US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC ANALYSES NOTES: 1) All elevations listed in this report are referenced to NGVD. 2) Unless noted otherwise, river mile (RM) locations referred to in this report DO NOT correspond to “historic” RM locations on the Black River. FEBRUARY 2004 CESWL-EC-HH

Transcript of CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District...

Page 1: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC ANALYSES NOTES:

1) All elevations listed in this report are referenced to NGVD. 2) Unless noted otherwise, river mile (RM) locations referred to in

this report DO NOT correspond to “historic” RM locations on the Black River.

FEBRUARY 2004 CESWL-EC-HH

Page 2: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

CLEARWATER DAM BLACK RIVER, MISSOURI

MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC ANALYSIS

TABLE OF CONTENTS

1. Introduction . . . . . . . . . . . . . . . . . . . . . 4 2. General . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1 Scope of Work . . . . . . . . . . . . . . . . . . . . 4 2.2 Project History . . . . . . . . . . . . . . . . . . . 4 2.3 Clearwater Dam Pertinent Data . . . . . . . . . . . . 5 2.4 Basin Description . . . . . . . . . . . . . . . . . . 7 2.5 Previous Studies . . . . . . . . . . . . . . . . . . 8 2.6 Mapping . . . . . . . . . . . . . . . . . . . . . . . 8 3. Hydrologic Analysis . . . . . . . . . . . . . . . . . . 9 3.1 Existing Condition and Seepage Dam Failure Scenario . 9 3.1.1 Clearwater Lake Inflow Design Flood . . . . . . 9 3.1.2 Intervening Inflow below Clearwater Dam . . . . 10 3.1.3 Clearwater Lake Flood Routings . . . . . . . . 11 3.1.3.1 Existing Condition Routings . . . . . . 11 3.1.3.2 Dam Breach Routings . . . . . . . . . . 12 3.1.4 Downstream Flood Routings . . . . . . . . . . . 14 3 .2 Pool Elevation-Frequency . . . . . . . . . . . . . . . 14

4. Hydraulic Analysis . . . . . . . . . . . . . . . . . . 15 4.1 Black River Unsteady Flow Model . . . . . . . . . . . 15 4.1.1 Existing Conveyance System . . . . . . . . . . 18 4.1.2 Model Geometry . . . . . . . . . . . . . . . . 18 4.1.2.1 Valley Cross-Sections . . . . . . . . . 18 4.1.2.2 Channel Cross-Sections . . . . . . . . . 18 4.1.2.3 Road Crossings . . . . . . . . . . . . . 19 4.1.2.4 Levees . . . . . . . . . . . . . . . . . 19 4.1.2.5 Storage Areas . . . . . . . . . . . . . 19 4.2 Existing Condition Discharge Rating . . . . . . . . . 20 5. Results of Analyses . . . . . . . . . . . . . . . . . . 21 5.1 High Pool Seepage Dam Failure Scenario . . . . . . . . 23 5 .2 Low Pool Seepage Dam Failure Scenario . . . . . . . . 26

6. References . . . . . . . . . . . . . . . . . . . . . . 28

C-2

Page 3: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

LIST OF TABLES Table C-1 Clearwater Project Pertinent Data Table C-2 Unit Hydrograph Coefficients and Basin

Characteristics for Drainage Area below Clearwater Dam

Table C-3 Summary Results of Clearwater Lake Existing Condition Flood Routings Table C-4 Summary Results of Clearwater Lake Dam Breach Simulations Table C-5 Clearwater Lake Pool Elevation-Frequency Data Table C-6 Existing Conditon Spillway Pool Elevation-Discharge

Rating Table C-7 Maximum Increase in Flood Heights [FT]: Dam Failure

vs. Existing Condition W/O Failure Table C-8 20% PMF Seepage Failure Dam Breach Scenario – Peak

Flood Elevations and Times to Peak at Locations below Clearwater Dam

Table C-9 100% PMF Seepage Failure Dam Breach Scenario - Peak Flood Elevations and Times to Peak at Locations below Clearwater Dam

Table C-10 Pool at EL 505.0 FT Seepage Failure Dam Breach Scenario - Peak Flood Elevations and Times to Peak at Locations below Clearwater Dam

LIST OF FIGURES

Figure C-1 Hydraulic Model Layout at Poplar Bluff

LIST OF PLATES

Plate C-1 Clearwater Lake Pool Elevation-Duration Curve Plate C-2 Clearwater Lake Inflow Design Flood Plate C-3 Existing Condition Spillway Discharge Rating Curve Plate C-4 High Pool Seepage Dam Breach Outflow Hydrographs Plate C-5 High Pool Seepage Dam Failure Profiles Plate C-6 Low Pool Seepage Dam Breach Outflow Hydrograph Plate C-7 Low Pool Seepage Dam Breach Failure Profiles Plate C-8 High Pool Seepage Dam Breach – Maximum Increase in Flood Heights Due to Failure Plate C-9 Low Pool Seepage Dam Breach – Maximum Increase in Flood Heights Due to Failure Plate C-10 Pool Elevation-Frequency Curve with Confidence Limits

C-3

Page 4: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

1. Introduction Clearwater Dam is located at river mile (RM) 257.4 of the Black River in Wayne County, Missouri, approximately 5.0 miles southwest of Piedmont, Missouri, and approximately 49.2 river miles upstream of Poplar Bluff, Missouri. Purpose of the hydrologic and hydraulic analyses associated with the major rehabilitation study is to provide downstream maximum flood heights and flood wave travel times that can be expected to result from seepage related dam breaches. Engineering and Construction Division, Hydrology and Hydraulics Section (EC-HH) performed analyses in support of this study. This report was developed by EC-HH as an appendix to the main study report. Described herein are the hydrologic and hydraulic analyses completed and the results obtained. 2. General 2.1 Scope of Work Hydrologic and hydraulic analyses were performed for several hydrologic events that might result in a seepage related dam breach – pool at elevation 505.0 feet; 20% PMF resulting in peak pool elevation 581.4 feet with pool receded to elevation 574.7 feet at time of breach; and 100% PMF resulting in peak pool elevation 611.2 feet with pool receded to elevation 593.0 feet at time of breach. It is expected for pool elevations below about elevation 505.0 feet there would be enough warning time to avoid a dam failure by evacuating the pool to a safe level before a breach formed. Failure and non-failure analyses were performed for each event. Failure verses non-failure results were compared to determine the difference in flood heights and flood wave arrival time at various points of interest downstream of the dam. 2.2 Project History The Flood Control Act of 1938 authorized the project and construction was completed in 1948. The dam is an earth embankment with a gated conduit for controlled flood releases and an uncontrolled emergency spillway in the right abutment. Significant modifications to the earth embankment and to the emergency spillway were constructed in 1989. The upstream side of the earth embankment was modified by addition of a stability berm at the toe of the embankment, and addition of a clay seepage berm which extends up to about EL 575 FT. A concrete parapet wall with top EL 611.0 FT was added to the top of the dam at the upstream side to provide 3 feet of freeboard above

