poor wor/manship
As a resolution on the matters at hand3 the wner decided to give chance to K!! to
perform with the following agreement to witE
• 11! committed to provide Konstra/ to have e-clusive use of tower crane for its
masonr materials (Smart %loc/s3 sand3 Cement3 re%ars and s/im coat) dail
lifting re,uirement from =>>A0M to :;>>4043 including times that the crane is
free from lifting activities of other su%#contractors on site0 $he commitment will
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 16/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
ta/e effect on : cto%er ;>>=0 !n addition3 #hour utiliDation of the construction
elevator was also agreed % the %od to %e utiliDed in hauling masonr materials
with an appro-imate com%ined output of :3>> pcs per da0
• Konstra/ committed to deliver two (;) truc/s of := palettes each with > pcs0
(>?> pcs0) Smart %loc/s a da and %e unloaded in pallet full secured with metal
strap0 +ifting will %e made using steel %as/et going to the designated floor and %e
pulled in % a palette truc/ from the platformNloading %a0
• 11! to install one (:) additional unit of loading %a which Konstra/ will utiliDe to
e-pedite lifting3 and which will %e provided free of charge % *1C0
• Konstra/ will mo%iliDe full#time Project Manager and a superintendent who will %e
in#charge of managing the project and site activities3 respectivel0 +i/ewise3 a
person who would monitor and supervise deliveries3 hauling and lifting of all
masonr materials was also committed % Konstra/0
• $he %od concurred that accomplishment will %e monitored on a wee/l %asis on
wee/l site construction meeting0 As such3 *1C and Konstra/ agreed that wor/
slippage must not e-ceed :JL of specific wor/ itemE such slippage is given two
(;) wee/s to remed0 !f such deficienc is not remedied in ; wee/s time3 then
immediate termination of contract will %e imposed0 However3 should such
deficienc %e resolved3 then the contract continues and accomplishment will %e
evaluated ever ; wee/s0
• $he %od agreed that stiffener columns will not %e re,uired for smart %loc/s with
;3>>> psi compressive strength and will start on :J th floor and up0 !f succeeding
deliveries fail the compressive strength re,uirement3 Konstra/ will revert to
conventional sstem and provide lintel %eams and stiffener columns where
needed0 4o floor will have mi-ed masonr sstemE it will %e designated as either
conventional or Smart masonr sstem depending on compressive test results0
• Konstra/ to su%mit wor/ se,uenceNmethodolog for all activities that will %e
implemented in all floors on cto%er :?3 ;>:>0
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 17/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 18/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 19/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 20/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 21/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
> une ;>:; (Cal0 as)
Aluminum *lass oors and 'indows pac/age was awarded to Bradnams oors &
'indows3 Phils as earl as >= Ma ;>>=0 However with the wnerIs decision to re#hire
the services of Meinhardt Phils !nc as fa8ade consultant to approve technical su%mittals
and change in specifications of aluminum frames and glass3 the contract timeta%le was
amended with the following milestone dates
Commencement ate >; anuar ;>:>
'atertightness of $ower (N#?J) > 4ovem%er ;>:>
'atertightness of *round loor and Podium > ecem%er ;>:>
Completion of $esting and Commissioning > anuar ;>::
Completion ate ; Ma ;>::
$he revised contract timeta%le did not materialiDe due to dela on Performance Moc/#up
$est (PM2) which is the pre#re,uisite on the mass fa%rication of the windows and doors0
PM2 test was supposed to %e conducted > March ;>:> et the actual PM2 test was
conducted ul ;>:>0 $his was due to dela of material deliver3 die preparation3 failure
on the initial PM2 test and re#testing0 irst %atch of windows were onl delivered
