Changing Lenses: Leveraging a Common Data Source for Strategic and Tactical Applications By: David Rose, Leah Walker and Marina Sominsky ICEAA Canada Workshop Sept 17-18, 2019 Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Transcript of Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the...

Page 1: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Changing Lenses: Leveraging a CommonData Source for Strategic and Tactical Applications

By: David Rose, Leah Walker and Marina Sominsky

ICEAA Canada Workshop Sept 17-18, 2019

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 2: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

• Industry / Company Employment- Cobec Consulting Inc. (2013 – Present)- EcoSys Consulting (2010 – 2013)- Freescale Semiconductor (1998 – 2010)

• Education / Certification- BA, Aviation, Airplane Systems, OSU- Commercial Pilot- PMP

• Professional Experience- Domain Expert, Scheduling, Cobec, various FAA

programs• Something you don’t know about me

- Flew the Fuji Blimp at Oshkosh 2

Biography: David RosePresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 3: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

• Industry / Company Employment- Cobec Consulting Inc. (2018 – Present)- Regulus Group LLC (2011 – 2018)

• Education / Certification- BA, English, UCO- PMP

• Professional Experience- Consultant, Scheduling, Cobec, 8 years FAA Support on

various programs• Something you don’t know about me

- Expends an unusually high amount of energy on costumes for any occasion allowing a costume

3

Biography: Leah WalkerPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 4: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

• Industry / Company Employment- Cobec Consulting Inc. (2017 – Present)- Kitchell (2008 – 2017)- Freescale Semiconductor (2004-2007)

• Education / Certification- BS, Chemical Engineering, KU- EIT, PMP, PSP

• Professional Experience- Sr. Consultant, Cobec, FAA TAMR program

• Something you don’t know about me- Avid ski enthusiast

4

Biography: Marina SominskyPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 5: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

• RADAR Systems covering the Southern California Large TRACON (SCT)

• Tactical: Operational Sustainment Initiative (OPS)• Strategic: Facilities and Equipment Program (F&E)• Common Reporting Infrastructure

- Oracle® Primavera P6℠ - Tableau® Software

5

IntroductionPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 6: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

• FAA Program Schedule Types• The Southern California TRACON• Surveillance Improvement Initiative (SII)

- Platform Overview- OPS Initiative- F&E Program

• Setting the stage in Primavera P6• Tailored reporting in Tableau• Conclusion• Questions/Comments

6

Presentation OutlinePresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 7: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

7

FAA Program Schedule Types

• Operational Sustainment (OPS) - Tactically focused initiatives- Schedule owners

• Terminal Second Level Engineering (TSLE)• Regional Service Area• System Support (Service) Centers (SSC) • Technical Operation (Tech Ops) • Technical Support Operations Group (TSOG)

- Stakeholders / Union Partners• Air Traffic Controllers (ATC)• National Air Traffic Controllers Association (NATCA)• Professional Aviation Safety Specialists (PASS)

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 8: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

• Facilities and Equipment (F&E) - Strategically focused programs- Driven by the Acquisition Management System (AMS)- Funding is released by the Joint Resource Council (JRC)- Performance reporting

• Regular and ongoing• Status of achievement and forecasting of major milestones • Financial performance

- Authority Stakeholders • FAA executive reporting chain • The United States Congress

8

FAA Program Schedule TypesPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 9: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

9

Southern California TRACON

• The Southern California Terminal RadarApproach Control facility (SoCal TRACON orSCT) provides radar air traffic approach controlservices to all arriving and departing aircraftfor 24 airports in Southern California.

• SCT guides about 2.2 million planes overroughly 9,000 square miles in a yearand covers an area from 20 miles north ofBurbank to the US/Mexican border and fromSan Bernardino to Santa Catalina Island.

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 10: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

• California Airspace• SCT Major Airports

- Burbank- John Wayne- Los Angeles- Long Beach- Ontario- San Diego- Van Nuys- March AFB- MCAS Miramar- NAS North Island

10

Southern California TRACONPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 11: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

11

Surveillance – Platform Overview• RADAR Explained

- Primary – Non-Cooperative- Secondary - Cooperative

• ASR-9 – Primary• Mode-S - Secondary

Mode-S Secondary / Cooperative Radar

ASR-9 Primary / Non Cooperative Radar

Non-Cooperative Data Block

CooperativeData Block

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 12: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

12

Surveillance - OPS Initiative

Surveillance Systems need to be continually maintained and sustained to address issues identified below:• End of Life Parts• Depot Stock Depletion• Aging Systems• Urban Growth• Surveillance System Software Upgrades*• Automation System Software Upgrades and Enhancements*• System Safety Modifications (SSMs)*• Software Performance Improvements*

*Tracked in P6 as Optimization and Rebaselining Tasks

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 13: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

13

Surveillance - OPS InitiativeMaintenance and Sustainment Issues for the ASR-9 and Mode S are identified below:ASR-9• Rotary Joints*• Encoder Non-Linearity*• Beacon Antenna Tilt*• ASR-9 Cabling Issues*• ASR-9 RF Interference (SPECTRUM)*Mode S• CPME Relocations and Receiver/Transmitter cabinets and Delays• FRD Documentation• IF Receivers• Annual Antenna Check• Rotary Joints*• APG/Encoders*• RFTTGs*

*Tracked in P6 as Optimization and Rebaselining Tasks

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 14: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

14

Surveillance - F&E ProgramMode-S SLEP

-Shortfall analysis completed demonstrated that a Mode-S Service Life Extension Program (SLEP) is needed to ensure supportability and sustainment of the systems through CY2026-Without a SLEP, Mode-S will experience decreased operational availability and performance deterioration as a result of decreased availability of replacement parts due to obsolescence-Current Plan: Replace all En Route and some Terminal Mode S Systems

Program Scope-Full replacement of Mode-S System below the rotary joint-Provide a minimum of equivalent performance as current Mode-S

ASR-9 SLEP 3

- The ASR-9 SLEP Phase 3 Program is intended to extend the service life for all 135 ASR-9 systems.- Seven projects have been identified that will address obsolescence, end of service life, and diminishing manufacturing sources.

