Clean Energy for Sustainability SOLAR PROJECT ......Solar Park Feasibility Report REPORT PREPARED BY...

11
New and Renewable Energy Development Corporation of AP. Ltd. Address: No. 12-464/5/1, River Oaks Apartment, CSR Kalyana Mandapam Road, Tadepalli, Guntur District - 522 501, Andhra Pradesh. Website: www.nredcap.in Contact: Mr. K Srinivas, GM - +91 90005 50963 Mr. C B Jagadeeswara Reddy, DGM - +91 94402 66636 SOLAR PROJECT FEASIBILITY REPORT Site Name Obuladevacheruvu Mandal Obuladevacheruvu District Anantapuramu Capacity 2400 MW Clean Energy for Sustainability 2

Transcript of Clean Energy for Sustainability SOLAR PROJECT ......Solar Park Feasibility Report REPORT PREPARED BY...

  • New and Renewable Energy Development Corporation of AP. Ltd. Address: No. 12-464/5/1, River Oaks Apartment, CSR Kalyana Mandapam Road,

    Tadepalli, Guntur District - 522 501, Andhra Pradesh. Website: www.nredcap.in

    Contact: Mr. K Srinivas, GM - +91 90005 50963

    Mr. C B Jagadeeswara Reddy, DGM - +91 94402 66636

    SOLAR PROJECT FEASIBILITY REPORT Site Name Obuladevacheruvu

    Mandal Obuladevacheruvu

    District Anantapuramu

    Capacity 2400 MW

    Clean Energy for Sustainability

    2

  • Solar Park Feasibility Report

    REPORT PREPARED BY 2

    2

    Introduction:

    The feasibility studies for installation of ultra-mega solar park in Obuladevucheruvu

    mandal of Anantapuramu District, Andhra Pradesh has been carried out. This report

    explains the preliminary observation in selection of site for installation of large scale solar

    parks based on topology.

    Location:

    The proposed solar park details are tabulated below.

    Sl No Particulars Description

    1 Project Location Obuladevucheruvu

    2 Mandal / District Obuladevucheruvu, Nallmada and Amadagur/ Anantapuramu

    3 State Andhra Pradesh

    4 Geographical coordinates 14.025294° 77.999154°

    5 Meteorological data source Meteonorm 7.3

    6 Land availability 12000 Acres

    9 Land quality Mostly barren land with some parts of agricultural land.

    10 Location access

    • State Highway 61 connecting Kadiri – Hindupur is passing through the site.

    • National Highway 7 connecting Hyderabad – Bangalore – 65 Kms

    11 Nearest domestic airport Puttaparti – 45Km.

    12 Nearest International airport Bengaluru, Karnataka– 120 Kms

    13 Nearest railway station Kadiri Railway Station at 20 Kms

    14 Nearest port Chennai – 350 Kms

    15 Available APTransco Substations

    Existing NP Kunta 4000/220 KV Powergrid Substation – 40Kms

    Existing Hindupur 400/220 KV APTransco Substation – 52 Kms

    Table 1: Summary of project details.

  • Solar Park Feasibility Report

    REPORT PREPARED BY 3

    3

    Obuladevucheruvu (ODC) site is located in Obuladevucheruvu, Nallamada and

    Amadaguru mandals of Anantapuramu District with Karnataka state as its boundary

    towards south.

    Figure 1: District administration map of Anantapuramu.

    Proposed

    Site Area

  • Solar Park Feasibility Report

    REPORT PREPARED BY 4

    4

    State Highway 61 connecting Hindupuram - Kadiri and SH 369 connecting Bukkapatnam

    and Kadiri are passing through the site adjoining the solar block.

    Route map of the site is given in figure below:

    Figure 2: Route map of ODC site

    The proposed site is spread across stretch of 14 villages with 06 villages in

    Obuladevucheruvu mandal, 04 villages in Nallamada mandal and balance 04 village in

    Amadaguru mandal of Anantapuramu District of Andhra Pradesh.

  • Solar Park Feasibility Report

    REPORT PREPARED BY 5

    5

    Satellite image showing the above village boundaries is given in figure below:

    Figure 3: Satellite image of Obuladevacheruvu site

    The total land availability in the above mentioned villages is around 64,343 Acres which

    includes open land, hills, habitations, streams, and roads. Table below shows the

    complete extent of land available at each village including habitation, forest land, open

    lands, hills, rivers, and streams.

  • Solar Park Feasibility Report

    REPORT PREPARED BY 6

    6

    Sl No

    Village Mandal Assigned Government Private Grand Total

    1 Reddipalli Nallamada 1456 2399 7928 11783

    2 Gopepalli Nallamada 546 467 1763 2776

    3 Donnikota Nallamada 1413 3219 3487 8119

    4 Kurumala Nallamada 487 433 4011 4931

    5 Narasambottlapalli Obuladevacheruvu 6 65 97 168

    6 Daburuvaripalli Obuladevacheruvu 76 587 5550 6213

    7 Tippepalli Obuladevacheruvu 103 280 2847 3230

    8 Sunnampalli Obuladevacheruvu 60 820 4518 5398

    9 Obuladevacheruvu Obuladevacheruvu 70 1162 3001 4233

    10 Venkatapuram Obuladevacheruvu 104 555 1759 2418

    11 S Kuruvapalli Aamadaguru 11 108 119

    12 Jawkalakothapalli Aamadaguru 549 664 2756 3969

    13 Thummala Aamadaguru 1012 1208 7251 9472

    14 Pulakuntapalli Aamadaguru 150 256 1108 1514

    Grand Total 6031 12128 46184 64343

    Table 2: Summary of extent of land at villages.