Septem%er ;>:> and installation of windows started on the same month0
A##o20)$%2en! !o D&!e
As of : August ;>:;3 the completion of the wor/s for Beacon $ower : was still in
progress and has accomplished ==0L registering a negative variance of #>0:L or ;
calendar das %ehind0 Summar hereunder are the detailed accomplishment report0
A##o20)$%2en! Re0or! & o (1 A"3"! '61'
De#r$0!$on Pre9$o" T%$ :ee5 To D&!e
$arget N Scheduled :>>0>>L >0>>L :>>0>>L
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 22/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 23/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 24/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 25/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
Con!r&#!or Lo#&!$on De#r$0!$on
Bulacan*arden
"oof dec/ :0) Provision of *roove +ines at 'ooden $rellis Posts;0) Polurethane application at wooden trellis and dec/0) !nstallation of tile FcerujoG at wooden dec/ steps
Beta1lectric
"oof dec/ :0) Completion of devices3 outlets3 %o- covers at pumproom & storage
;0) !nstallation of special lighting fi-tures (variation order)
"eform Podium :0) n#going painting of par/ing slot num%er;0) inal Painting of Par/ing Area & 2tilit "oomsN "amps
$ower :0) Painting of Metal oors & ire 1-it Area;0) inal Painting 1-terior Part of 4otch 'all0 )!nstallation & Sealant 'or/s of umm 7ent Cap?0) inal Painting of 1-terior including Balconies
"oof dec/ :0) Painting 'or/s at Kitchen Area3 Storage3Pump "oom & Common $&B
Bradnams $ower :0) Completion of Punch list at 'indows of 1levator+o%% and Hallwas ("emoval of Concrete +aitance3Missing Handle3 "u%%er *as/ets and +imiters)
!"M Podium :0) "ectification of $iling 'or/s at 1levator +o%%
$ower :0) Provision of pening for Steel *ate (2nit @>:);0) Plastering 'or/s inside 11 "oom
"oofec/
:0) "elocation of $&B oor at Common $&B;0) Adjustment of oor at Storage "oom0) $opping 'or/s of Storage "oom
roilipino
Podium :0) n#going !nstallation Plunger at Par/ing Area
$ower :0) !nstallation of "emaining Balcon Steel *ate (2nit @>:);0) n#going !nstallation of "emaining ACC2 *rilles (? pcs)0) n#going !nstallation of "emaining Secret oor ( pcs)
ressinet $ower :0) "estoration of 1-terior Sealant on Precast Cladding
Super $ower :0) "estoration of amaged lat Ceiling & Bul/headscaused % 'ater +ea/s at "esidential areas(due to ressinetIs defective sealant)
*S *oBrothers
$ower :0) "e#!nstallation of amaged +aminated looringcaused % 'ater +ea/s at "esidential areas(due to ressinetIs defective sealant)
"apidorming
PodiumN$owerN"
:0) Completion of %alance metal door hinges (for utilit rooms3 11 rooms & fire e-it doors)
Agchem Basement :0) Completion of topping wor/s at S$P;0) "estoration of Metal oors & penings
(S$P & Pump "oom)
"oof dec/ :0) !nstallation of plum%ing fi-tures and/itchen accessories
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 26/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 27/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 28/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
& !nstalled
Kitchen Sin/ .P#$rap
"esidential 2nits =>= =>= > elivered
& !nstalled
Angle 7alve wN
Hose (/itchensin/)
"esidential 2nits =>= =>= > elivered
& !nstalled
!nduction Coo/er(; %urner)
"esidential 2nits(Studio)
>: >: > elivered
& !nstalled
!nduction Coo/er (? %urner)
"esidential 2nits(Com%ined)
;> ;> > elivered
& !nstalled
"angehood "esidential 2nits(e-cept end studios)
=>= =>= > elivered
& !nstalled
"angehood withilter
"esidential end units J: J: > elivered
& !nstalled
T*B A##eor$e * F$=!"re
escription +ocation "e,"$red9uantit
9uantit!nstalled
Balance "emar/s
'ater Closet "esidential 2nits =@> =@> > elivered& !nstalled
+avator "esidential 2nits =J? =J? > elivered& !nstalled
+avator aucet "esidential 2nits =J? =J? > elivered& !nstalled
Angle 7alve wNHose (+avator)
"esidential 2nits =@> =@> > elivered& !nstalled
Angle 7alve wNHose ('aterCloset
"esidential 2nits =@ =@ > elivered& !nstalled
