Changing Lenses: Leveraging a CommonData Source for Strategic and Tactical Applications
By: David Rose, Leah Walker and Marina Sominsky
ICEAA Canada Workshop Sept 17-18, 2019
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 2: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/2.jpg)
Click to edit Master title style
• Industry / Company Employment- Cobec Consulting Inc. (2013 – Present)- EcoSys Consulting (2010 – 2013)- Freescale Semiconductor (1998 – 2010)
• Education / Certification- BA, Aviation, Airplane Systems, OSU- Commercial Pilot- PMP
• Professional Experience- Domain Expert, Scheduling, Cobec, various FAA
programs• Something you don’t know about me
- Flew the Fuji Blimp at Oshkosh 2
Biography: David RosePresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 3: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/3.jpg)
Click to edit Master title style
• Industry / Company Employment- Cobec Consulting Inc. (2018 – Present)- Regulus Group LLC (2011 – 2018)
• Education / Certification- BA, English, UCO- PMP
• Professional Experience- Consultant, Scheduling, Cobec, 8 years FAA Support on
various programs• Something you don’t know about me
- Expends an unusually high amount of energy on costumes for any occasion allowing a costume
3
Biography: Leah WalkerPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 4: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/4.jpg)
Click to edit Master title style
• Industry / Company Employment- Cobec Consulting Inc. (2017 – Present)- Kitchell (2008 – 2017)- Freescale Semiconductor (2004-2007)
• Education / Certification- BS, Chemical Engineering, KU- EIT, PMP, PSP
• Professional Experience- Sr. Consultant, Cobec, FAA TAMR program
• Something you don’t know about me- Avid ski enthusiast
4
Biography: Marina SominskyPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 5: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/5.jpg)
Click to edit Master title style
• RADAR Systems covering the Southern California Large TRACON (SCT)
• Tactical: Operational Sustainment Initiative (OPS)• Strategic: Facilities and Equipment Program (F&E)• Common Reporting Infrastructure
- Oracle® Primavera P6℠ - Tableau® Software
5
IntroductionPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 6: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/6.jpg)
Click to edit Master title style
• FAA Program Schedule Types• The Southern California TRACON• Surveillance Improvement Initiative (SII)
- Platform Overview- OPS Initiative- F&E Program
• Setting the stage in Primavera P6• Tailored reporting in Tableau• Conclusion• Questions/Comments
6
Presentation OutlinePresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 7: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/7.jpg)
Click to edit Master title style
7
FAA Program Schedule Types
• Operational Sustainment (OPS) - Tactically focused initiatives- Schedule owners
• Terminal Second Level Engineering (TSLE)• Regional Service Area• System Support (Service) Centers (SSC) • Technical Operation (Tech Ops) • Technical Support Operations Group (TSOG)
- Stakeholders / Union Partners• Air Traffic Controllers (ATC)• National Air Traffic Controllers Association (NATCA)• Professional Aviation Safety Specialists (PASS)
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 8: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/8.jpg)
Click to edit Master title style
• Facilities and Equipment (F&E) - Strategically focused programs- Driven by the Acquisition Management System (AMS)- Funding is released by the Joint Resource Council (JRC)- Performance reporting
• Regular and ongoing• Status of achievement and forecasting of major milestones • Financial performance
- Authority Stakeholders • FAA executive reporting chain • The United States Congress
8
FAA Program Schedule TypesPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 9: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/9.jpg)
Click to edit Master title style
9
Southern California TRACON
• The Southern California Terminal RadarApproach Control facility (SoCal TRACON orSCT) provides radar air traffic approach controlservices to all arriving and departing aircraftfor 24 airports in Southern California.
• SCT guides about 2.2 million planes overroughly 9,000 square miles in a yearand covers an area from 20 miles north ofBurbank to the US/Mexican border and fromSan Bernardino to Santa Catalina Island.
