CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine...

46
P&W CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH PERFORMANCE CORE ©2018 United Technologies Corporation This document has been publicly released

Transcript of CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine...

Page 1: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

P&W CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH PERFORMANCE CORE

©2018 United Technologies Corporation This document has been publicly released

Page 2: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

Program Overview HPC Technology Overview HPT Technology Overview Discussion

Topics for Discussion

Photo credit: Embraer

E195-E2 Flight

©2018 United Technologies Corporation This document has been publicly released

2

Page 3: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

0.30

0.35

0.40

0.45

0.50

0.55

0.60

0.65

0.70

0.75

0.70

0.75

0.80

0.85

0.90

0.95

1.00

0.40

0.45

0.50

0.55

0.60

0.65

0.650.60

0.70

0.30

0.65

0.25

0.35

0.40

0.45

0.50

0.55

0.60

3

TSFC

1 Whurr (RR)2 Hall (MIT)3 Carlson (GE)

Overall Efficiency

12 3

Entering A New Era of Engine Architecture CLEEN TECHNOLOGY DEMONSTRATORS

Improved propulsive efficiency enabled by PurePower® Geared Turbofan™ architecture CLEEN I and II efforts enhance performance of GTF system

©2018 United Technologies Corporation This document has been publicly released

3

Page 4: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

Core and Propulsor Technologies under Evaluation CLEEN TECHNOLOGY DEMONSTRATORS

CLEEN I: Ultra-High Bypass (UHB) Propulsor (Short Inlet, Low Pressure-Ratio Fan)

CLEEN II: Enhanced Efficiency Compressor • Advanced aerodynamics • Advanced airfoil/cavity optimization

CLEEN II: Enhanced Efficiency HPT • Advanced aerodynamics • Advanced cooling & durability

©2018 United Technologies Corporation This document has been publicly released

4

Page 5: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

Benefits:

• Improved thermal efficiency

‒ ~ 0.8 – 1.0% fuel burn reduction

Prior Accomplishments:

Work Statement: Continue the TRL advancement of compressor aero-efficiency technologies via detailed design, fabrication, full-scale rig tests, and engine validation.

Objectives: Demonstrate improved

high pressure compressor efficiency via

advanced aerodynamic airfoil

optimization

Schedule & Planned Milestones:

Compressor Aero-Efficiency Techs.

Risks/Mitigations • Achievement of performance and operability targets

- Utilize multi-stage rigs for early validation - Execute redesign, if needed, and utilize lower-

level rigs for progressive validation before engine demo

• Completed post test technical review

2015 2016 2017 2018 2019 2020

Engine

Test

Final

Report

Rig

Tests

Kickoff Redesign Fab &

Build

©2018 United Technologies Corporation This document has been publicly released

5

Page 6: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

Benefits: • Improved thermal efficiency

‒ ~ 0.8 – 1.0% fuel burn reduction

Prior Accomplishments:

Work Statement: Continue the TRL advancement of turbine aero-efficiency and durability technologies via CFD studies, detailed design, fabrication, and full-scale rig tests.

Objectives: Demonstrate improved

high pressure turbine efficiency via

advanced aerodynamic airfoil and

durability optimization

Schedule & Planned Milestones:

Turbine Aero-Efficiency & Durability

Risks/Mitigations • Technology interaction prevents assessment of

contribution of individual items – Execute additional rig trials to isolate • Testing delayed due to linear build schedule – Procure additional hardware to facilitate parallel

build • New facility debugging – Actively working to understand failure modes and

backup facility hardware

• Completed cascade component fabrication • Completed START rig instrumentation &

calibration • baseline testing underway

2015 2016 2017 2018 2019 2020

Tech

Test Start

Final

Report

CFD Studies

& Design

Kickoff Base

Fab

Tech

Fab

Base

Testing

Tech

Testing

Base

Test Start

Base Tests

Complete

Tech Test

Complete

6 ©2018 United Technologies Corporation

This document has been publicly released

Page 7: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

What if the FAA CLEEN program didn’t exist? CLEEN TECHNOLOGY DEMONSTRATORS

Missed opportunity to develop fuel-burn reduction technologies that would mature in time for insertion into future product upgrades and new engine offerings... Missed opportunity to reduce emissions in candidate product upgrades and future new aircraft fleet... Reduced competitiveness in the global marketplace relative to foreign aerospace technology development activities, which may lead to a business disadvantage... ...FAA CLEEN funding has been critical to developing new

technologies for future aircraft engines.

