CLEANROOM SUITE & FIREWALL PARTITIONS FOR AERONAUTICAL RESEARCH & DEVELOPMENT Precision Manufacturer Bristol Background Using our unique experience of cleanroom design and construction and fire-rated enclosures, Stancold were awarded the project after winning a competitive tender through Principle Contractor, Merit Holdings. Process The suite of new cleanrooms was built to grade D classification and the fire-rated enclosures were designed to be clean not classified. Solution We installed 6m high freestanding walls with integrated flush cleanroom windows connected to an aluminium T-Bar suspended ceiling grid which formed the plenum and low- level return air cooling coils. The return air ducts were formed using 50mm FM approved Puracore cleanroom walls to a height of 6m and we also provided temperature controlled cleanrooms with Eurobond panels to a height of 8m. Project Details Location Bristol Building Use Engine Manufacturer Installation Time 21 Weeks Panel Core Aluminium Honeycomb & Mineral Fibre Panel Thickness 50mm, 75mm, 150mm Panel Requirements 3350m² Services Free Consultation Site Surveys Project Management Installation Maintenance Advice This project showcases our cleanroom expertise Paul Towse, Project Manager Stancold PLC, Portview Road, Avonmouth, Bristol BS11 9LQ T 0117 316 7000 | E [email protected] | www.stancold.co.uk

Transcript of Cleanroom Suite & Firewall Partitions for Aeronautical ...

Page 1: Cleanroom Suite & Firewall Partitions for Aeronautical ...

CLEANROOM SUITE & FIREWALL PARTITIONS FOR AERONAUTICAL RESEARCH & DEVELOPMENTPrecision Manufacturer   Bristol

Background

Using our unique experience of cleanroom design and construction and fire-rated enclosures, Stancold were awarded the project after winning a competitive tender through Principle Contractor, Merit Holdings.

Process

The suite of new cleanrooms was built to grade D classification and the fire-rated enclosures were designed to be clean not classified.

Solution

We installed 6m high freestanding walls with integrated flush cleanroom windows connected to an aluminium T-Bar suspended ceiling grid which formed the plenum and low-level return air cooling coils. The return air ducts were formed using 50mm FM approved Puracore cleanroom walls to a height of 6m and we also provided temperature controlled cleanrooms with Eurobond panels to a height of 8m.

Project DetailsLocation Bristol

Building Use Engine Manufacturer

Installation Time 21 Weeks

Panel Core Aluminium Honeycomb & Mineral Fibre

Panel Thickness 50mm, 75mm, 150mm

Panel Requirements3350m²

Services Free Consultation

Site Surveys

Project Management

Installation

Maintenance Advice

This project showcases our cleanroom expertise

Paul Towse, Project Manager“ ”Stancold PLC, Portview Road, Avonmouth, Bristol BS11 9LQ