Country Club Creek TrailPreliminary Engineering Report
Public Outreach
Jessica V. SalinasCOA Project Manager
December 9, 2014
![Page 2: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/2.jpg)
Country Club Creek Trail Agenda
Introduction of Project Team Overall Program Goals for Urban Trails Country Club Creek Trail Summary Preliminary Engineering Report Overview
– Outline of PER– Evaluation Criteria– Recommended Route
Next Steps Questions
12/9/14 jvsalinas2
![Page 3: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/3.jpg)
Project Team
City Project Sponsor – Nadia Barrera, PWD City Project Manager – Jessica Salinas, PWD Project Consultant & Subconsultants:
– Civil Engineering Consultants – Gary Martin & Ken Thomas– CAS Consulting, Inc. – Cost Estimating and Utility Coordination– Harutunian Engineering, Inc. – Lighting Options– Hicks & Company – Environmental Investigation– HVJ – Geotechnical Investigation– Jaster Quintanilla San Antonio, LLP – Preliminary Structural Design– Macias & Associates, L.P. – Surveying and Parcel Information
12/9/14 jvsalinas3
![Page 4: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/4.jpg)
12/9/14 nbarrera4
Program Goals for Urban Trails
Easy access for transportation & recreation users. Link to bicycle & sidewalk network. Adequate size to accommodate recreation & transportation
uses. Incorporate amenities & features that transform them into
unique greenways that reflect the City around them. Provide adequate resources to maintain & operate. Ensure context-sensitivity & environmentally sustainability as
well as preservation and improvement upon wildlife habitat.
![Page 5: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/5.jpg)
12/9/14 jvsalinas5
Country Club Creek Trail Project Summary
Project Funded by 2010 Prop 1 & 2012 Prop 12 Preliminary Engineering Report: April 2014 – February 2015 Design Phase: Spring 2015 – Spring 2016
– Construction Estimate (w/20% Contingency) - $4,519,892 Construction – Pending Project Funding
– Anticipated start Fall 2016 Project website: http://www.austintexas.gov/urbantrails
![Page 6: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/6.jpg)
Trail Vicinity Map
12/9/2014 jvsalinas6
![Page 7: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/7.jpg)
Country Club Creek Trail
12/9/14 jvsalinas7
• Approximately 3-mile multi-use path generally running along Country Club Creek connecting Lady Bird Lake to Mabel Davis Park in southeast Austin.
• Two segments of the trail that need to be constructed
• 0.5 mile trail section - from Ventura Drive to Burleson Road through an existing City of Austin electric easement.
• Note: Existing segment along Pleasant Valley from Burleson Road to East Oltorf.
• 1 mile section - from East Oltorf to the existing gravel trail just north of Elmont Drive.
![Page 8: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/8.jpg)
Preliminary Engineering Report
The Preliminary Engineering Report consists of the following sections:Executive Summary Environmental IssuesIntroduction Utilities ImpactPreliminary Trail Routes Structural Preliminary DesignEvaluation Criteria Lighting OptionsCritical Water Quality Zone Opinion Of Probable CostErosion Hazard Zone Route EvaluationDrainage and Floodplain Recommended OptionRight-of-Way Summary & Next StepsTrees
12/9/14 cec8
![Page 9: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/9.jpg)
Evaluation Factors
The following factors were used to evaluate the different trail segments:Accessibility Right-of-WayConnectivity ObstructionsCritical Water Quality Zone Tree ImpactsErosion Hazard Zone EnvironmentalFloodplain/Drainage Impacts Cost
12/9/14 cec9
![Page 10: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/10.jpg)
TRAIL ROUTE
12/8/14 cec10
![Page 11: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/11.jpg)
12/9/14 jvsalinas11
Existing Austin Energy Easement
SEGMENT 1 Austin Energy right-of-way (ROW) from Ventura Drive to Burleson Rd
![Page 12: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/12.jpg)
12/9/14 jvsalinas12
Electric power ROW looking north from Ventura.