C-4

Page 5: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

the elevation of the top of the dam. The emergency spillway was significantly widened but construction was stopped before the 280 FT of additional design width was attained. Attainment of the design width would have provided a spillway crest length of 470 feet at EL 567.0 FT. 1989 post construction surveys indicate effective spillway crest length is about 330 feet at EL 567 FT, with an additional 110 feet on the right end ranging from EL 567 FT to about EL 571 FT. Rubble remains along the right bank of the spillway, restricting the spillway width to less than the design width through much of the spillway reach. It is important to note the required emergency spillway design width developed for the 1989 construction effort may be incorrect due to changes in guidance and technology for the development of a reservoir inflow design flood (IDF). The IDF routed for determination of the required spillway width was developed in 1979 in accordance with Corps of Engineers Engineering Circular (EC) 1110-2-163 (25 August 1975), Southwest Division letter SWDED-XW (15 February 1979), and National Weather Service (NWS) Hydrometerological Report No. 51 (HMR-51) dated June 1978. Manual methods were used for the distribution and centering of the spillway design storm over the contributing watershed. Three iterations were used to determine the critical storm center. After 1979 computer program HMR-52 was developed to provide a more efficient and sophisticated means of implementing the HMR-51 guidance for rainfall distribution and storm centering. HMR-52 provides an efficient means of performing many iterations to determine the critical storm center. Criteria for development of IDF’s has also changed since 1979 in that current guidance (ER 1110-8-2 (FR), Inflow Design Floods for Dams and Reservoirs, 1 March 1991) suggests reservoir inflow unit hydrographs for IDF determinations should be peaked 25 to 50 percent to account for the fact that unit hydrographs are usually derived from smaller floods. Unit hydrograph peaking was not done for the 1979 IDF development effort. A new spillway adequacy study based on current criteria for development of the IDF and using current technology is being considered for separate submittal under the dam safety assurance program. 2.3 Clearwater Dam Pertinent Data Pertinent data for the project are presented in Table C-1.

C-5

Page 6: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

Table C-1 Clearwater Project Pertinent Data

Clearwater Dam: Location: River Mile 257.4 on the Black River, Wayne

County, Missouri Approximately 4.5 miles west of Piedmont, MO Drainage Area: 898 square miles One inch of runoff = 47,890 acre-feet Dam: Type: Earthen Top of Dam, feet NGVD 608 Streambed, feet NGVD 454 Height, above streambed, feet 154

Top of Parapet Wall, feet NGVD 611 Crest Length, feet 4,225 Spillway: Type: Side Saddle Uncontrolled Crest Elevation, feet NGVD 567 * Net Length, feet 470 * Discharge @ Elevation 574 in CFS 22,750 @ Elevation 602.5 in CFS 283,900 * Design Discharge, CFS 353,000 Outlet Works: Type: Concrete Lined Tunnel Diameter, feet 23 Gates (tractor type), number/size 3 / 9’ X 20’ Capacity @ Elevation 567 in CFS 25,000 Construction Dates: Initiated: 1940 Completed: 1948 Modifications Initiated: 1988 ** Modifications Completed: N/A * With spillway excavated to design width ** Parapet wall, stability berm and dam seepage berm completed; spillway widening effort stopped short of design width.

C-6

Page 7: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

Table C-1 (Cont.) Clearwater Project Pertinent Data

Clearwater Lake:

Lake Storage Capacity# Elev [ft, NGVD]

Lake Area [ac]

Cumulative[ac-ft]

Runoff[in]

Incremental [ac-ft]

Spillway Capacity[cfs]

Top of Parapet Wall

611 - - - - -

Top of Dam 608 - - - - - Max. Design Water Surface##

607.7 18,485 1,008,150 21.05 594,450 353,000

Reservoir Easement Area Contour

572 11,210 469,840 - - -

Top of Flood Control Pool

567 10,400 413,700 8.64 391,780 -

Top of Conservation Pool###

494 1,630 21,920 0.46 21,920 -

Entrance Invert Elevation

467 - - - - -

Streambed at Dam

454 - - - - -

# Prior to berm construction in 1989. ## With spillway excavated to design width; at its current width the maximum probable water surface is about elevation 611. ### Seasonal (May-Sep) top of conservation pool is EL 498 FT. In recent years a deviation to seasonal top of conversation pool EL 500 FT has been in effect. 2.4 Basin Description The Black River drainage basin above Poplar Bluff, MO, lies in the foothills of the Ozark Mountains and consists of approximately 1246 sq-mi. 898 sq-mi lies above Clearwater Dam, and 348 sq-mi contributes flow to the Black River between Clearwater Dam and Poplar Bluff. The elongated basin is approximately 90 miles in length with width ranging from as little as about 5 miles in the lower end to as much as about 30 miles in the upper end. Elevations range from about 330 FT at Poplar Bluff to about 1300 FT in the upper reaches of the basin. Lateral tributaries to the Black River within this basin are numerous and generally of short length and steep grade.

C-7

Page 8: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

2.5 Previous Studies Previous hydrologic and hydraulic studies include:

a) Dam Safety Hydrologic and Hydraulic Studies for Spillway Adequacy and Downstream Land Acquisition, August 1979. The spillway design flood (SDF) was developed in accordance with Corps of Engineers Engineering Circular (EC) 1110-2-163 (25 August 1975), Southwest Division letter SWDED-XW (15 February 1979), and National Weather Service (NWS) Hydrometerological Report No. 51 (HMR-51) dated June 1978. Top of dam at the time of this study was EL 608.0 FT. With the top of dam artificially extended to contain the SDF, the maximum pool reached EL 618.6 FT, or 10.6 feet higher than the existing dam. The study concluded a spillway crest length of 540 feet was required to safely pass the SDF for top of dam EL 608.0 FT.

b) Project Modification for the Dam Safety Assurance Program, Feature Design Memorandum No. 1, September 1983. This report concluded an additional 280 feet of spillway width (for a total crest length of 470 feet at EL 567.0 FT) was required to safely pass the SDF for effective top of dam EL 611.0 FT; top of earth embankment at EL 608.0 FT and top of concrete parapet wall at EL 611.0 FT to provide required freeboard.