'ater Heater "esidential 2nits =?= =?= > elivered& !nstalled
$elephone $peShower
"esidential 2nits =?= =?= > elivered& !nstalled
Shower aucet "esidential 2nits =?= =?= > elivered& !nstalled
$owel Holder "esidential 2nits =?= =?= > elivered& !nstalled
Soap Holder "esidential 2nits =?= =?= > elivered& !nstalled
$issue Holder "esidential 2nits =?= =?= > elivered& !nstalled
Shower1nclosure
"esidential 2nits =?= =?= > elivered& !nstalled
A!!$# S!o#5 Pro9$$on
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 29/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 30/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
Camaclang starting ;; ul ;>::0 ue to adjustments in deadline and contractorIs failure
to meet the given date3 *1C . Mar/eting group originall started actual punchlisting a
wee/ after dated > ul ;>:: as per assistance of A$MC! and 11! representatives0
+isted herewith are the complete schedule for punchlisting3 rectification and acceptance
for the following mar/eting floor as followsE
F)oor Le9e),M&r5e!$n3
P"n#% )$!$n3 Re#!$$#&!$on CRUA##e0!&n#e
Mon!% !o <eIn/$#&!e/ on !%e 'n/
T"rno9er No!$#e
F 1'F ;; ul ;>:: . ;; August ;>::
>: August ;>:: . > Septem%er ;>::
ul . August;>::
F
1'F 1 F;; August ;>::
. >: cto%er ;>::;; August ;>::
. > cto%er ;>:: August . cto%er
;>::
'6F 'F :@ Septem%er ;>:: . : cto%er ;>::
; Septem%er ;>:: . : cto%er ;>::
Septem%er . cto%er ;>::
'F (F : cto%er ;>:: . > 4ovem%er ;>::
: cto%er ;>:: . > 4ovem%er ;>::
cto%er . 4ovem%er ;>::
(F +'F :J 4ovem%er ;>:: . :> ecem%er ;>::
;: 4ovem%er ;>:: . : ecem%er ;>::
4ovem%er . ecem%er ;>::
$he :st residential unit accepted % *1C# C"2 group was mar/eting unit >= last
August >?3 ;>:: which also happens to %e the :st wner Accepted 2nit % August >3
;>::0 2nit ;?AB which serves as *1C . C"2 mar/eting temporar visitors lounge
was Fconditionall acceptedG last 4ovem%er ::3 ;>:: due to several remaining punch list
while it was finall turnover to 2nit wner last ecem%er :;3 ;>::0
As of latest update reflected on Handover of 2nits "eport dated : August ;>:;3 after
= das elapsed since the da punch list period commenced3 remaining original
unaccepted %alance are ; mar/eting units ?;:?O:J and ?;:@O:0 But due to recurring
issues majorit are of water lea/ pro%lems3 *1C#C"2 returned units claiming to %e
FunacceptedG to record a total of out of => residential units overall0
To!&) Un$! CRU A##e0!e/ To!&) B&)&n#e
riginal => =>J ;
ue "ecurring !ssues => @= (
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 31/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 32/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
,@151 3eak?Daa4ed 3ai!a"edFoori!4
!derOsera"io!
500> 3eak?Daa4ed 3ai!a"edFoori!4
5015?1 3eak?Daa4ed Bulk#ead !derOsera"io!
50171>1& 3eak?Daa4ed Bulk#ead
5110111* 3eak?Daa4ed 3ai!a"edFoori!4
Wai"i!4 6ordelier/
5115 3eak?Daa4ed Bulk#ead !derOsera"io!
51171> 3eak?Daa4ed Bulk#ead !derOsera"io!
5*07 3eak?Daa4ed %eili!4 3ii!4Area
!derOsera"io!
5*0> O!4oi!4 3is" o6 O9!er
Re%"i<%a"io!
5*11 3eak?Daa4ed %eili!4 3ii!4Area
5*151 3eak?Daa4ed ulk#ead O!4oi!4re%"i<%a"io!
5*171> 3eak 2 Missi!4 8a!dle O!4oi!4re%"i<%a"io!
5*1& 3eak?Daa4ed %eili!4 3ii!4Area
5*1@ 3eak?Daa4ed %eili!4 3ii!4Area
5**0 3eak?Daa4ed %eili!4 3ii!4Area
5**, 3eak?Daa4ed 3ai!a"edFoori!4
5**5 3eak?Daa4ed 3ai!a"edFoori!4
Ke/s O9!er
5** 3eak?Daa4ed Bulk#ead
5**7 3eak?Daa4ed Bulk#ead
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 33/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
(. PROJECT TURNOVER FILES
AND RELEVANT INFORMATION
PROJECT DIRECTORY
Con")!&n!
NAME OCOMPANG?CONTACTPERSON
POSITION ADDRESS TE3EP8ONE NO.
AH NO.?EMAI3
ADDRESS
OWNERMASTERPIECEASIA PROPERTIESINC. (MAPI)A. -ose R.
Tresalles$ -r.B. P#illi+ A.
3a!ua
ProJe%" Ma!a4er
ProJe%" Ar%#i"e%"
5World9ideCor+ora"e
Ce!"er$S#a9 Bld.$Ma!dalu/o!
4 Ci"/
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 34/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
ARC8ITECTA3BERT S. G 2ASSOCIATES(ASGA)A. Aler" S. GuB. Ala! Ra!era
C.
