Cleaning out the stable for the girls
description
Transcript of Cleaning out the stable for the girls
Cleaning out the stable for the girls
Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them
Inside the bathroom
Screen needs replacing, two tiny holes
New windows in the upper north bedroom
This one is finished, just outer edges of trim to paint
Bathroom window installed
Tackling the dormer – three new windows go here
One new window fits in the opening for the original two
Then we create openings for new windows on each side. This way the roof is supported
Ready to rip and tear
I’ll have a nap after lunch
Door at the top of the stairs
Vent pipe in the way so Pete helps Ryan remove it and patch the roof. It had been cut off in the basement but never removed when the new one was installed
Three new windows in the dormer, repairs underway
Checking the chimney flashing
Inside the dormer, new windows installed
Carter likes to steal gloves and run around the house with them
Window jambs for the replacement windows
Kitchen gets new windows in a box, this is the base
You can see the angle braces
Insulating the floor
Small patch on the basement concrete floor
Prest Electric has ‘ HUGGIES’
Kitchen window box taking shape
A better view
A view of the new kitchen window through the old window opening.
The new windows installed
Ready for trim
Gloves on the ladder top protect the wood
Caulking finished, ready for primer and paint