    Topographical analysis has been done considering the 5 meter contour interval and

    drainage network of the above mentioned villages and found that out of 64,343 acres

    available, about 12,000 Acres of land will be useful for solar park after leaving forest land,

    village habitations, streams and wind turbines.

    However, the exact village wise land extent and land classifications for the project can be

    known by detailed survey and digital mapping.

  • Solar Park Feasibility Report

    REPORT PREPARED BY 7

    7

    Water Source:

    There are no major reservoirs available near the proposed site. There are water tanks

    (Cheruvu) in and around site. Water can be sourced from these tanks. However, detailed

    hydrological studies to be carried out to estimate water availability.

    Topology:

    From the contour drawing it is understood that land available in the above said villages

    are mostly plain with streams towards east side.

    Contour map of the proposed site is given below:

    Figure 4: Contour map of Obuladevacheruvu site

    Boundary coordinates of the ODC site are given in annexure.

  • Solar Park Feasibility Report

    REPORT PREPARED BY 8

    8

    Figure below shows the useful area of the proposed solar park leaving the village

    habitations, wind turbines and streams.

    Figure 5: Useful area for solar project

  • Solar Park Feasibility Report

    REPORT PREPARED BY 9

    9

    Energy Estimates:

    For the proposed Ultra Mega solar park area, annual energy production has been

    estimated using PVsyst 7.0.5 simulation software for multi-crystalline PV modules of REC

    Solar 350Wp and irradiation data from Meteonorm 7.3. The table below shows the

    simulation results of Annual energy production.

    Month GlobHor kWh/m2

    DiffHor kWh/m2

    T_Amb oC

    EArray MWh

    E_Grid MWh

    PR Ratio

    CUF %

    January 171 46 24 199 190 19617 23.60%

    February 169 51 27 188 179 18200 26.12%

    March 189 71 30 196 187 18801 23.08%

    April 190 79 31 187 178 17865 23.92%

    May 188 87 31 178 168 17027 22.06%

    June 153 82 28 143 135 13893 18.59%

    July 147 79 27 139 131 13541 17.52%

    August 146 89 26 142 134 13898 17.99%

    September 146 77 26 149 140 14496 19.40%

    October 149 80 26 158 150 15504 18.74%

    November 143 57 24 160 153 15880 21.25%

    December 156 44 23 183 175 18118 23.47%

    1946 841 27 2021 1918 196840 21.31%

    Table 3: Annual Energy Generation Estimates of Obuladevacheruvu site

    The annual CUF for typical 100 MW block of solar park at P90 is estimated at 20.94% per

    year with the annual generation of 1,82,948 MWh which is matching with the generation

    results of existing solar parks in the state of Andhra Pradesh.

    Conclusion:

    From the initial study, it is found that the proposed site at Obuladevacheruvu is best fit for

    setting up the Ultra Mega Solar Park.

  • Solar Park Feasibility Report

    REPORT PREPARED BY 10

    10

    Annexure

    Boundary Coordinates of the proposed solar park in Obuladevacheruvu site.

    Block Easting Northing Zone Block Easting Northing Zone

    I 178069 1558421 44P I 180541 1559161 44P

    I 177661 1558722 44P I 180538 1558928 44P

    I 176846 1559319 44P I 180386 1558721 44P

    I 176318 1559363 44P I 180174 1558207 44P

    I 176586 1559744 44P I 180031 1558085 44P

    I 176662 1560173 44P I 179727 1558239 44P

    I 176541 1560488 44P I 179656 1558250 44P

    I 176389 1561160 44P I 179106 1558261 44P

    I 176200 1561967 44P II 170150 1552908 44P

    I 176199 1562282 44P II 170769 1553630 44P

    I 176205 1562484 44P II 170896 1554581 44P

    I 176375 1563691 44P II 170951 1555191 44P

    I 177188 1564382 44P II 171332 1555437 44P

    I 177493 1565057 44P II 171578 1554882 44P

    I 178193 1564631 44P II 172141 1554993 44P

    I 178852 1564526 44P II 172839 1555255 44P

    I 178899 1564821 44P II 172625 1556159 44P

    I 178569 1565656 44P II 172760 1556516 44P

    I 177218 1566195 44P II 173498 1556936 44P

    I 177114 1566757 44P II 175093 1556627 44P

    I 176696 1567408 44P II 176529 1556175 44P

    I 176270 1568717 44P II 176304 1555216 44P

    I 177251 1569111 44P II 175425 1555384 44P

    I 178185 1567446 44P II 175052 1555359 44P

    I 178716 1567253 44P II 174459 1555197 44P

    I 179513 1566731 44P II 174379 1554955 44P

    I 180412 1566897 44P II 174299 1554277 44P

    I 180123 1565933 44P II 174164 1553824 44P

    I 179874 1563602 44P II 174180 1553276 44P

    I 179343 1563409 44P II 173822 1552800 44P

    I 177236 1562839 44P II 173146 1552307 44P

    I 177162 1562665 44P II 172058 1552498 44P

    I 177266 1562084 44P II 171718 1552023 44P

  • Solar Park Feasibility Report

    REPORT PREPARED BY 11

    11

    I 177027 1562064 44P II 172087 1551611 44P

    I 177059 1561656 44P II 172532 1551134 44P

    I 177115 1561167 44P II 173486 1551190 44P

    I 177171 1560860 44P II 174070 1551085 44P

    I 177272 1560221 44P II 173386 1550580 44P

    I 177994 1560488 44P II 172585 1549451 44P

    I 178563 1559859 44P II 170510 1549292 44P

    I 178279 1559053 44P II 171472 1551404 44P

    I 178608 1559007 44P II 171085 1552013 44P

    I 178793 1559234 44P II 171056 1552149 44P

    I 179181 1559214 44P II 170650 1552818 44P

    I 179965 1559201 44P II 170150 1552908 44P