CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD
INSTALLATIONS.
PRESENTATION BY RE DIRECTORATE
![Page 2: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.](https://reader036.fdocuments.us/reader036/viewer/2022082816/56649f535503460f94c78582/html5/thumbnails/2.jpg)
POLICY GUIDELINES ISSUED FOR DOUBLE
STACK CONTAINERS
SALIENT PARAMETERS INVOLVED
1. MINIMUM HEIGHT OF HEAVY /LIGHT OVERLINE STRUCTURE
2. MINIMUM HEIGHT OF CONTACT WIRE
3. POWER LINE CROSSINGS
![Page 3: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.](https://reader036.fdocuments.us/reader036/viewer/2022082816/56649f535503460f94c78582/html5/thumbnails/3.jpg)
RAIL LEVEL = 0 mm
Max. Mov. Dim. = 6809 mm
Height of CONT = 7079 mm
Min. Fixed Dim. = 7760/8140 mm 250/630mm
270 mm
DOUBLE STACK CONTAINER MOVEMENT ON FREIGHT CORRIDOR
UNDER WIRE(Vertical Profile Scheduling)
{ Height of CAT = 7507 mm
![Page 4: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.](https://reader036.fdocuments.us/reader036/viewer/2022082816/56649f535503460f94c78582/html5/thumbnails/4.jpg)
COMPARATIVE STRUCTURES
![Page 5: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.](https://reader036.fdocuments.us/reader036/viewer/2022082816/56649f535503460f94c78582/html5/thumbnails/5.jpg)
MINIMUM HEIGHT OF OVERLINE STRUCTURE
• LETTER NO. 2006/RE/161/3 DATED 19/5/06
• HEAVY OVERHEAD STRUCTURE ie ROB – 7760mm
BASIS:
HEIGHT OF CONTACT WIRE - 6809+250+20 = 7079 mm
HEIGHT OF CATENARY - 7079+11+417 = 7507 mm
MIN.HEIGHT OF HEAVY OVERLINE STRUCTURE –
7507+250=7757 SAY 7760 mm
![Page 6: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.](https://reader036.fdocuments.us/reader036/viewer/2022082816/56649f535503460f94c78582/html5/thumbnails/6.jpg)
MINIMUM VERTICAL CLEARANCE OF LIGHT OVERHEAD STRUCTURE
• REF. LETTER NO. 2006/RE/161/3 DATED 19/5/06( REF. ITEM NO. 10(iii)(a) OF REV SOD 2004)
• MIN HEIGHT OF LIGHT OVERLINE STRUCTURE
eg FOB = 8140
• BASIS:
– HEIGHT OF LIGHT STRUCTURE = 7760+380 = 8140mm
![Page 7: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.](https://reader036.fdocuments.us/reader036/viewer/2022082816/56649f535503460f94c78582/html5/thumbnails/7.jpg)
MINIMUM HEIGHT OF CONTACT WIRE
• BASIS:– MINIMUM HEIGHT OF DOUBLE STACK CONTAINOR
LOADED
ON FLAT WAGON - 6809 mm
LONG TIME CLEARANCE - 250 mm
ALLOWANCE FOR TRACK RAISING - 20 mm
7079 mm
![Page 8: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.](https://reader036.fdocuments.us/reader036/viewer/2022082816/56649f535503460f94c78582/html5/thumbnails/8.jpg)
POWER LINE CROSSINGS• LETTER NO. 2006/RE/161/1 PT. III DATED 19.05.06 – STIPULATES VERTICAL
CLEARANCES FOR POWER LINE CROSSINGS OF RAILWAY TRACKS
Voltage Existing Clearance New Clearance
At Mid span
At Fixed Structures
33 KV 14.1 m 13.1 m 16.4 m
66 KV 14.1m 13.1 m 16.7 m
132 KV 14.6m 13.7m 17.3 m
220 KV 15.4m 153 m 18.2 m
400 KV 17.9m 16.2m 20.0 m
500 KV 19.3m 18.66m 20.9 m
800 KV 23.4m 18.66m 23.61 m
![Page 9: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.](https://reader036.fdocuments.us/reader036/viewer/2022082816/56649f535503460f94c78582/html5/thumbnails/9.jpg)
![Page 10: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.](https://reader036.fdocuments.us/reader036/viewer/2022082816/56649f535503460f94c78582/html5/thumbnails/10.jpg)
![Page 11: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.](https://reader036.fdocuments.us/reader036/viewer/2022082816/56649f535503460f94c78582/html5/thumbnails/11.jpg)
THANK YOU
![Page 12: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.](https://reader036.fdocuments.us/reader036/viewer/2022082816/56649f535503460f94c78582/html5/thumbnails/12.jpg)
DOES IT EXIST ANYWHERE ELSE ?
• CHINA – Shanghai – Kunminng Corridor
– Hangzhou – Zhuzhou section– (Liujhan-Jhegan sub-section) ( 2nd National
Project)