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 10: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/10.jpg)
Click to edit Master title style
• California Airspace• SCT Major Airports
- Burbank- John Wayne- Los Angeles- Long Beach- Ontario- San Diego- Van Nuys- March AFB- MCAS Miramar- NAS North Island
10
Southern California TRACONPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 11: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/11.jpg)
Click to edit Master title style
11
Surveillance – Platform Overview• RADAR Explained
- Primary – Non-Cooperative- Secondary - Cooperative
• ASR-9 – Primary• Mode-S - Secondary
Mode-S Secondary / Cooperative Radar
ASR-9 Primary / Non Cooperative Radar
Non-Cooperative Data Block
CooperativeData Block
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 12: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/12.jpg)
Click to edit Master title style
12
Surveillance - OPS Initiative
Surveillance Systems need to be continually maintained and sustained to address issues identified below:• End of Life Parts• Depot Stock Depletion• Aging Systems• Urban Growth• Surveillance System Software Upgrades*• Automation System Software Upgrades and Enhancements*• System Safety Modifications (SSMs)*• Software Performance Improvements*
*Tracked in P6 as Optimization and Rebaselining Tasks
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 13: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/13.jpg)
Click to edit Master title style
13
Surveillance - OPS InitiativeMaintenance and Sustainment Issues for the ASR-9 and Mode S are identified below:ASR-9• Rotary Joints*• Encoder Non-Linearity*• Beacon Antenna Tilt*• ASR-9 Cabling Issues*• ASR-9 RF Interference (SPECTRUM)*Mode S• CPME Relocations and Receiver/Transmitter cabinets and Delays• FRD Documentation• IF Receivers• Annual Antenna Check• Rotary Joints*• APG/Encoders*• RFTTGs*
*Tracked in P6 as Optimization and Rebaselining Tasks
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 14: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/14.jpg)
Click to edit Master title style
14
Surveillance - F&E ProgramMode-S SLEP
-Shortfall analysis completed demonstrated that a Mode-S Service Life Extension Program (SLEP) is needed to ensure supportability and sustainment of the systems through CY2026-Without a SLEP, Mode-S will experience decreased operational availability and performance deterioration as a result of decreased availability of replacement parts due to obsolescence-Current Plan: Replace all En Route and some Terminal Mode S Systems
Program Scope-Full replacement of Mode-S System below the rotary joint-Provide a minimum of equivalent performance as current Mode-S
ASR-9 SLEP 3
- The ASR-9 SLEP Phase 3 Program is intended to extend the service life for all 135 ASR-9 systems.- Seven projects have been identified that will address obsolescence, end of service life, and diminishing manufacturing sources.
• Data Communications Equipment (DCE) Modernization:• Analog to Digital (AID) Converter Circuit Card Assembly (CCA) Replacement• Clutter Map Memory CCA Depot Replenishment• Modulator Pulse Assembly (MPA) Monitoring and Control CCA Replacement• Maintenance Display Unit (MDU) Replacement• Hardline Cables and Connectors Replacement and Depot Stock• Receiver Protector Depot Replenishment
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 15: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/15.jpg)
Click to edit Master title styleSurveillance Improvement Initiative Background
• SCT transitioned to a new automation platform in Aug 2015:Standard Terminal Automation Replacement System (STARS).
• Soon after STARS implementation, Air Traffic Controllers (ATCs) noticed an increase in false targets and tracks.
- False Target Impacts and Mitigations Include:• Increased ATC to aircraft radio communications• Unnecessary maneuvering requests of aircraft by ATC• Unnecessary go-arounds
• Progress has been made to reduce false targets through adjustments to the automation system
• Further false target reduction requires adjustments and optimization of the network of sensors feeding the SCT facility. The Surveillance Improvement Initiative.
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 16: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/16.jpg)
Click to edit Master title styleSurveillance Improvement Initiative• Goal:
- Reduce false targets and improve surveillance performance while minimizing risk andoperational impact.