©2018 United Technologies Corporation This document has been publicly released

7

Page 8: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

Program Schedule CLEEN TECHNOLOGY DEMONSTRATORS

2015 2016 2017 2018 2019 2020

HPC Techs. Fabrication/Assembly Rig Test Engine Development Program Fabrication / Assembly Analysis/Redesign

HPT Techs. Design Base Fab / Assembly Base Testing Fab Tech Testing

Photo Credit: MTU

Photo Credit: Penn State University

UHB Techs. Fab & Assemb

Rig Test

Eng Test Fabrication / Assembly

Photo Credit: NASA

©2018 United Technologies Corporation This document has been publicly released

8

Page 9: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

Key technology demonstrators running or completed test HPC rig post test evaluation completed Post test hardware acceptable Engine demo in planning phase PSU HPT START facility upgrade shakedown completed Baseline turbine test in process Technology hardware casting in process HPT Cascade Testing proceeding Rig assembly complete Baseline geometry testing in process Technology geometry test articles in production

Program Overview – Summary Status

©2018 United Technologies Corporation This document has been publicly released

9

Page 10: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN II High Pressure Compressor Technologies

Compressor Rig

©2018 United Technologies Corporation This document has been publicly released

Page 11: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

Maturation Strategy

HPC Technology

TRL 2

TRL 3

TRL 4

TRL 5

TRL 6

Multi Stage Rig

Full Scale Rig

CFD design/analysis

Demo Engine

Cascade, Unit Rig

Concept Initiation

Photo Credit: MTU

Photo Credit NRC Canada

©2018 United Technologies Corporation This document has been publicly released

11

Page 12: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

HIGH PERFORMANCE CORE

HPC Scope under CLEEN II completed mid 2017

HPC Technology - Schedule

2015 2016 2017 2018 2019 2020

Project Manag

Program Tasks Jan

Submittal

Oct

Start

Program

End

Risk

Assessment

HPC Rig

Test Report

HPC

TRR

Design

Fab, Proc, Assy

Tech Demo

Assess & Report

Completed prior to Program Start

Photo Credit: MTU

©2018 United Technologies Corporation This document has been publicly released

12

Page 13: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

HIGH PERFORMANCE CORE

Engine representative hardware Multi-stage optimization over range of operating conditions Aerodynamic & operability Broad range of engine sensitivities Comprehensive instrumentation set

HPC Technology – Key Attributes

©2018 United Technologies Corporation This document has been publicly released

13

Page 14: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

Rig check out andcharacterization

Operability

Aero & performance

Sensitivities

HIGH PERFORMANCE CORE

Extensive instrumentation suite for compressor characterization and technology optimization Testing focused on technology maturation and compressor optimization

HPC Technology– Test and Instrumentation

Inlet performance, operability &aero diagnostics

Stage performance & operability

Secondary air flow and thermals

Exit performance & aerodiagnostics

Rig environment & health/safety

Instrumentation Distribution

Test Distribution

©2018 United Technologies Corporation This document has been publicly released

14

Page 15: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

HIGH-PERFORMANCE CORE

Rig was transferred to test cell on July 21, 2016

HPC Technology– Rig Assembly

Photo Credit: MTU

©2018 United Technologies Corporation This document has been publicly released

15

Page 16: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

HIGH-PERFORMANCE CORE

Rig installed in test cell and functional check August 23, 2016

HPC Technology – Rig Installation

Photo Credit: MTU

©2018 United Technologies Corporation This document has been publicly released

16

Page 17: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

HIGH-PERFORMANCE CORE

Over 100 hours of testing conducted Robust instrumentation suite (> 99% survivability) Adapted to minor adjustments to test plan to react to rig learning

HPC Technology – Test and Instrumentation

Instrumentation

Inle

t Per

form

ance

and

Dia

gnos

itics

Stag

e Pe

rform

ance

&O

pera

bilit

y

Seco

ndar

y Ai

r &Th

erm

als

Exit

Perfo

rman

ce &

Dia

gnos

tics

Rig

Env

ironm

ent &

Hea

lth/S

afet

y

As BuiltFunctional

Test

Rig Check Out &Characterization

Operability Aero &performance

Sensitivities

Plan

Actual

©2018 United Technologies Corporation This document has been publicly released

17

Page 18: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

HIGH-PERFORMANCE CORE

Technology projections achieved, detailed assessment in process

Performance benefits from both technology maturation and compressor optimization

Aero technologies

Manufacturing technologies

Mechanical design technologies

HPC Technology – Testing Completed Oct 28th, 2016

Aerodynamic

Manufacturing/Mechanical

Optimization

©2018 United Technologies Corporation This document has been publicly released

18

Page 19: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

Completed data assessment and test reporting Compressor mapping & characterization (reference - for illustration only)