• Data Communications Equipment (DCE) Modernization:• Analog to Digital (AID) Converter Circuit Card Assembly (CCA) Replacement• Clutter Map Memory CCA Depot Replenishment• Modulator Pulse Assembly (MPA) Monitoring and Control CCA Replacement• Maintenance Display Unit (MDU) Replacement• Hardline Cables and Connectors Replacement and Depot Stock• Receiver Protector Depot Replenishment

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 15: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title styleSurveillance Improvement Initiative Background

• SCT transitioned to a new automation platform in Aug 2015:Standard Terminal Automation Replacement System (STARS).

• Soon after STARS implementation, Air Traffic Controllers (ATCs) noticed an increase in false targets and tracks.

- False Target Impacts and Mitigations Include:• Increased ATC to aircraft radio communications• Unnecessary maneuvering requests of aircraft by ATC• Unnecessary go-arounds

• Progress has been made to reduce false targets through adjustments to the automation system

• Further false target reduction requires adjustments and optimization of the network of sensors feeding the SCT facility. The Surveillance Improvement Initiative.

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 16: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title styleSurveillance Improvement Initiative• Goal:

- Reduce false targets and improve surveillance performance while minimizing risk andoperational impact.

• Steps for Surveillance Improvement Strategy Implementation:- All RADAR systems feeding SCT

• Evaluate current condition• Re-baseline all systems• Optimize using a new technique for a network of sensors• Develop and implement software to further reduce false targets

• Duration:- Currently underway and expected to complete by end of 2019

• Certain activities require full or reduced surveillance service outages varyingfrom 3 to 10 hours in duration

- Outages can result in increased separation requirements to ensure safety margins• ATC and Technical Operations are working closely to schedule events and plan outages to

maximize proper safety margins and minimize operational impactsNOTE: Full ADS-B implementation in 2020 will further improve false targets and false tracks

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 17: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Setting the Stage in Primavera P6

17

NASA Cost & Schedule Symposium, Aug. 15, 2019

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 18: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

• PMO Reporting for F&E projects – Key Milestones and Counting and overall program status

• TSLE Requirements- Engineering Studies- Site Support- Outages- Optimization

• System Service Center (SSCs)- Resources- Site Activity- Outages

• Air Traffic Control (ATC)- Outages- Level of service improvement dates

18

Stakeholder RequirementsPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 19: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

• Identify the required codes and user defined fields for each stakeholder

• Tailor the Tableau dashboard to filter for defined milestones and desired views

• Primavera Layout to drive Tableau dashboard• Data Collection• Data Import to Tableau Prepare• Data Joins in Database• Publishing to Tableau

19

Primavera Reporting SetupPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 20: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

20

Code and UDF Stakeholder Matrix

• Based on stakeholder requirements, OPS and F&E schedules have UDFs or Codes assigned to tasks to allow dashboard display and filtering.

Stakeholders Requirements Primavera P6 OPS F&EATC Outages UDF: Full Downtime x

SSC Geographic locationActivity Code: Loc ID Activity Code: Service Area

x

TSLE Surveillance PlatformUDF: ASR-9UDF: Mode S

x

Tech Ops Surveillance Platform

UDF: ASR-9UDF: Mode SActivity Code: Loc ID Activity Code: Service AreaActivity Code: Resources

x x

JRC Program Information

UDF: ASR-9 UDF: Mode S Activity Code: Loc ID Activity Code: Service Area Activity Code: Resources

x x

SII Surveillance Platform

UDF: ASR-9 UDF: Mode S Activity Code: Loc ID Activity Code: Service Area Activity Code: Resources

x x

Programs

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 21: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

21

Defining UDFs for ReportingPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 22: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

22

FAA EPS – Many Project TypesPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 23: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

23

Primavera Task LayoutPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 24: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

24

Putting it all Together• Open all Relevant Projects in the EPS• Identify the codes and UDFs the stakeholders require:

- F&E – Equipment Delivery, Install, Site Complete- OPS – Resources, Downtime, Facility Type, Location ID, on-site activities- Apply reporting layout within P6, and export to CSV

• Import to reporting SQL database, where data joins occur, and tailored dashboards are published via Tableau

• Release the dashboards to the stakeholders – SCT OPS and Surveillance F&E!

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 25: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Tailored Reporting in Tableau

25

NASA Cost & Schedule Symposium, Aug. 15, 2019

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 26: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

26

The SCT Dashboard – Home PagePresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 27: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

27

The SCT Dashboard – Outage FilterPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 28: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

28

The SCT Dashboard – Full SchedulePresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 29: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

29

The PMO F&E Dashboard Home PagePresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 30: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

30

The AJW-41 DashboardPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 31: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Conclusion

31

NASA Cost & Schedule Symposium, Aug. 15, 2019

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 32: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

Click to edit Master title style

32

Conclusion

• Coordination between tactical (sustainment / maintenance) and strategic (new capabilities)

• Single source of truth – Primavera P6 schedule repository

• Efficient data gathering, transformation, and visualization

• Stakeholder driven codes, fields, and resource views

• Distinct Tableau dashboards with custom level of detail to meet diverse requirements

Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019

Page 33: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit

QUESTIONS/COMMENTS?