2.6 Mapping Mapping for the studied reach of the Black River was developed from digital U.S. Geological Survey (USGS) 1:24000 scale quadrangle maps. Map coordinates are referenced to Missouri State Plane Coordinate System (MO-SPCS), East Zone, North American Datum of 1983 (NAD83). The mapping (and study documentation) designates locations along the studied reach of the Black River by river mile, but due to differences in stationing techniques (historic paper/manual vs. modern digital) the river miles do not necessarily coincide with historic river mile designations for the Black River. The historically designated river mile for Clearwater Dam at RM 257.4 was assumed to represent the true distance along the Black River from its confluence with the White River near Newport in northeast Arkansas. The historic river mile designation at Clearwater Dam was used as the starting point for Black River stream stationing from Clearwater Dam downstream to just below Poplar Bluff, Missouri. In the hydraulic model, locations along the studied reach are referenced to both river mile, and stream stationing in feet. Stream stationing in feet may be divided by 5280 for direct conversion to corresponding river mile.

C-8

Page 9: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

3. Hydrologic Analyses 3.1 Existing Condition and Seepage Dam Failure Scenario A controlled lake release of 4000 cfs was used in conjunction with the pool at EL 505 FT for both existing condition analysis and as the antecedent condition for a dam breach with the pool at EL 505 FT. This is consistent with the reservoir regulation plan of operation for pool elevations in this low range. High pool elevation analyses performed for existing conditions and the seepage dam failure scenario were based on the Clearwater Lake IDF and estimated corresponding runoff for the 350 sq-mi of intervening drainage area between Clearwater Dam and a point just downstream of Poplar Bluff, Missouri. The IDF consists of an antecedent event, the standard project flood (SPF), followed five days by the probable maximum flood (PMF). The SPF effectively utilizes all available flood storage in the lake, thus the onset of the subsequent PMF occurs with the pool at approximately the top of the flood control pool. The analyses required modeling the PMF and a range of incrementally lesser magnitude flood events. Runoff hydrographs for the lesser magnitude flood events, or %PMF’s, were derived directly from the Clearwater Lake IDF hydrograph and corresponding computed downstream runoff hydrographs by uniform, linear scaling of the respective PMF hydrograph ordinates to produce the “90% PMF” hydrographs, “80% PMF” hydrographs, etc. Each of the lesser magnitude events consists of the 100% SPF antecedent event followed by a percentage of the PMF event. 3.1.1 Clearwater Lake Inflow Design Flood The Clearwater Lake IDF hydrograph was developed in 1979 (see 2.4, Previous Studies, part a)). The IDF has a peak discharge of 603,470 cfs with a runoff volume of 1,156,020 acre-feet (including base flow). The IDF hydrograph is shown on Plate C-1. Criteria for development of IDF’s has changed since 1979 in that current guidance (ER 1110-8-2 (FR), Inflow Design Floods for Dams and Reservoirs, 1 March 1991) suggests reservoir inflow unit hydrographs for IDF determinations should be peaked 25 to 50 percent to account for the fact that unit hydrographs are usually derived from smaller floods. The Clearwater Lake IDF as developed in 1979 was assumed to be sufficiently accurate for purposes of assessing the adequacy of the dam for high pool elevations with respect to failure resulting from seepage.

C-9

Page 10: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

3.1.2 Intervening Inflow below Clearwater Dam A method of estimating runoff for the intervening drainage area between Clearwater Dam and Poplar Bluff, Missouri, which could be expected to correspond to the Clearwater Lake IDF and respective %PMF flood events of incrementally lesser magnitude, was needed. Storms that would produce very large inflow to Clearwater Lake may be expected to be widespread, resulting in significant runoff for the intervening drainage area. Significant intervening inflow occurring coincident with a Clearwater Lake flood release may be expected to affect flood heights and the speed with which a flood wave migrates down the valley. The intervening drainage area was divided into three sub-basins (Upper, Middle, and Lower). HEC-HMS version 2.1.3 (Oct 2001) was used to build a rainfall-runoff model used to produce a runoff hydrograph for each that might be expected to result from occurrence of the storm events from which the Clearwater Lake IDF was developed (Standard Project Storm (SPS) followed by the Spillway Design Storm (SDS)). The Clearwater Lake IDF analysis included SPS and SDS hyetographs representing precipitation falling directly on the lake at flood pool elevation. This rainfall data was used directly as representative of rainfall over the intervening drainage area. This assumption is reasonably accurate for the Upper sub-basin due to its close proximity to Clearwater Lake, and is conservative for the more distant Middle and Lower sub-basins. The initial loss (0.50 inches) and infiltration loss rate (0.03 in/hr) used in the development of the Clearwater Lake IDF were used directly. Snyder unit hydrograph parameters for each of the sub-basins were estimated based on an existing analysis of the actual Snyder unit hydrograph parameters for known flood events at many gaged basins in the Little Rock District. Drainage areas were determined from USGS 1:24000 scale topographic maps. Unit hydrograph coefficients and basin characteristics are shown in Table C-2.