Clearance and surge behavior

HIGH-PERFORMANCE CORE HPC Technology – Data Analysis

Nominal

Operating Line

Test Surge Line

Goal Surge Line

Design Speed

2.5% SM Increase

1.5% Flow Diff93% Speed

107% Speed

Design Speed Less than 0.2%

h difference

©2018 United Technologies Corporation This document has been publicly released

19

Page 20: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS HPC Technology – Data Assessment & Next Steps

Data assessment completed Improved GTF HPC achieved Extensive instrumentation enables detailed HPC understanding Comprehensive sensitivities study completed Results comparable to CFD predictions Demo engine planning in process

Leading Edge Kielhead Data Local/Average

Pressure Local/AverageTemperature

Airfoil Surface Static Pressure

CFD Data

©2018 United Technologies Corporation This document has been publicly released

20

Page 21: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN II High Pressure Turbine Technologies

©2018 United Technologies Corporation This document has been publicly released

Page 22: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

Maturation Strategy

HPT Technology Status

TRL 2

TRL 3

TRL 4

TRL 5/6: Aero

TRL 6: Durab.

High-speed cascade Low-speed rig

Un-cooled high-speed rig testing

CFD design/analysis

Demo Engine

Wind tunnel Low-speed cascade

Cooled high-speed rig testing

TRL 5: Durab.

Concept Initiation

Flow

Image Credit: Penn State University

Image Credit: Penn State University

©2018 United Technologies Corporation This document has been publicly released

22

Page 23: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS HPT Technology Status - Schedule

2015 2016 2017 2018 2019 2020

Program Tasks Program

End

HPT Rig

Test Report

Rig TRR

Design Fab, Proc, Assy

Tech Testing Assess & Report

Baseline Testing

Baseline

start

HPT scope underway, Industrial and Baseline Testing Phases

SEC

Design Fab, Proc, Assy

START

Technology Testing Assess & Report

©2018 United Technologies Corporation This document has been publicly released

23

Page 24: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN II High Pressure Turbine Technologies START Rig

©2018 United Technologies Corporation This document has been publicly released

Page 25: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

• Use rig data for validation of aero design and durability pretest predictions

• Use flowfield and thermal measurements to validate performance improvement

• Understand cooling losses and loss modeling details • Verify full-span 3D aero • Correlate rig/engine maps for cooled turbine aero and

durability • Validate thermal predictions & demonstrate improved

cooling capability

START test objectives

©2018 United Technologies Corporation This document has been publicly released

25

Page 26: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

PSU START rig Baseline cavity testing complete

Integrate the exit traverse system into the PSU START rig

Complete PSU START rig baseline Aero testing

Complete Single Element Cascade (SEC)

Rig fabrication and assembly complete

Baseline Aero testing complete

Thermal technology airfoil testing in-process

HPT Technology – Near Term Milestones Status

©2018 United Technologies Corporation This document has been publicly released

26

Page 27: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

START = Steady Thermal Aero Research Turbine. ~$10M invested into the facility over the past 5 years Pratt and Whitney Center of Excellence, World Class Facility

History of the START rig facility

2013 2018

All Photo and Image Credits: Penn State University

©2018 United Technologies Corporation This document has been publicly released

27

Page 28: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

February 2012: Ground broken on the PSU START facility

CLEEN TECHNOLOGY DEMONSTRATORS PSU START Facility

All Photo and Image Credits: Penn State University

©2018 United Technologies Corporation This document has been publicly released

28

Page 29: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

May 2012: First of two planned compressor units installed

CLEEN TECHNOLOGY DEMONSTRATORS PSU START Facility

All Photo and Image Credits: Penn State University

©2018 United Technologies Corporation This document has been publicly released

29

Page 30: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

March 2013: Cooling system for the compressor installed

CLEEN TECHNOLOGY DEMONSTRATORS PSU START Facility

All Photo and Image Credits: Penn State University

©2018 United Technologies Corporation This document has been publicly released

30

Page 31: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

January-June 2014: Facility air piping completed

PSU START Facility

All Photo and Image Credits: Penn State University

©2018 United Technologies Corporation This document has been publicly released

31

Page 32: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

August 2014: Installation of turbine test section and start of facility utilization

CLEEN TECHNOLOGY DEMONSTRATORS PSU START Facility

All Photo and Image Credits: Penn State University

©2018 United Technologies Corporation This document has been publicly released

32

Page 33: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

October-November 2014: Installation of second air compressor

CLEEN TECHNOLOGY DEMONSTRATORS PSU START Facility

All Photo and Image Credits: Penn State University

©2018 United Technologies Corporation This document has been publicly released

33

Page 34: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

Under CLEEN II...