SEGMENT 1 Austin Energy right-of-way (ROW) from Ventura Drive to Burleson Rd
![Page 13: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/13.jpg)
Segment 2 – Existing Route along S. Pleasant Valley from Burleson to Oltorf
12/9/14 jvsalinas13
![Page 14: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/14.jpg)
SEGMENT 3 starting at S. Pleasant Valley Rd & E. Oltorf to Riverside Dr.
12/9/14 jvsalinas14
![Page 15: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/15.jpg)
SEGMENT 3 starting at S. Pleasant Valley Rd & E. Oltorf to Riverside Dr.
12/9/14 jvsalinas15
Oltorf facing west towards Pleasant Valley Looking south towards Riverside Dr.
![Page 16: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/16.jpg)
SEGMENT 3B Segment near Sheringham Dr
12/9/14 jvsalinas16
![Page 17: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/17.jpg)
SEGMENT 4 Riverside Dr. & Wickersham Intersection
12/9/14 jvsalinas17
![Page 18: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/18.jpg)
SEGMENT 4 starting at Riverside Dr. to Elmont Dr.
12/9/14 jvsalinas18
Wickersham Dr lookingnorth from E. Riverside Dr.
Northern Bridge of E. Riverside Dr from Wickersham Lane.
![Page 19: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/19.jpg)
SEGMENT 4 Riverside Dr. to Elmont Dr.
12/9/14 jvsalinas19
![Page 20: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/20.jpg)
SEGMENT 4 Riverside Dr. to Elmont Dr.
12/9/14 jvsalinas20
![Page 21: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/21.jpg)
SEGMENT 4 Wickersham Pavement Markings (West Side)
12/9/14 jvsalinas21
![Page 22: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/22.jpg)
SEGMENT 4 Wickersham Pavement Markings (West Side)
12/9/14 jvsalinas22
![Page 23: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/23.jpg)
SEGMENT 4 Wickersham Pavement Markings (East Side)
12/9/14 jvsalinas23
![Page 24: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/24.jpg)
12/9/14 jvsalinas24
Construction Estimate Section 1 & 2
Section Base Estimate 20% Contingency w/Lighting1 $371,575 $445,890 $692,6442 $35,362 $42,435 $352,345
![Page 25: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/25.jpg)
12/9/14 jvsalinas25
Construction Estimate Section 3 & 4
Section Base Estimate 20% Contingency w/Lighting3B1 $1,166,366 $1,399,640 $1,840,3363C $1,406,156 $1,687,387 $1,834,2864B1 $787,116 $944,539 $1,549,733
TOTAL $3,766,575 $4,519,891 $6,269,344
![Page 26: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/26.jpg)
Next Steps
Dec 2014: Collect Public Input to PER– Open House– City Website
Jan 2015: Project Team to incorporate Feedback and update PER Jan 2015: City Stakeholder Final Review of PER Feb 2015: Follow-up Open House to present Final PER Spring 2015: Design Phase
12/9/14 jvsalinas26
![Page 27: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/27.jpg)
12/9/14 jvsalinas27
QUESTIONS
![Page 28: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/28.jpg)
TRAIL ROUTE
12/8/14 cec28
![Page 29: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/29.jpg)
12/9/14 jvsalinas29
BACK-UP
![Page 30: Click here to view a presentation about the CCCT.](https://reader035.fdocuments.us/reader035/viewer/2022062504/5895903c1a28ab702d8bb050/html5/thumbnails/30.jpg)
Evaluation Factors (continued)
Accessibility – Primarily deciding how easy it is to comply with ADA requirements in a segment.
Connectivity – The ease of reaching destinations from the proposed trail. Critical Water Zone (CWQZ) – Indicates whether or not the trail segment is located in this
zone. Erosion Hazard Zone (EHZ) – Indicates whether the trail segment is in the EHZ or not. Floodplain/Drainage Impacts – Indicates whether or not the trail segment is located in the
floodplain and if there are any negative impacts to drainage. Right-of-Way – Indicates if a new easement is required in a trail segment. Obstructions – Indicates if there are features that would impact the location of the trail. Tree Impact – Indicates the impact to trees in a trail segment. Environmental – Indicates the whether or not environmental permits would be required. Cost – Indicates the relative cost in relation to the other options.
12/9/14 cec30