CLDS 2012-13

2
 Camp Lejeune Dependents SchoolsDRAFT Faculty Calendar - SY 2012-2013 E EVENT DRAFT March 29, 2012   AUGUST 1, W All Administrators On Site 20-22, M-W All Staff Return (Administrative day, staff workdays, 1 st day for staff) 23, Th First Day - 1-12; Kindergarten Orientation Day 24, Fr First Full Day for Kindergarten SEPTEMBER ______ 3, M Labor Day Federal Holiday 6, Th PreSchool Orientation 7, Fr First Day for PreSchool 24, M Interim / Mid-Term Reports OCTOBER ______ 8, M Columbus Day Federal Holiday 19, Fr Staff CSI/PD Day, Non-Student Day, possible weather make-up day 26, F First Quarter Ends (44 days) 29, M Staff Workday, Non-Student Day NOVEMBER ______ 1 / 2, Th-Fr PreSchool Parent Conferences Non-Student Days for PreSchool 2, Fr Non-Student Day, 1 st Quarter Report Card; Parent Conferences PK-12 7 /14, W Banked Time allotted if needed for Parent Conferences, PK-5 12, M Veterans’ Day Holiday 21-23, W-F Thanksgiving Break No School for Students, 10-month Staff 22, Th Thanksgiving Day Federal Holiday DECEMBER ______ 5, W Interim/Mid-Term Reports 19, W Winter Recess Begins No School (Students/Staff Return Jan 2, 2013) 25, Tu Christmas Day Federal Holiday JANUARY ______ 1, Tu New Years Day Federal Holiday 2, W Staff and Students Return 21, M Martin Luther King Birthday Federal Holiday 18, Fr Second Quarter Ends (45 days) 22, Tu Staff Workday, Non-Student Day FEBRUARY ____________ 3, Fr Report Cards 8, Fr Staff CSI/PD Day, Non-Student Day, possible weather make-up day 18, M Presidents’ Day – Federal Holiday 27, W Interim/Mid-Term Reports MARCH ____________ 1, Fr Spring Parent Conferences K-12, Non-Student Day Interim/Mid-Term Reports 6 /13, W Banked Time allotted if needed for Parent Conferences, K-5 15, F Staff CSI/PD Day, Non-Student Day, possible weather make-up day 28, Th Third Quarter Ends (45 days) 29, Fr Staff Workday, Non-Student Day  APRIL ______ 1-5, M-F Spring Recess, No School (Students/Staff Return April 8) 12, F Report Cards go home MAY 2 / 3 Th-Fr PreSchool Parent Conferences Non-Student Days for PreSchool 10, Fr Interim/Mid-Term Reports 16, Th Accelerated Withdrawal Date for Students of Sponsors with PCS Orders 27, M Memorial Day Federal Holiday JUNE ______ 11, Tu Last Day, PreSchool 12, W LAST DAY K-12; End Fourth Quarter (46 days) - 13, Th Last Workday for Teachers, Education Aides; LHS Graduation 21, F Final Report Cards mailed to home address on file NOTES: 1. : is the "Accelerated Withdrawal Date" for families who are leaving the area due to PCS orders. The Principal, on a case-by-case basis, will review each request. A set of PCS orders must be presented to the Principal before the Accelerated Withdrawal can be considered.

Transcript of CLDS 2012-13

 

 

Camp Lejeune Dependents Schools– DRAFT Faculty Calendar - SY 2012-2013 

E EVENT DRAFT March 29, 2012  

 AUGUST1, W All Administrators On Site20-22, M-W All Staff Return (Administrative day, staff workdays, 1

stday for staff)

23, Th First Day - 1-12; Kindergarten Orientation Day24, Fr First Full Day for Kindergarten

SEPTEMBER ______ 3, M  Labor Day – Federal Holiday6, Th PreSchool Orientation7, Fr First Day for PreSchool24, M Interim / Mid-Term Reports

OCTOBER ______ 8, M Columbus Day – Federal Holiday 19, Fr  Staff CSI/PD Day, Non-Student Day, possible weather make-up day26, F First Quarter Ends (44 days)29, M Staff Workday, Non-Student Day

NOVEMBER ______ 1 / 2, Th-Fr PreSchool Parent Conferences Non-Student Days for PreSchool2, Fr Non-Student Day, 1

stQuarter Report Card; Parent Conferences PK-12

7 /14, W Banked Time allotted if needed for Parent Conferences, PK-512, M Veterans’ Day Holiday 21-23, W-F Thanksgiving Break  – No School for Students, 10-month Staff 22, Th Thanksgiving Day – Federal Holiday 

DECEMBER ______ 5, W Interim/Mid-Term Reports19, W Winter Recess Begins – No School (Students/Staff Return Jan 2, 2013)25, Tu Christmas Day – Federal Holiday

JANUARY ______ 1, Tu New Years Day – Federal Holiday 2, W Staff and Students Return21, M  Martin Luther King Birthday – Federal Holiday18, Fr Second Quarter Ends (45 days) 22, Tu Staff Workday, Non-Student Day

FEBRUARY ____________ 3, Fr Report Cards8, Fr  Staff CSI/PD Day, Non-Student Day, possible weather make-up day18, M  Presidents’ Day – Federal Holiday27, W Interim/Mid-Term Reports

MARCH ____________ 1, Fr Spring Parent Conferences K-12, Non-Student Day Interim/Mid-Term Reports6 /13, W Banked Time allotted if needed for Parent Conferences, K-5 15, F Staff CSI/PD Day, Non-Student Day, possible weather make-up day28, Th  Third Quarter Ends (45 days)29, Fr  Staff Workday, Non-Student Day

 APRIL ______ 1-5, M-F Spring Recess, No School (Students/Staff Return April 8)12, F Report Cards go home

MAY2 / 3 Th-Fr PreSchool Parent Conferences Non-Student Days for PreSchool10, Fr Interim/Mid-Term Reports16, Th Accelerated Withdrawal Date for Students of Sponsors with PCS Orders27, M Memorial Day – Federal Holiday 

JUNE ______ 11, Tu Last Day, PreSchool12, W LAST DAY K-12; End Fourth Quarter (46 days) -13, Th Last Workday for Teachers, Education Aides; LHS Graduation 21, F Final Report Cards mailed to home address on file

NOTES: 1. : is the "Accelerated Withdrawal Date" for families who are

leaving the area due to PCS orders. The Principal, on a case-by-case basis, will review each request. A set of PCS orders must

be presented to the Principal before the Accelerated Withdrawal can be considered.