Page 1: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

1 | April 25, 2019

CLEAN JACKSONVILLE

Page 2: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

2 | April 25, 2019

CLEAN JACKSONVILLE

Page 3: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

3 | April 25, 2019

CLEAN JACKSOVILLE - General Construction

Page 4: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

4 | April 25, 2019

GTT Mark III Membrane Containment System

• Stainless Steel Corrugated Plating • Inter-Barrier and Insulation Spaces • Composite Secondary Containment

Membrane• Positive Pressure of Inter-Barrier

Insulation for Vapor leak containment

Page 5: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

5 | April 25, 2019

GTT Mark III Membrane Containment System

Page 6: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

6 | April 25, 2019

Tank Protection Relief Valves

Gas Detector

• Two Fully Redundant PRVs set for 700mbar

• Independent Safety Line to Vent Mast set by operator

Page 7: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

7 | April 25, 2019

Combined Dome - Cargo Handling

• Combined Vapor and Liquid Dome

• Loading and Bunkering piping are common at the Cargo Dome

• Spray and Stripping lines able to facilitate stripping, spray rail utilization, gassing up and cool down operations.

Page 8: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

8 | April 25, 2019

Cargo Pumps

• Two (2) Primary Cargo Pumps• Ebara Model 8EC-12,• Rated Capacity of 500 m3/hr, 262 HP,

3840 RPM • Single Stage, VFD Controlled: 40 Hz –

64 Hz• Minimum Starting Level: 1.25 M

• One (1) Stripping/Spray Pump• Ebara Model 1EC-063• Rated Capacity of 8 m3/hr, 5.5HP, 3600

RPM• 3 Stage, Fixed Frequency Control • Minimum Starting Level: 0.39 M

Page 9: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

9 | April 25, 2019

Custody Transfer Management System

• Coriolis Mass Flow Meter Technology • Calculates Resonance signal produced of LNG

moving through internal measurement piping

• Gas Chromatograph measures composition of LNG Product

• Continuous sampling-Analyzed by Helium carrier gas

Page 10: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

10 | April 25, 2019

Reliquafaction System

• Six (6) Stirling Cryocoolers• Condenses Boil off Gas and Vapor

from Marlin Ship• Exceeds 125% BOG Management IGC

Code requirements

• Electronically Driven• Independent VFDs • Wet Bulkhead Seal pressed with

Nitrogen

Page 11: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

11 | April 25, 2019

Cascade Cooling System

407c Freon

Sea Water

Heat Rejection Flow

Page 12: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

12 | April 25, 2019

Vaporizer and Glycol Water Heater

• DongHwa Vaporizer and Glycol Heater System• Primarily used if Ship cannot provide Vapor

Return• Secondary Use: Gassing Up• Capable 90 C glycol water

Page 13: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

13 | April 25, 2019

The Clean Jacksonville Bunker Mast:

.

Page 14: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

14 | April 25, 2019

Bunker Mast Connection

• Liquid: 8”Hose reduced to 6” QC/DC

• Vapor: 4” Hose & QC/DC

• Quick Connecting• No Intereting

Required

Page 15: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

15 | April 25, 2019

Bunker Mast Connection

.

Page 16: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

16 | April 25, 2019

Deck Machinery

.

• Deck Machinery on the Barge • 4 Lantec 200 Series Mooring Winches• 1 Lantec 750 Series Mooring Winch• 1 Tech Crane Loading Crane• 1 Coastal Anchor Winch• 1 Pull Master M25 Bridle Winch

Page 17: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

17 | April 25, 2019

Pressure Reducing Station

• Pressure Reducing Station• One pneumatic inline direct acting and

one PID controlled valve with DVC• Steps Client C-Tank vapor return

from a maximum 10 bar down to Operator desired setpoint.

• Bypass valve allows for vapor return from a Client Membrane Tank

Page 18: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

18 | April 25, 2019

Electrical System

Power Management System• Complete Automatic Control with

preferential trip settings. • Capable of receiving power from

Tug for Limited Operations

Generators• Cummins QSK19-DM 515 kW

• Two in Lower Machinery Space• One in Standby Generator Room

Page 19: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

19 | April 25, 2019

Nitrogen System

• Two Nitrogen Generators• Generon Membrane Type• Rated Capacity

• 38Nm3/hr each• 10barg, 97% N2 purity

• Two Feed Air Compressors• TMC Rotary Screw • Supplies:

• Air to N2 Generators, Gas Sampling, Fuel Shut Off Valves, Sea Chest Blow Down

• Desiccant Air Dryer located between compressors and Nitrogen Generator

Page 20: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

20 | April 25, 2019

Siemens CAMS Automation

• Controlled Stations: • Barge Equipment

Monitored from CCR or Tug• Cargo Management• Power Management • Load Shedding• Emergency Response

Page 21: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

21 | April 25, 2019

Telemetry Overview

Page 22: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

22 | April 25, 2019

Fire and Safety Equipment

Fixed Gas DetectionFlame/Heat/Smoke DetectionFixed CO2 Protected Spaces

ESD System / TPSFire Pumps

Water Curtain / Water SprayNitrogen Smothering

Fixed Powder (350lbs) w/100ft HoseEmergency Anchor

Page 23: CLEAN JACKSONVILLEaapa.files.cms-plus.com/2019Seminars/FacilitiesEng/Alex Fairchild.pdf• Inter-Barrier and Insulation Spaces • Composite Secondary Containment ... April 25, 2019

23 | April 25, 2019

Thank You

Alexander FairchildLNG Barge Operations