Plumbing of second compressor

Doubling of compressor cooling capacity

Natural gas heating chamber added for hot flow path testing

Water brake dynamometer installation, with cooling system

Installation of shaft torque meter

Turbine cooling air chillers installed and plumbed

Control room completed with Data Acquisition System

Half height test section to full span test section

Additional Instrumentation

CLEEN TECHNOLOGY DEMONSTRATORS PSU START Facility

(Above) Dyno H2O wells being

installed, 2016

(Left) Natural Gas Heating Chamber

All Photo and Image Credits: Penn State University

©2018 United Technologies Corporation This document has been publicly released

34

Page 35: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

Facility upgrade complete – full span, multi-stage, cooling capable Increased capability, enhanced instrumentation & controls

HPT Technology Status – High Speed Rig Testing

All Photo and Image Credits: Penn State University

©2018 United Technologies Corporation This document has been publicly released

35

Page 36: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS Torque meter & dyno installation

Sp

eed

Time

To

rqu

e

Calibration complete

All Photo and Image Credits: Penn State University

©2018 United Technologies Corporation This document has been publicly released

36

Page 37: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

Rig instrumented and calibrated Rig shakedown complete Baseline turbine testing in-process

HPT Technology – High Speed Rig Testing

All Photo and Image Credits: Penn State University ©2018 United Technologies Corporation

This document has been publicly released

37

Page 38: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

System design & bench testing in-process

Utilizes Individual blade heat flux sensors developed at PSU’s Advanced nanofabrication technology to create next-generation gage design

START Rotating Heat flux System

Anthony et al. 2011

©2018 United Technologies Corporation This document has been publicly released

38

Page 39: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN II High Pressure Turbine Technologies

Single Element Cascade Rig

©2018 United Technologies Corporation This document has been publicly released

Page 40: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

Measure film cooling effectiveness and aerodynamic loss on high-lift airfoil sections comparing Nominal and advanced Cooling-hole shapes at relevant operating conditions

Generate high-quality aero/thermal data to validate analytical models

Enhance understanding of performance losses due to film-cooling

SEC Test Objectives

©2018 United Technologies Corporation This document has been publicly released

Example of Raw IR Image Data

40

Page 41: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

High-speed Film-cooling Test at UTRC’s Cascade facility

Aero-Durability cascade facility to bridge gap between fundamental flat-plate experiments and rig/engine tests

Single Element Cascade (SEC) Overview

Single Element Cascade assembly ©2018 United Technologies Corporation

This document has been publicly released

41

Page 42: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

Cascade rig special test equipment Guidewalls, airfoil, & IR window fab complete

Rig assembly complete

Uncooled Aero Baseline Testing complete

HPT Technology Status – Cascade Testing

SEC IR windows Flow visualization ©2018 United Technologies Corporation

This document has been publicly released

42

Page 43: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

START rig fully instrumented and calibrated for cavity flow testing and aero cavity testing complete

Single element cascade rig fabrication and uncooled aero testing complete

FAA technology blade fabrication in-process

START aero & thermal testing equipment fabrication in-process

PSU START rig Integrate the exit traverse system into the PSU START rig

Complete PSU START rig baseline Aero testing

Single Element Cascade (SEC) Complete Thermal technology airfoil testing

HPT Technology – Summary & Next Steps

©2018 United Technologies Corporation This document has been publicly released

43

Page 44: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

PUREPOWER® GTF ENGINE APPLICATIONS 80+ Customers/8000+ Engine Orders Including Firm Orders and Options

UHB Technologies HPC Technologies HPT Technologies

©2018 United Technologies Corporation This document has been publicly released

44

Page 45: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

CLEEN TECHNOLOGY DEMONSTRATORS

P&W CLEEN programs progressing to plan Technology delivering improved GTF performance

HPT technology facility upgrades completed HPT technology testing underway

HPC technology rig performance assessment complete

Summary

©2018 United Technologies Corporation This document has been publicly released

45

Page 46: CLEEN TECHNOLOGY DEMONSTRATOR CLEEN II: HIGH …€¦ · Installation of shaft torque meter Turbine cooling air chillers installed and plumbed Control room completed with Data Acquisition

THANK YOU

©2018 United Technologies Corporation This document has been publicly released

46