CLDS 2012-13
-
Upload
tracienewman771 -
Category
Documents
-
view
222 -
download
0
Transcript of CLDS 2012-13
Camp Lejeune Dependents Schools– DRAFT Faculty Calendar - SY 2012-2013
E EVENT DRAFT March 29, 2012
AUGUST1, W All Administrators On Site20-22, M-W All Staff Return (Administrative day, staff workdays, 1
stday for staff)
23, Th First Day - 1-12; Kindergarten Orientation Day24, Fr First Full Day for Kindergarten
SEPTEMBER ______ 3, M Labor Day – Federal Holiday6, Th PreSchool Orientation7, Fr First Day for PreSchool24, M Interim / Mid-Term Reports
OCTOBER ______ 8, M Columbus Day – Federal Holiday 19, Fr Staff CSI/PD Day, Non-Student Day, possible weather make-up day26, F First Quarter Ends (44 days)29, M Staff Workday, Non-Student Day
NOVEMBER ______ 1 / 2, Th-Fr PreSchool Parent Conferences Non-Student Days for PreSchool2, Fr Non-Student Day, 1
stQuarter Report Card; Parent Conferences PK-12
7 /14, W Banked Time allotted if needed for Parent Conferences, PK-512, M Veterans’ Day Holiday 21-23, W-F Thanksgiving Break – No School for Students, 10-month Staff 22, Th Thanksgiving Day – Federal Holiday
DECEMBER ______ 5, W Interim/Mid-Term Reports19, W Winter Recess Begins – No School (Students/Staff Return Jan 2, 2013)25, Tu Christmas Day – Federal Holiday
JANUARY ______ 1, Tu New Years Day – Federal Holiday 2, W Staff and Students Return21, M Martin Luther King Birthday – Federal Holiday18, Fr Second Quarter Ends (45 days) 22, Tu Staff Workday, Non-Student Day
FEBRUARY ____________ 3, Fr Report Cards8, Fr Staff CSI/PD Day, Non-Student Day, possible weather make-up day18, M Presidents’ Day – Federal Holiday27, W Interim/Mid-Term Reports
MARCH ____________ 1, Fr Spring Parent Conferences K-12, Non-Student Day Interim/Mid-Term Reports6 /13, W Banked Time allotted if needed for Parent Conferences, K-5 15, F Staff CSI/PD Day, Non-Student Day, possible weather make-up day28, Th Third Quarter Ends (45 days)29, Fr Staff Workday, Non-Student Day
APRIL ______ 1-5, M-F Spring Recess, No School (Students/Staff Return April 8)12, F Report Cards go home
MAY2 / 3 Th-Fr PreSchool Parent Conferences Non-Student Days for PreSchool10, Fr Interim/Mid-Term Reports16, Th Accelerated Withdrawal Date for Students of Sponsors with PCS Orders27, M Memorial Day – Federal Holiday
JUNE ______ 11, Tu Last Day, PreSchool12, W LAST DAY K-12; End Fourth Quarter (46 days) -13, Th Last Workday for Teachers, Education Aides; LHS Graduation 21, F Final Report Cards mailed to home address on file
NOTES: 1. : is the "Accelerated Withdrawal Date" for families who are
leaving the area due to PCS orders. The Principal, on a case-by-case basis, will review each request. A set of PCS orders must
be presented to the Principal before the Accelerated Withdrawal can be considered.