Pri!%i+al
STRCTRA3SGLA. -ose S/B. Ale T/C. 3a9re!%e /
Asso%ia"eProJe%"
Coordi!a"or
!i"s 05 "o0>$ Pr/%e
Ce!"erCo!do. Cor+.
11>@ C.Ro%es Ae.$
%or. Ba4"ika!s".$ Maka"i
Ci"/
&@7'@>05&@7'@>0
&@7'@>70aroi!s/i!6
o.%o.+#?
aroi!s/4ail.%o
3ANDSCAPEE.A. ARE3IO
A. Ale T/ Pri!%i+al
!i" ABe!Jai! 1
Bld4. 7* S4".Es4uerra Ae.%or. M.
I4!a%ia .C.
@*@'0*07 510'501
e.au4elio/a#oo.%o
ELECTRICAL%MAR A .ALI& 'PARTNERSA. Mar A. AliB. S"e+#e!
Na+e!as
Pri!%i+alProJe%"
Coordi!a"or
*5,0Si!4alo!4 S".$
Mala"e$Ma!ila
*,'15>,*1'70&,
*1'70&,arali>>
/a#oo.%o
MECANICAL%D.L. LAMANENINEERIN
A. Doi!4o3a4a!
Pri!%i+al
!i" 50&Wes" Trader
Ce!"er$
Co!doi!iu$ 1,* Wes"Ae. .C.
,>5'5057,>1'@&5>
dlla4a!e!4
/a#oo.%o.+#
PL*M+IN,SANITAR-%F.L.FI*EROA' ASSOCIATESA. 3 i4ueroaB. Rod!e/
Co!s"a!"i!o
Pri!%i+alProJe%"
Coordi!a"or
7>0 Cao .Sa!%#e$
Ma!dalu/o!4Ci"/
,1'>>*1,*'5750
>1@'5&11F<4ueroa111
/a#oo.%o
LIFTCONS*LTANT%MEINARDT
PILS. INC.(MPI)A. erdi!a!d
Na!io!4B. e4%#ell
A%u!a
Pri!%i+al
*? C#a""a8ouse 117alero %or.
Ru<!o S".Sal%edoilla4e$
Maka"i Ci"/
&&>'1,@1 &&>'11>*+iei!#ar
d".%o.+#
FA/ADECONS*LTANT%MEINARDTFA/ADE aade
*? C#a""a8ouse 117alero %or.Ru<!o S". &&>'1,@1 &&>'11>*
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 35/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 36/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 37/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 38/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
PROJECT FACT SHEET
PROJECT NAME Starmall Prima aang Hari
PROJECT LOCATION aang Hari Corner Molino Blvd03 Bacoor3 Cavite
O:NER Masterpiece Asia Properties !nc0
Contact Persons ose "0 $resvalles3 r0Business Address ?th loor3 'orldwide Corporate Center3 Shaw Blvd03
Mandaluong Cit$elephone 4o0 (>;) a- 4o0 (>;)
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 39/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 40/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
PERMITS LICENSES SECURED ,NO. AND DATE ISSUED+icense 4ame PermitN +icense 4o0 ateBaranga Clearance ?? > ct ;>>H+2"B # +icense to Sell ;;>; >= Mar ;>>=
A$#Height Clearance !#:?>#> > ul ;>>
14"#1MB 1CC ;>>#>=#;#>;#;;> ; ct ;>>P'H#B2!+!4* P1"M!$
CivilN Structural C:;#>#:?@ : ec ;>>1lectrical 1P#C#:;#;>>#>J?#>; : ec ;>>
1P#C#;>>#:>#:J>=#:@?; : 4ov ;>>Mechanical >:;>>:? (ire#Protection) :; ec ;>>
>:;>>:?= (AC2N7ent) :; ec ;>>>:>>>:: : 4ov ;>>>=:;>>:; (: Stand% *en#Set) ;> an ;>:>:>>>>>:? (:3J> /g0P1 Q:) >: Mar ;>:>:>>>>>:= (:3J> /g0 P1Q;) >: Mar ;>:>:>>>>>;> (:3J> /g0P1 Q) >? Mar ;>:>
:>>>>>:= (:3@>> /g0P1 Q?) > Mar ;>:>SanitarN Plum%ing CS:;>#>=J : ec ;>>
"C#>#:>#>=J; : 4ov ;>>P'H # 1-cavation&*round Preparation 1>J#>#> ;: Ma ;>>ccupanc Permit P>:;#>J;= >? ul ;>:;Sidewal/ ConstructionPermit $S::#::#:J:; > 4ov ;>::
GENERAL DATA+ot Area 3>=0= s,uare metersF)oor Are&
Phase : +ower *round loor :3:@0;J s,uare meters *round loor :;3;=:0= s,uare meters "oof ec/ :;3>@;0: s,uare metersPhase ; *round loor 3;0> s,uare meters Second loor ;3J0; s,uare meters "oof ec/ ;3=>0=@ s,uare meters
P&r5$n3 S)o!Phase : Par/ing :?@ slotsPhase ; Par/ing J@ slots
N"2<er o Ten&n!Phase : : slotsPhase ; :@ (: for C%er Rone) slots