TABLE C-2 Unit Hydrograph Coefficients and Basin Characteristics for

Drainage Area below Clearwater Dam Sub-Basin

D.A. [sq-mi]

L [mi]

Lca [mi]

Sst [ft/ft]

Ct 640Cp Cp Tp [hrs]

Upper 87 18.10 3.93 0.0027 1.3 350 0.547 4.67Middle 146 31.61 16.38 0.0017 1.7 310 0.484 11.08Lower 117 33.23 17.01 0.0004 4.3 300 0.469 28.78

C-10

Page 11: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

The basin model used for computing the intervening inflow hydrographs was named “CW Dam to PB EX”, contained in HEC-HMS project file “Clearwater Dam”. 3.1.3 Clearwater Lake Flood Routings HEC-HMS version 2.1.3 (Oct 2001) was used to build a reservoir model and perform the respective flood routings for existing conditions. The IDF and lesser magnitude %PMF events were routed through Clearwater Lake, resulting in lake release hydrographs for the respective events. HEC-HMS uses the Modified-Puls method to perform reservoir routings. Authorized top of conservation pool is EL 494.0 FT with authorized seasonal (summer months) adjustment to EL 498.0 FT. Top of seasonal conservation pool EL 500.0 FT has been in effect via approved deviation for at least six years and is expected to continue indefinitely. Therefore, the pool was conservatively assumed to be at EL 500.0 FT at the start of the routings. No conduit releases were made during the routings as concurrent flooding downstream likely would not permit such releases. Pool elevation-storage data was drawn from the Clearwater Lake Water Control Manual (1995). The reservoir model used for the existing condition routings was named “CW Res Only EX”, contained in HEC-HMS project file “Clearwater Dam”. 3.1.3.1 Existing Condition Routings Existing condition routings used a pool elevation-discharge rating for the spillway based on existing conditions. The existing condition spillway discharge rating is shown on Plate C-2. Existing condition routing of the IDF resulted in a peak pool elevation of 611.2 FT (0.2 feet higher than the top of the parapet wall) with a corresponding peak spillway discharge of 315,000 cfs. Pool elevation remained above top of design pool EL 608.0 FT for 12 hours during which time pool elevation slightly exceeded top of parapet wall EL 611.0 FT for 3 hours. Overflow of the dam was ignored for purposes of this study. Summary results of the routings are shown in Table C-3.

C-11

Page 12: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

TABLE C-3 Summary Results of Clearwater Lake Existing Condition Flood

Routings (Started at Pool EL 500.0 FT) %PMF Event

Peak Inflow* [cfs]

Peak Outflow [cfs]

Peak Pool EL [ft]

100 603,000 315,000 611.290 543,000 280,000 608.180 483,000 247,000 604.970 423,000 215,000 601.860 362,000 185,000 598.650 302,000 152,000 594.940 242,000 118,000 590.830 182,000 82,800 586.320 121,000 51,800 581.410 61,000 33,700 578.1

* Peak inflow for the %PMF event following the full SPF which produced an antecedent peak inflow of 303,000 cfs. 3.1.3.2 Dam Breach Routings HEC-1 version 4.1 (1998) was used to build a reservoir model and perform the dam breach analyses associated with the seepage dam failure scenario. HEC-HMS currently does not feature dam break analysis functionality. HEC-1 input files for the model runs are named “SDB20.DAT” (20% PMF event) thru “SDB100.DAT” (100% PMF event) and “EDB_505.DAT” (pool at EL 505.0 FT) with corresponding output files named “SDBXXX.OUT”. Geotechnical engineers (EC-DG) provided estimates of conditions expected to result in a seepage induced dam breach and the expected breach geometry. It was estimated a seepage related dam breach might occur as a result of low pool elevations of relatively long duration or high pool elevations of relatively short duration. Pool EL 505 FT is equaled or exceeded about 9.3% of the time on an average annual basis and was selected for the low pool elevation breach analysis. The Clearwater Lake pool elevation-duration curve is shown on Plate C-1. For high pool elevations of relatively short duration it was estimated a dam breach would begin to form if the pool exceeded EL 575.0 FT, about the top of the seepage berm, for a total of 95 hours during the course of an event. Results of the existing condition flood routings indicated flood events equaling or exceeding approximately the 20% PMF event would produce this condition. Erosion to full estimated breach geometry was estimated to occur in one hour. Fully developed breach geometry was estimated as a trapezoidal shape with a 100 foot bottom

C-12

Page 13: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

width at EL 478.0 FT and 1H:1V side slopes extending to the top of the earthen embankment at EL 608.0 FT. The pool elevation hydrograph resulting from the existing condition (without failure) flood routing was reviewed to determine the hour at which a breach was expected to begin forming, and the pool elevation at that hour. The HEC-1 dam break model was started at this hour and pool elevation. The model used the simulation start time to reference the applicable reservoir inflow hydrograph at the appropriate time step and used the inflow hydrograph from that point forward in the dam break simulation. All breaches started with the pool in recession. Dam break analyses for the seepage dam failure scenario used the existing condition spillway rating. The dam breach simulation option in the HEC-1 software does not allow direct input of a user defined spillway rating curve. Uncontrolled spillways must be defined in terms of the standard weir equation and the program internally computes spillway outflow. The following values used in the dam break simulations were determined to produce a spillway rating very closely approximating the existing condition rating developed with the HEC-RAS backwater model: C = 1.9365, L = 380 FT, Hexp = 1.5990. Overtopping of the dam itself was not a factor for any of the dam breach simulations performed. Summary results of the dam breach simulations for the seepage dam failure scenario are shown in Table C-4.

TABLE C-4 Summary Results of Clearwater Dam Breach Simulations

Event

Peak Outflow [cfs]

Pool EL at Start of Breach [ft]

Inflow at Start of Breach [cfs]

Outflow at Start of Breach [cfs]

100% PMF 827,000 593.0 6,880 134,00080% PMF 723,000 587.5 3,640 92,30060% PMF 643,000 582.7 1,700 60,20040% PMF 578,000 578.5 898 36,30020% PMF 523,000 574.7 732 19,400Pool at

EL 505.0 FT 51,000 505.0

700 4,000

C-13

Page 14: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

3.1.4 Downstream Flood Routings Routing of the Clearwater Lake outflow hydrograph and associated runoff hydrographs for the intervening drainage area, for each respective flood event analyzed, was performed in the unsteady flow hydraulic model of the Clearwater Dam to Poplar Bluff reach of the Black River. 3.2 Pool Elevation-Frequency The current Clearwater Lake pool elevation-frequency curve is based on the results of SUPER Model W95X02 simulation of the 1940-1992 period of record inflows with the 1993 reservoir control plan of operation. Computed annual maximum pool elevations were plotted using the median plotting position formula (aka “Chegodayev’s” formula) and used as a guide for the hand drawn curve. Confidence limits about this curve were developed using the HEC-FDA program which incorporates the procedures described in ETL 1110-2-537, “Uncertainty Estimates for Non-Analytic Frequency Curves” (31 October 1997). Summary results of the analysis are shown in Table C-5. A plot of the curve with it 68% (1 standard deviation) and 95% (2 standard deviations) confidence limits is shown on Plate C-10.