• Steps for Surveillance Improvement Strategy Implementation:- All RADAR systems feeding SCT
• Evaluate current condition• Re-baseline all systems• Optimize using a new technique for a network of sensors• Develop and implement software to further reduce false targets
• Duration:- Currently underway and expected to complete by end of 2019
• Certain activities require full or reduced surveillance service outages varyingfrom 3 to 10 hours in duration
- Outages can result in increased separation requirements to ensure safety margins• ATC and Technical Operations are working closely to schedule events and plan outages to
maximize proper safety margins and minimize operational impactsNOTE: Full ADS-B implementation in 2020 will further improve false targets and false tracks
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 17: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/17.jpg)
Setting the Stage in Primavera P6
17
NASA Cost & Schedule Symposium, Aug. 15, 2019
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 18: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/18.jpg)
Click to edit Master title style
• PMO Reporting for F&E projects – Key Milestones and Counting and overall program status
• TSLE Requirements- Engineering Studies- Site Support- Outages- Optimization
• System Service Center (SSCs)- Resources- Site Activity- Outages
• Air Traffic Control (ATC)- Outages- Level of service improvement dates
18
Stakeholder RequirementsPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 19: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/19.jpg)
Click to edit Master title style
• Identify the required codes and user defined fields for each stakeholder
• Tailor the Tableau dashboard to filter for defined milestones and desired views
• Primavera Layout to drive Tableau dashboard• Data Collection• Data Import to Tableau Prepare• Data Joins in Database• Publishing to Tableau
19
Primavera Reporting SetupPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 20: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/20.jpg)
Click to edit Master title style
20
Code and UDF Stakeholder Matrix
• Based on stakeholder requirements, OPS and F&E schedules have UDFs or Codes assigned to tasks to allow dashboard display and filtering.
Stakeholders Requirements Primavera P6 OPS F&EATC Outages UDF: Full Downtime x
SSC Geographic locationActivity Code: Loc ID Activity Code: Service Area
x
TSLE Surveillance PlatformUDF: ASR-9UDF: Mode S
x
Tech Ops Surveillance Platform
UDF: ASR-9UDF: Mode SActivity Code: Loc ID Activity Code: Service AreaActivity Code: Resources
x x
JRC Program Information
UDF: ASR-9 UDF: Mode S Activity Code: Loc ID Activity Code: Service Area Activity Code: Resources
x x
SII Surveillance Platform
UDF: ASR-9 UDF: Mode S Activity Code: Loc ID Activity Code: Service Area Activity Code: Resources
x x
Programs
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 21: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/21.jpg)
Click to edit Master title style
21
Defining UDFs for ReportingPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 22: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/22.jpg)
Click to edit Master title style
22
FAA EPS – Many Project TypesPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 23: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/23.jpg)
Click to edit Master title style
23
Primavera Task LayoutPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 24: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/24.jpg)
Click to edit Master title style
24
Putting it all Together• Open all Relevant Projects in the EPS• Identify the codes and UDFs the stakeholders require:
- F&E – Equipment Delivery, Install, Site Complete- OPS – Resources, Downtime, Facility Type, Location ID, on-site activities- Apply reporting layout within P6, and export to CSV
• Import to reporting SQL database, where data joins occur, and tailored dashboards are published via Tableau
• Release the dashboards to the stakeholders – SCT OPS and Surveillance F&E!
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 25: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/25.jpg)
Tailored Reporting in Tableau
25
NASA Cost & Schedule Symposium, Aug. 15, 2019
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 26: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/26.jpg)
Click to edit Master title style
26
The SCT Dashboard – Home PagePresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 27: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/27.jpg)
Click to edit Master title style
27
The SCT Dashboard – Outage FilterPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 28: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/28.jpg)
Click to edit Master title style
28
The SCT Dashboard – Full SchedulePresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 29: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/29.jpg)
Click to edit Master title style
29
The PMO F&E Dashboard Home PagePresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 30: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/30.jpg)
Click to edit Master title style
30
The AJW-41 DashboardPresented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 31: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/31.jpg)
Conclusion
31
NASA Cost & Schedule Symposium, Aug. 15, 2019
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 32: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/32.jpg)
Click to edit Master title style
32
Conclusion
• Coordination between tactical (sustainment / maintenance) and strategic (new capabilities)
• Single source of truth – Primavera P6 schedule repository
• Efficient data gathering, transformation, and visualization
• Stakeholder driven codes, fields, and resource views
• Distinct Tableau dashboards with custom level of detail to meet diverse requirements
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019
![Page 33: Click to add title...- Oracle® Primavera P6 - Tableau® Software 5 Introduction Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 iceaa.ca/2019 Click to edit](https://reader034.fdocuments.us/reader034/viewer/2022052019/6032334571e8232b13544ad0/html5/thumbnails/33.jpg)
QUESTIONS/COMMENTS?
33
NASA Cost & Schedule Symposium, Aug. 15, 2018
Presented at the 5th Annual ICEAA Canada Workshop, September 17-18, 2019 – iceaa.ca/2019