4um%er of floorsHeight of Building :J metersN J:0 ft0loor to loor Height 0:> metersCapacit of Cistern (omestic) :>>3>>> gallonN tan/
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 41/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
Capacit of Cistern(ire Protection) :>>3>>> gallonN tan/Sewage $reatment Plant J> mN daStrength of Concrete 2sed
Columns =3>>> psiSla% & %eam @3J>> psi
Sla% on grade 3>>> psi
PROJECT BRIEFMasonr 'or/s
CHB +aing ?@3@??0= s,uare metersPlasteringNS/im coat =3;=0=@ s,uare meters
Metal oors & ramesPipe Chase 1nclosure ?@ setsire 1-it oors ; sets1lectrical "oom ; sets
AC2 Secret oor :?? sets
*ar%age "oom : set (roll#up door)$ransformer "oom ; sets*enerator Set : setMachine "oom : setP+$ "oom : set
oors & Hardwares:J (Main oor) = sets:JA (Main oor) := setsBedroom oor ?:= sets$&B oor (Swing $pe) =>= sets$&B oor (Sliding) > setsMaidIs $&B (Acrlic) :; sets
$iles"esidential (+iving Area) (@>>-@>>) :=3;=0>> s,uare meters$&B ('all & loor) (@>>-@>>) ::3J;0@; s,uare metersBalcon $iles (>>->>) ;;0:> s,uare metersHallwa N1levator +o%%ies (@>>-@>>) 3@@0J@ s,uare meters
4atural Stones$ravertine 'all Cladding @0>> s,uare meters$ravertine 'all Accent 0J@ s,uare metersBush hammered looring =0>> s,uare meters
'indows & *laDingpera%le 'indows ;;; sets
i-ed 'indows : sets A* oor :>? sets
+aminated looringloor Plan/s ?0> s,uare metersBase%oard @3?=:0 linear meters$#Profile ??@0;> linear meters1nd Profile ;=0 linear meters"educer @0:? linear meters
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 42/52
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 43/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
Piping Sstem ;>3@=;ire 1-tinguisher
A1 '1 (J> l%s) @ pcs0C; P1 (:J l%s) pcs0
ABC P1 (:J l%s) ; pcs0r Chemical (:> l%s) ? pcs0
ROCES TO:ER RESIDENTIAL UNITS $6P!CA+ C+" SCH1M1
SCHEME 1
AREA COLOR
:ALL COLOR K!$CH14N !4!4*N +!7!4* +!+6 'H!$1
:ALL COLOR B1"M A!S6 C"1AM
FLOOR B1"M CH1""6
CABINET K!$CH14 S!+71"
SCHEME '
AREA COLOR
:ALL COLOR K!$CH14N !4!4*N +!7!4* A!S6 C"1AM
:ALL COLOR B1"M SK6+!41
FLOOR B1"M H!MA+A6A4 AK
CABINET K!$CH14 B11CH'
SCHEME (
AREA COLOR
:ALL COLOR K!$CH14N !4!4*N +!7!4* !441" CA+M
:ALL COLOR B1"M SK6+!41
FLOOR B1"M H!MA+A6A4 AK
CABINET K!$CH14 CH1""6
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 44/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
SCHEME +
AREA COLOR
:ALL COLOR K!$CH14N !4!4*N +!7!4* 'H!$1
:ALL COLOR B1"M +!+6 'H!$1
FLOOR B1"M S4' 'H!$1
CABINET K!$CH14 "6A+ B+21
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 45/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 46/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 47/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 48/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 49/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 50/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 51/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite
MASTERPIECE ASIA PROPERTIES INC.
7/23/2019 Close-out Report Pics Xx
http://slidepdf.com/reader/full/close-out-report-pics-xx 52/52
STARMALL PRIMA DAANG HARIDaang Hari Corner Molino Blvd., Bacoor, Cavite