C-14

Page 15: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

TABLE C-5 Clearwater Lake Pool Elevation-Frequency Data

Exceedance Probability

Pool EL [ft]

Std. Dev. [ft]

95% Lower Bound [ft]

68% Lower Bound [ft]

68% Upper Bound [ft]

95% Upper Bound [ft]

0.9999 497.0 3.2 490.6 493.8 500.2 503.40.9990 497.4 3.2 491.0 494.2 500.6 503.80.9900 497.9 3.2 491.5 494.7 501.1 504.30.9500 498.3 3.2 491.9 495.1 501.6 504.80.9200 498.5 3.2 492.1 495.3 501.7 504.90.9000 498.9 3.2 492.5 495.7 502.2 505.40.8700 499.5 3.2 493.1 496.3 502.7 505.90.8600 500.3 3.2 493.9 497.1 503.5 506.70.8000 505.2 3.2 498.8 502.0 508.4 511.60.7000 510.0 2.6 504.9 507.4 512.6 515.10.6000 513.2 2.4 508.5 510.8 515.6 517.90.5000 516.8 2.6 511.5 514.2 519.4 522.10.4000 521.0 2.9 515.1 518.1 523.9 526.90.3000 525.5 3.5 518.6 522.0 529.0 532.40.2000 532.1 4.5 523.2 527.6 536.6 541.00.1000 542.8 6.2 530.5 536.6 549.0 555.20.0500 552.2 7.4 537.4 544.8 559.6 567.00.0400 555.3 7.8 539.6 547.4 563.1 570.90.0200 564.0 9.0 546.1 555.0 573.0 582.00.0100 572.0 10.0 551.9 562.0 582.0 592.10.0040 581.6 11.3 559.0 570.3 592.9 604.20.0020 588.2 12.2 563.9 576.0 600.4 612.50.0010 594.4 13.0 568.4 581.4 607.4 620.4

4. Hydraulic Analysis 4.1 Black River Unsteady Flow Model The HEC-RAS version 3.0.1 (March 2001) software was used to build an unsteady flow hydraulic model of the approximately 55 mile reach of the Black River extending from RM 257.27 (0.13 miles below Clearwater Dam) to RM 201.79 downstream of Poplar Bluff, Missouri. The model was developed for modeling high magnitude flood flows where overbank conveyance is dominant. Model results downstream of RM 205.98 (STA 1087585 in Figure 1) are considered unreliable due to the complex nature of the flow patterns in the several mile wide right bank floodplain. All roadway embankments and levees in the study reach were assumed to survive overtopping; remaining intact at full height

C-15

Page 16: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

for all flood flows modeled. Hydraulic model layout in the vicinity of Poplar Bluff is of particular interest and is shown below in Figure 1. 507.

1154200.

1151492.1149108.

1143443. 1136259.

1129062.1126754.

1124535.1123027.1121123.

1109089

1107998.1107378.1104855.

1098504.1098104.

1095857.1092578.1089832.1087585.1081897.

1073034.

1070247.

1068072.

1065427.

SA-01

SA-03

SA-02

SA-04

SA01_SA03

SA01_SA02

SA02_SA03

SA02_SA04

FIGURE C-1 – Hydraulic Model Layout at Poplar Bluff The North Inter-River Levee located off the left bank of the Black River, in the vicinity of Poplar Bluff, was modeled as a lateral weir over which flow was allowed to pass into the floodplain between the North Inter-River Levee and the St. Francis River Levee. The inter-river floodplain upstream of the Missouri-Pacific (MO-PAC) railroad was modeled as Storage Area 1 (SA-01). The inter-river floodplain downstream of the MO-PAC railroad was modeled as Storage Area 2 (SA-02). Inter-River Levee overflow occurring upstream of the MO-PAC railroad was allowed to pass into SA-01, from which it could pass downstream over the MO-PAC railroad into SA-02 and/or out of the system over the St. Francis River Levee into “infinite” Storage Area 3 (SA-03). North Inter-River Levee overflow occurring downstream

C-16

Page 17: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

of the MO-PAC railroad was allowed to pass into SA-02, from which it could pass out of the system over the St. Francis River Levee into “infinite” SA-03 and/or out of the system into infinite Storage Area 4 (SA-04). Levees and the railroad embankment separating the storage areas were modeled as broad crested weirs over which flow could pass in either direction. The boundary between SA-02 and SA-04 was modeled as a broad crested weir with C=1.8, based on the natural ground profile along the downstream boundary. Model results for SA-01 and SA-02 represent estimates of the maximum ponded stage achieved and do not reflect the variation in water surface elevation which can be expected during the course of a flood event as flood waters pass through these areas. The right bank levee and floodwall extending downstream from model RM 207.3 (historic RM 210.2) in south Poplar Bluff were not included in the hydraulic model since reasonable estimates of flood impacts to south Poplar Bluff resulting from large flood events could be made without expending the significant effort required to accurately model this hydraulically complex area. CESWL Report Black River, Poplar Bluff, MO (Section 205) – Detailed Project Report and Environmental Assessment (November 1995) concluded the portion of the structure above the downstream Poplar Bluff city limits can be expected to provide protection from the Black River for up to the 100-YR flood event. Below the Poplar Bluff city limits overtopping and/or breaching of the levee may occur for the 100-YR or lesser magnitude flood events, resulting in backwater flooding of south Poplar Bluff. The report defined the 100-YR total discharge as 48,200 cfs at Business Highway 60. Of the total discharge 14,000 cfs is expected to pass down the Black River with the remaining 34,200 cfs expected to pass through the relief reach bounded on the west by the Butler County Drainage District No. 12 Levee in east Poplar Bluff, and on the east by the Inter-River Levee. Based on the results of the analyses presented in the November 1995 report, south Poplar Bluff is assumed to be impacted by flood events for which the peak discharge at Business Highway 60 exceeds 48,200 cfs. Model results below model RM 205.98 (historic RM 208.90) should not be considered reliable. The model was extended downstream from this location only to provide a downstream boundary for the model computations.

