CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

12
CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE

Transcript of CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

Page 1: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD

INSTALLATIONS.

PRESENTATION BY RE DIRECTORATE

Page 2: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

POLICY GUIDELINES ISSUED FOR DOUBLE

STACK CONTAINERS

SALIENT PARAMETERS INVOLVED

1. MINIMUM HEIGHT OF HEAVY /LIGHT OVERLINE STRUCTURE

2. MINIMUM HEIGHT OF CONTACT WIRE

3. POWER LINE CROSSINGS

Page 3: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

RAIL LEVEL = 0 mm

Max. Mov. Dim. = 6809 mm

Height of CONT = 7079 mm

Min. Fixed Dim. = 7760/8140 mm 250/630mm

270 mm

DOUBLE STACK CONTAINER MOVEMENT ON FREIGHT CORRIDOR

UNDER WIRE(Vertical Profile Scheduling)

{ Height of CAT = 7507 mm

Page 4: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

COMPARATIVE STRUCTURES

Page 5: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

MINIMUM HEIGHT OF OVERLINE STRUCTURE

• LETTER NO. 2006/RE/161/3 DATED 19/5/06

• HEAVY OVERHEAD STRUCTURE ie ROB – 7760mm

BASIS:

HEIGHT OF CONTACT WIRE - 6809+250+20 = 7079 mm

HEIGHT OF CATENARY - 7079+11+417 = 7507 mm

MIN.HEIGHT OF HEAVY OVERLINE STRUCTURE –

7507+250=7757 SAY 7760 mm

Page 6: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

MINIMUM VERTICAL CLEARANCE OF LIGHT OVERHEAD STRUCTURE

• REF. LETTER NO. 2006/RE/161/3 DATED 19/5/06( REF. ITEM NO. 10(iii)(a) OF REV SOD 2004)

• MIN HEIGHT OF LIGHT OVERLINE STRUCTURE

eg FOB = 8140

• BASIS:

– HEIGHT OF LIGHT STRUCTURE = 7760+380 = 8140mm

Page 7: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

MINIMUM HEIGHT OF CONTACT WIRE

• BASIS:– MINIMUM HEIGHT OF DOUBLE STACK CONTAINOR

LOADED

ON FLAT WAGON - 6809 mm

LONG TIME CLEARANCE - 250 mm

ALLOWANCE FOR TRACK RAISING - 20 mm

7079 mm

Page 8: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

POWER LINE CROSSINGS• LETTER NO. 2006/RE/161/1 PT. III DATED 19.05.06 – STIPULATES VERTICAL

CLEARANCES FOR POWER LINE CROSSINGS OF RAILWAY TRACKS

Voltage Existing Clearance New Clearance

At Mid span

At Fixed Structures

33 KV 14.1 m 13.1 m 16.4 m

66 KV 14.1m 13.1 m 16.7 m

132 KV 14.6m 13.7m 17.3 m

220 KV 15.4m 153 m 18.2 m

400 KV 17.9m 16.2m 20.0 m

500 KV 19.3m 18.66m 20.9 m

800 KV 23.4m 18.66m 23.61 m

Page 9: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.
Page 10: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.
Page 11: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

THANK YOU

Page 12: CLEARANCE STUDY FOR DFC FOR TRACTION OVERHEAD INSTALLATIONS. PRESENTATION BY RE DIRECTORATE.

DOES IT EXIST ANYWHERE ELSE ?

• CHINA – Shanghai – Kunminng Corridor

– Hangzhou – Zhuzhou section– (Liujhan-Jhegan sub-section) ( 2nd National

Project)