C-17

Page 18: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

4.1.1 Existing Conveyance System The Black River flows generally southeastward through the study reach. The main channel varies from about 100 FT to 500 FT in width through most of the study reach with an average slope of about 2.8 ft/mi. Main channel slope varies from as steep as about 3.8 ft/mi in the upper end of the study reach to as little as about 1 ft/mi in the lower end of the study reach in the vicinity of Poplar Bluff. The main channel is generally clear and clean with tree lined banks through most of the study reach. A Manning’s roughness coefficient of 0.03 was used in the hydraulic model for the main channel throughout the study reach. Overbank conveyance characteristics vary widely through the study reach. Upstream of the fall line at about RM 212 overbanks vary in width from as little as about 100 feet to as wide as about 5000 FT between the steeply rising sides of the valley. Downstream of the fall line the Black River passes into the relatively flat historic floodplain of the Mississippi River and overbank widths stretch to several miles when considering high magnitude flood flows. Overbank cover generally varies from open pasture and cultivated farmland to areas of forest with medium to thick undergrowth. Manning's roughness coefficients varying from 0.05 to 0.12 were used in the hydraulic model for the overbanks. 4.1.2 Model Geometry 4.1.2.1 Valley Cross-Sections Valley cross-section geometry was developed from U.S. Geological Survey (USGS) 30 meter grid digital elevation models (DEM’s). Accuracy of the thirty meter DEM’s are comparable to the corresponding 1:24000 scale, 20-foot contour interval, USGS topographic maps from which they are developed, but may exhibit less accuracy in flat areas. 4.1.2.2 Channel Cross-Sections Surveyed channel cross-sections at selected locations along the portion of the modeled reach extending from about RM 252 downstream to about RM 218 were collected in 1981. The survey data is contained in CESWL survey field books 81W2-1, 81W2-2, and 81W2-5. This data was used directly where applicable, and used as guidance for estimating channel geometry at other locations in the reach.

C-18

Page 19: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

4.1.2.3 Road Crossings Twelve road crossings were identified in the study reach. Design drawings for eight of the twelve crossings were obtained from the Missouri Department of Transportation (MDOT) and used as the basis for incorporating those crossings into the model. Drawings were not readily available for the Missouri-Pacific (MO-PAC) railroad crossing at RM 215.48 and it was not included in the model. A county road crossing located approximately one mile south of Williamsville at RM 232.62 was not included in the model because the absence of a significant roadway embankment across the mile wide floodplain indicated inclusion of the crossing would have little impact on results of the hydraulic model. Similar judgment was used to exclude the Bartlett Street crossing located at RM 208.1 just downstream of U.S. Business 60 in Poplar Bluff. Geometry for the MO-PAC railroad crossing at RM 207.96 in Poplar Bluff was estimated from visual observation, 1:24000 USGS quad maps, and levee design drawings. 4.1.2.4 Levees Top of levee elevations were drawn from levee design drawings. Elevations for the levee in east Poplar Bluff were drawn from “Butler County D.D. NO. 12, East Poplar Bluff, MO”, drawing number 13/35 (L-4), dated January 1960, revised June 1991. Elevations for the Inter-River Levee located about 2 miles east of Poplar Bluff were drawn from “North Inter-River Drainage District and the Ring Levee Drainage District”, drawing 13/36 (L-5A), dated January 1940, revised September 1989. Both drawings were found in CESWL’s “Natural Disaster Response Plan”, OM 500-1-1. Top of levee elevations for the St. Francis River right bank levee were drawn from a design drawing supplied by the Memphis District, dated 1961-1962. 4.1.2.5 Storage Areas Elevation-storage curves for SA-01 and SA-02 were developed from USGS 30 meter DEM data.

C-19

Page 20: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

4.2 Existing Condition Discharge Rating HEC-RAS version 3.0.1 (March 2001) was used to build a steady state backwater model of the spillway reach from which the existing condition pool elevation-discharge rating was developed. Model geometry for the concrete ogee weir structure, and for the portion of the cross-sections extending from the original spillway alignment centerline toward the left bank was based on Clearwater Dam original design drawing “Spillway Plan and Section”, January 1946. Geometry for the portion of the cross-sections extending from the original spillway alignment centerline toward the right bank were based on post-construction field survey data collected in 1989. Beyond the limits of these data sets cross-section geometry was estimated from USGS 1:24000 scale topographic maps. Model cross-sections were sub-divided into left overbank, main channel, and right overbank for assignment of Manning’s roughness coefficients due to the irregularity of the right bank and the presence of trees on both banks. The main channel was defined as extending from toe of slope to toe of slope. Some moderate scour/erosion of the main channel bed during the course of a flood event was assumed. N-values for the main channel ranged from 0.025 (in Clearwater Lake) to 0.05, with 0.04 used through most of the reach. An n-value of 0.04 is commensurate with that for a mountain stream with bed composed of gravels, cobbles, and a few boulders [Chow, 1959]. Overbank n-values ranged up to 0.07. Expansion coefficients ranged from 0.3 to 0.5, and contraction coefficients ranged from 0.1 to 0.3. N-values and/or expansion and contraction coefficients were increased in areas where significant turbulence could be expected and/or sudden changes in velocity were observed in the model. The model extended from downstream of the lower end of the spillway, just below Highway H-H, to a point in Clearwater Lake about 1000 feet beyond the upstream end of the spillway approach channel. Steady state profiles were computed for flows ranging from 1000 cfs to 450,000 cfs. The resulting existing condition pool elevation-discharge rating table is shown in Table C-6. The plotted curve is shown on Plate C-3.

C-20

Page 21: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

TABLE C-6 Existing Condition Spillway Pool-Elevation Discharge Rating

Spillway Discharge

[cfs] Pool EL [ft]

0 567.0 1000 568.1 2000 568.8 4000 569.9 6000 570.9

10000 572.3 15000 573.8 20000 575.1 30000 577.4 40000 579.4 60000 582.8 80000 585.9 100000 588.6 140000 593.5 180000 598.1 220000 602.3 260000 606.2 300000 609.9 350000 614.2 400000 618.4 450000 622.4

5. Results of Analyses Maximum increases in flood heights for failure verses non-failure, for each of the three dam breach analyses for which downstream hydraulic models were developed are shown in Table C-7. Graphs of the data are shown on Plates C-8 and C-9. The increases in with failure verses without failure flood heights for the 100% PMF are smaller than for the 20% PMF because uncontrolled spillway releases preceding the dam breach are larger for the 100% PMF and the increase in flow capacity per incremental increase in depth of flow for the river is greater for higher stages.

C-21

Page 22: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

TABLE C-7 Maximum Increase in Flood Heights [FT]: Dam Failure vs. Existing Condition W/O Failure

Distance From Dam

[mi]

Location Description

Dam Breach w/ Pool

At EL 505 FT

Dam Breach w/ Pool

At EL 574.7 FT (20% PMF)

Dam Breach w/ Pool

At EL 593.0 FT (100% PMF)

0.8 Vicinity of Dam 7.1 24.1 16.54.9 Piedmont/McKenzie Creek 10.3 27.7 15.57.0 Hwy 34 9.8 21.7 12.27.8 Leeper 9.8 19.5 10.89.5 Hwy 49 at Mill Springs 9.2 20.8 11.419.2 Hwy 49 at Browns

Crossing 10.5 12.2 7.222.5 Williamsville 8.7 18.6 7.930.0 Hwy 67 near Hendrickson 12.1 20.5 6.231.0 Hendrickson 11.0 17.3 5.939.6 Hwy W at Hilliard 9.7 13.6 4.344.4 Hwy 60 Bypass near

Poplar Bluff 7.7 9.8 2.245.7 Begin Inter-River Levee

at Poplar Bluff (EL +/-343 FT) 7.3 5.0 1.6

49.2 Bus. Hwy 60 at Poplar Bluff 9.0 4.9 1.1

49.4 MO-PAC RR at Poplar Bluff 8.1 3.4 0.7

51.0 South Poplar Bluff 7.3 1.0 0.8 Pond Area 1 - Northeast

of Poplar Bluff 0.0 5.4 0.6 Pond Area 2 - East of

Poplar Bluff 0.0 4.7 0.6

C-22

Page 23: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

5.1 High Pool Seepage Dam Failure Scenario The 20% PMF was determined to be the threshold event for high pool seepage dam failure based on resident time (about 95 hours) of pool elevation exceeding EL 575.0 FT. Peak discharge for the 20% PMF flood event without failure is about 51,800 cfs, versus a with failure peak discharge of about 523,000 cfs. Failure occurred at pool EL 574.7 FT with the pool in recession from peak pool EL 581.4 FT. Downstream maximum water surface elevations and flood wave travel times for the 20% PMF flood event are shown in Table C-8. Peak discharge for the 100% PMF event without failure is about 315,000 cfs, versus a with failure peak discharge of about 827,000 cfs. Failure occurred at pool EL 593.0 FT with the pool in recession from peak pool EL 611.2 FT. Downstream maximum water surface elevations and flood wave travel times for the 100% PMF event are shown in Table C-9. Dam breach outflow hydrographs for the 20% PMF and the 100% PMF events are shown on Plate C-4. Water surface profiles for the 20% PMF and the 100% PMF events are shown on Plate C-5.

C-23

Page 24: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

TABLE C-8 20% PMF Seepage Failure Dam Breach Simulation

Peak Flood Elevations and Times to Peak at Locations below Clearwater Dam Without Failure With Failure

Distance From Dam

[mi]

Location Elapsed

Time1

[hrs]

Peak WSEL

[ft,NGVD]

Peak Q

[cfs]

Elapsed Time2

[hrs]

Peak WSEL

[ft,NGVD]

Peak Q

[cfs] 0.8 Vicinity of Dam 44.5 468.0 52,724 3.6 492.1 494,205 4.9 Piedmont/McKenzie Creek 45.0 456.6 54,166 3.9 484.3 414,4367.0 Hwy 34 45.5 445.9 54,111 4.5 467.6 411,8437.8 Leeper 45.5 442.9 54,092 4.8 462.4 410,3039.5 Hwy 49 at Mill Springs 46.5 435.1 54,012 5.5 455.9 401,039 19.2 Hwy 49 at Browns Crossing 47.5 403.7 69,472 8.6 415.9 368,265 22.5 Williamsville 49.0 390.1 67,974 9.7 408.7 351,97730.0 Hwy 67 near Hendrickson 52.0 369.9 62,905 10.7 390.4 337,011 31.0 Hendrickson 52.0 367.3 62,571 11.6 384.6 335,95339.6 Hwy W at Hilliard 55.0 354.4 69,058 14.3 368.0 300,976 44.4 Hwy 60 Bypass near Poplar

Bluff 56.5 345.3 66,436 14.9 355.1 298,00245.7 Begin Inter-River Levee at

Poplar Bluff (EL +/-343 FT) 56.5 343.9 64,810 15.2 348.9 297,581 49.2 Bus. Hwy 60 at Poplar Bluff 56.5 342.2 56,436 15.4 347.1 89,102 49.4 MO-PAC RR at Poplar Bluff 57.5 337.4 56,422 15.9 340.8 78,789 51.0 South Poplar Bluff 58.5 332.5 56,389 17.4 333.5 78,277

Pond Area 1 - Northeast of Poplar Bluff

66.0 323.2 8,196* 20.0 328.6 218,213*

Pond Area 2 - East of Poplar Bluff

66.0 315.7 3,508* 22.0 320.4 174,839*

1 - From beginning of PMF spillway release to time of maximum water surface elevation. 2 - From beginning of dam breach to time of maximum water surface elevation. * Peak inflow to pond area. Inflow to Pond Area 1 is from Black River overtopping Inter-River Levee. Inflow to Pond Area 2 is from Pond Area 1 across MO-PAC RR.

C-24

Page 25: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

TABLE C-9 100% PMF Seepage Failure Dam Breach Simulation

Peak Flood Elevations and Times to Peak at Locations below Clearwater Dam Without Failure With Failure

Distance From Dam

[mi]

Location Elapsed

Time1

[hrs]

Peak WSEL

[ft,NGVD]

Peak Q

[cfs]

Elapsed Time2

[hrs]

Peak WSEL

[ft,NGVD]

Peak Q

[cfs] 0.8 Vicinity of Dam 49.5 487.1 315,684 2.9 503.6 788,792 4.9 Piedmont/McKenzie Creek 49.5 479.7 326,748 3.1 495.2 662,9777.0 Hwy 34 50.0 464.2 326,528 3.6 476.4 657,8087.8 Leeper 50.0 459.6 326,391 4.0 470.4 654,7939.5 Hwy 49 at Mill Springs 50.5 453.5 325,963 4.5 464.9 636,864 19.2 Hwy 49 at Browns Crossing 51.0 416.9 374,947 7.0 424.1 591,638 22.5 Williamsville 51.5 410.3 373,639 7.5 418.2 567,31630.0 Hwy 67 near Hendrickson 53.0 392.2 371,183 8.8 398.4 541,320 31.0 Hendrickson 53.5 387.1 370,981 9.2 393.0 539,70139.6 Hwy W at Hilliard 55.0 371.6 394,848 10.8 375.9 528,658 44.4 Hwy 60 Bypass near Poplar

Bluff 55.5 357.1 394,329 11.2 359.3 526,52145.7 Begin Inter-River Levee at

Poplar Bluff (EL +/-343 FT) 55.5 350.4 394,241 11.3 352.0 526,406 49.2 Bus. Hwy 60 at Poplar Bluff 55.5 348.5 88,128 11.1 349.6 119,998 49.4 MO-PAC RR at Poplar Bluff 56.0 341.0 79,841 11.6 341.7 101,919 51.0 South Poplar Bluff 56.5 333.5 79,835 12.4 334.3 100,345

Pond Area 1 - Northeast of Poplar Bluff

54.0 329.7 314,424* 14.0 330.3 424,455*

Pond Area 2 - East of Poplar Bluff

57.0 321.7 311,532* 15.0 322.3 411,672*

1 - From beginning of PMF spillway release to time of maximum water surface elevation. 2 - From beginning of dam breach to time of maximum water surface elevation. * Peak inflow to pond area. Inflow to Pond Area 1 is from Black River overtopping Inter-River Levee. Inflow to Pond Area 2 is from Pond Area 1 across MO-PAC RR.

C-25

Page 26: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

5.2 Low Pool Seepage Dam Failure Scenario Relatively long duration low pool elevations equaling or exceeding about EL 505.0 FT may result in a seepage related dam breach. Pool elevations below about EL 567.0 FT, the emergency spillway crest elevation, can be expected to result in a Clearwater Lake maximum release of about 4000 cfs as the lake is drawn down to normal pool elevation with a corresponding flow rate of about 4500 cfs at Poplar Bluff. The actual rate of release is determined by downstream conditions and controlled to minimize downstream flooding. A flow rate of 4500 cfs was used throughout the downstream reach for the without failure water surface profile. Peak discharge for the pool at elevation 505.0 FT with failure is about 51,000 cfs. Downstream maximum water surface elevations and flood wave travel times are shown in Table C-10. The dam breach outflow hydrograph is shown on Plate C-6. Water surface profiles are shown on Plate C-7.

C-26

Page 27: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

TABLE C-10 Pool at EL 505.0 FT Seepage Failure Dam Breach Simulation

Peak Flood Elevations and Times to Peak at Locations below Clearwater Dam Without Failure With Failure

Distance From Dam

[mi]

Location

WSEL [ft,NGVD]

Q

[cfs]

Elapsed Time1

[hrs]

Peak WSEL

[ft,NGVD]

Peak Q

[cfs] 0.8 Vicinity of Dam - 459.9 4,500 2.8 467.0 45,1344.9 Piedmont/McKenzie Creek - 443.6 4,500 5.1 453.9 38,2937.0 Hwy 34 - 434.0 4,500 6.1 443.8 37,4497.8 Leeper - 431.1 4,500 6.4 440.9 36,9669.5 Hwy 49 at Mill Springs - 423.4 4,500 7.6 432.6 36,09619.2 Hwy 49 at Browns Crossing - 388.2 4,500 13.1 398.7 29,95322.5 Williamsville - 377.1 4,500 15.5 385.8 29,00330.0 Hwy 67 near Hendrickson - 351.4 4,500 19.9 363.5 26,39631.0 Hendrickson - 348.7 4,500 20.2 359.7 26,29239.6 Hwy W at Hilliard - 337.3 4,500 26.3 347.0 22,15744.4 Hwy 60 Bypass near Poplar

Bluff -

331.5 4,500 29.4 339.2 21,12945.7 Begin Inter-River Levee at

Poplar Bluff (EL +/-343 FT) -

330.6 4,500 30.2 337.9 20,97349.2 Bus. Hwy 60 at Poplar Bluff - 324.8 4,500 31.9 333.8 20,32549.4 MO-PAC RR at Poplar Bluff - 323.8 4,500 32.3 331.9 20,26451.0 South Poplar Bluff - 321.4 4,500 34.4 328.6 19,765

Pond Area 1 - Northeast of Poplar Bluff

- N/A

N/A

N/A

N/A

N/A

Pond Area 2 - East of Poplar Bluff

- N/A

N/A

N/A

N/A

N/A

1 - From beginning of dam breach to time of maximum water surface elevation. Not applicable for without failure controlled release. N/A – Black River did not overtop the Inter-River Levee.

C-27

Page 28: CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR … · US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC

6. References 1. Guidelines for Evaluating Modifications of Existing Dams Related to Hydrologic Deficiencies; October 1986; IWR Report 86-R-7. 2. Clearwater Lake, Black River, MO - Dam Safety Hydrologic and Hydraulic Studies for Spillway Adequacy and Downstream Land Acquisition; August 1979; CESWL-EC-HH. 3. Clearwater Dam, Black River, MO – Project Modification for the Dam Safety Assurance Program Reconnaissance Report; Revised May 1986; CESWL. 4. Dam Safety Assurance Program; 12 September 1997; ER 1110-2-1155; USACE. 5. Inflow Design Floods for Dams and Reservoirs; 1 March 1991; ER 1110-8-2(FR); USACE. 6. HEC-RAS River Analysis System Hydraulic Reference Manual; Version 3.0, January 2001; CPD-69; USACE Hydrologic Engineering Center. 7. Duration and Frequency of Hydrologic Events in the Little Rock District; January 1999 (Rev April 2000); CESWL-EC-HH. 8. HEC-1 Flood Hydrograph Package User’s Manual; June 1998; CPD-1A (Version 4.1); USACE Hydrologic Engineering Center. 9. Black River, Poplar Bluff, MO – Section 205 – Detailed Project Report and Environmental Assessment; November 1995; CESWL.

C-28